Progress‐Based Construction Scheduling

Publication: Journal of Construction Engineering and Management
Volume 116, Issue 4

Abstract

A new construction scheduling technique, developed on the basis of progress charts and Gantt (bar) charts, is presented. The main aim of the development is to overcome the problem of fragmentation of activities during the application of the conventional critical path and precedence diagramming methods to construction projects. However, the level of detail available in these methods for the representation of precedence relationships has been preserved and extended. Timing relations are defined among any events in activities instead of the start and end only; these relations may be multiple and expressed in terms of progress level. The concepts of activity timing and scheduling and project timing are elaborated, starting from definitions of temporal constraints for single activities and proceeding through timing relations. The concepts of slacks, free slacks, and criticality are defined and discussed in detail. The process of project timing, project scheduling, updating, and slack computation are illustrated numerically on a small sample project.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Birrell, G. S. (1980). “Construction planning—Beyond the critical path.” J. Constr. Div., ASCE, 106(3), 389–407.
2.
Birrell, G. S. (1987). Discussion of “A criticism of CPM for project planning,” by A. Jaafari. Constr. Engrg. and Mgmt., ASCE, 113(2), 343–345.
3.
Chrzanowski, E. N., and Johnston, D. W. (1986). “Application of linear scheduling.” J. Constr. Engrg. and Mgmt., ASCE, 112(4), 476–491.
4.
Fiedler, K. (1985). “Special conditions for time scheduling of building modernization projects.” Project management: Clarity for the 90's (Proc. 8th INTERNET Congress), W. Vriethoff et al., eds., vol. 2, Dutch Project Management Society, 461–468.
5.
Hendrickson, C., Martinelli, D., and Rehak, D. (1987). “Hierarchical rule‐based activity duration estimation.” J. Constr. Engrg. and Mgmt., ASCE, 113(2), 288–301.
6.
Jaafari, A. (1984). “A criticism of CPM for project planning.” J. Constr. Engrg. and Mgmt., ASCE, 110(2), 316–334.
7.
Jennett, E. (1983). “Experience with and evaluation of critical path methods.” Project management: Techniques, applications and managerial issues, E. W. Davis, ed., Institute of Industrial Engineers, Atlanta, Ga., 156–186.
8.
McGough, E. H. (1982). “Scheduling: Effective methods and techniques.” J. Constr. Div., ASCE, 108(1), 75–84.
9.
Melin, J. W., and Whiteaker, B. (1981). “Fencing a bar chart.” J. Constr. Div., ASCE, 107(3), 497–507.
10.
Wiest, J. D. (1981). “Precedence diagramming method: Some unusual characteristics and their implications for project managers.” J. Oper. Mgmt., 1(3), 213–222.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 116Issue 4December 1990
Pages: 670 - 688

History

Published online: Dec 1, 1990
Published in print: Dec 1990

Permissions

Request permissions for this article.

Authors

Affiliations

Mustafa Pultar
Prof. of Bldg. Sci., Middle East Tech. Univ., 06531 Ankara, Turkey

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share