Impact of Financial Package versus Technical Solution in a BOT Tender
Publication: Journal of Construction Engineering and Management
Volume 121, Issue 3
Abstract
The two main components in the tender of a privatized infrastructure project let under the build-operate-transfer (BOT) contractual arrangement are the technical design and the financial package. This paper examines the impact of a financial package when assessed against the technical design during the selection process. It is concluded that the ability to provide an attractive financial package is critical under the conditions when (1) the project is technically certain; (2) the tolls to be charged are of government's main concern; (3) competition is keen; and (4) the project viability and financing are uncertain. However, promoters must not underestimate the importance of an innovative technical solution as it could make an attractive financial package possible. The role of an innovative technical solution was never in question in the cases studied in spite of the great importance attached to the financial package by the governments.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Burke, T. (1989). “BOT franchise model—the Sydney Harbour Tunnel case study.” Proc., Conf. on Financing and Managing BOT Proj., Institute for International Research, Singapore.
2.
“Guidelines for conceptual project proposals for toll revenue transportation Projects.” (1990). Rep., California Department of Transportation, Sacramento, Calif.
3.
Issen, R. (1992). “The Johor water privatization project.”Lect. at MSc Program in Int. Constr. Mgmt., Nanyang Technological University, Singapore.
4.
Porter, J. E., and Matson, C. R. (1990). “A franchized tollway—the design, financing and management of the Tate's Cairn Tunnel, Hong Kong.”Proc., Conf. on Tunnelling, Institution of Engineers, Sydney, Australia.
5.
“Project brief for Eastern Harbour Crossing, Hong Kong.” (1986). Rep., Highways Department, Hong Kong.
6.
Rabinowe, D. (1992). “Case study on the Sabah's Labuan Water Supply and Labuan Electricity Supply Projects.”Lect. at MSc Program in Int. Constr. Mgmt., Nanyang Technological University, Singapore.
7.
Samarnphun, N. L.(1988). “Getting ready for the skytrain ride.” Business Rev., Bangkok, Thailand, 10(1), 1–15.
8.
Tiong, L. K. R.(1990). “Comparative study of BOT projects.”J. Mgmt. Engrg., ASCE, 6(1), 107–122.
9.
Tiong, L. K. R., Yeo, K. M., and McCarthy, S. C.(1992). “Critical success factors in winning BOT contracts.”J. Constr. Engrg. and Mgmt., ASCE, 118(2), 217–228.
Information & Authors
Information
Published In
Copyright
Copyright © 1995 American Society of Civil Engineers.
History
Published online: Sep 1, 1995
Published in print: Sep 1995
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.