TECHNICAL PAPERS
Oct 1, 2001

Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)

Publication: Journal of Construction Engineering and Management
Volume 127, Issue 5

Abstract

Due to an increasingly competitive environment, construction companies are becoming more sophisticated, narrowing their focus, and becoming specialists in certain types of construction. This specialization requires more focused scheduling tools that prove to be better for certain type of projects. The critical path method (CPM) is the most utilized scheduling tool in the construction industry. However, for certain types of projects, CPM's usefulness decreases, because it becomes complex and difficult to use and understand. Alternative scheduling tools designed to be used with specific types of projects can prove to be more practical than CPM solutions. This paper provides a comparison of the CPM and a specialized tool, the linear scheduling model, by identifying critical attributes needed by any scheduling tool both at the higher management level and at the project level. Two project examples are scheduled with each method, and differences are discussed. Conclusions support that specialization of scheduling tools could be beneficial for the project manager and the project.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ahuja, H. N. ( 1994). Project management: Techniques in planning and controlling construction projects, 2nd Ed., Wiley, New York.
2.
Chrzanowski, E. N., and Johnston, D. W. (1986). “Application of linear scheduling.”J. Constr. Engrg. and Mgmt., ASCE, 112(4), 476–491.
3.
Halpin, D. ( 1998). Construction management, 2nd Ed., Wiley, New York.
4.
Harmelink, D. J. ( 1995). “Linear scheduling model: The development of a linear scheduling model with micro computer applications for highway construction project control.” PhD thesis, Iowa State University, Ames, Iowa.
5.
Harmelink, D. J., and Rowings, J. E. (1998). “Linear scheduling model: Development of controlling activity path.”J. Constr. Engrg. and Mgmt., ASCE, 124(4), 263–268.
6.
Jones, C. V. ( 1996). Visualization and optimization, Kluwer Academic, Norwell, Mass.
7.
Kerzner, H. ( 1998a). Project management: A systems approach to planning, scheduling, and controlling, 6th Ed., Wiley, New York.
8.
Kerzner, H. ( 1998b). In search of excellence in project management: Successful practices in high performance organizations, Wiley, New York.
9.
Liu, S.-S. ( 1999). “Resource-constrained scheduling of linear projects: A heuristic approach using Tabu search heuristics.” PhD thesis, Purdue University, West Lafayette, Ind.
10.
Mattila, K. G. ( 1997). “Resource leveling of linear schedules: A mathematical approach using integer linear programming,” PhD thesis, Purdue University, West Lafayette, Ind.
11.
Pollalis, S. N. ( 1993). Computer-aided project management; a visual scheduling and management system, Verlag Vieweg—Bertelsmann Publishing Group International, Weisbaden, Germany.
12.
Tufte, E. R. ( 1983). The visual display of quantitative information, Graphic Press, Cheshire, Conn.
13.
Tufte, E. R. ( 1990). Envisioning information, Graphic Press, Cheshire, Conn.
14.
Vorster, M. C., Beliveau, Y. J., and Bafna, T. ( 1992). “Linear scheduling and visualization.” Transp. Res. Rec. 1351, Transportation Research Board, Washington, D.C., 32–39.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 127Issue 5October 2001
Pages: 374 - 381

History

Received: Apr 19, 2000
Published online: Oct 1, 2001
Published in print: Oct 2001

Permissions

Request permissions for this article.

Authors

Affiliations

PhD, Res. Asst., School of Civ. Engrg., Purdue Univ., West Lafayette, IN 47907-1294.
Asst. Prof., School of Civ. Engrg., Purdue Univ., West Lafayette, IN 47907-1294.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share