Erratum for “Gowanus Canal Superfund Site. VI: Rapid Field Screening Techniques to Verify Sediment Capping Blends”
You are viewing the correction.
VIEW THE CORRECTED ARTICLEPublication: Journal of Hazardous, Toxic, and Radioactive Waste
Volume 28, Issue 4
The following correction should be made to “Gowanus Canal Superfund Site. VI: Rapid Field Screening Techniques to Verify Sediment Capping Blends” by Nasser Hamdan, Dennis G. Grubb, David L. Adams, Andrew B. Judd, Christos D. Tsiamis, and Juliana Hess (https://doi.org/10.1061/JHTRBP.HZENG-1282):
In the paper, the sediment capping area types between Union and Carroll streets were reversed in Fig. 1. The revised Fig. 1 is included herein.
![](/cms/10.1061/JHTRBP.HZENG-1368/asset/17067c2f-d566-4ca2-8796-bdc0e20e6823/assets/images/large/figure1.jpg)
Fig. 1. (Color) Gowanus Canal Remedial Treatment Area 1 (RTA-1) showing capping blends, capping and underlying ISS areas, and general footprint of the historic “Fulton” Manufactured Gas Plant (MGP).
(Aerial Imagery Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community.)
To preserve the published version of record, these details have been corrected only in this erratum.
Information & Authors
Information
Published In
Copyright
© 2024 American Society of Civil Engineers.
History
Received: Jan 28, 2024
Accepted: Feb 6, 2024
Published online: May 29, 2024
Published in print: Oct 1, 2024
Discussion open until: Oct 29, 2024
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.