Erratum for “Sensitivity of Earned Value Schedule Forecasting to S-Curve Patterns” by Byung-Cheol Kim and Hyung-Jin Kim

You are viewing the correction.
VIEW THE CORRECTED ARTICLE
Publication: Journal of Construction Engineering and Management
Volume 140, Issue 9
Please note that Eq. (6) in the final published paper is erroneous. The error was inadvertently introduced during composition. The correct equation is
MAPE(n)=100ni=1n|APDTEAC(i)APD|
(6)
ASCE regrets these errors.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 140Issue 9September 2014

History

Received: Jun 9, 2014
Accepted: Jun 16, 2014
Published online: Jul 3, 2014
Published in print: Sep 1, 2014
Discussion open until: Dec 3, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Byung-Cheol Kim, M.ASCE [email protected]
Assistant Professor, Dept. of Civil Engineering, Ohio Univ., 114 Stocker Center, Athens, OH 45701-2927 (corresponding author). E-mail: [email protected]
Hyung-Jin Kim [email protected]
Director, Dept. of Research and Development, Kunwon Engineering Co. Ltd., Hoe-Rim Building, Nonhyeon-dong 246-1, Gangnam-gu, Seoul 135-010, South Korea. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share