Scholarly Papers
Jul 9, 2024

Assessment of the Critical Dispute Factors in Public–Private Partnership Infrastructure Projects

Publication: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 16, Issue 4

Abstract

Public-private partnership (PPP) projects would result in disagreements due to their intricate nature, extended duration, and the involvement of various parties. There is a gap in the literature on quantitively evaluating the most important indicators that contribute to a dispute in PPP projects. To comprehend the causes of disputes in PPP projects, a thorough review of the literature was carried out, leading to the classification of 41 factors leading to disputes into six categories. A survey was then conducted to gather data on how these factors are perceived as risks in PPP projects. This data was analyzed using two statistical methods, frequently adjusted importance index (FAII) and structural equation modeling (SEM), via confirmatory factor analysis (CFA) and exploratory structural equation modeling (ESEM). The results indicated that CFA is more reliable and valid than ESEM; consequently, only the CFA and FAII findings are considered. The study found that the most significant contributors to PPP project disputes are the construction-related factors group, followed closely by the design-related factors group. These findings can make critical contributions to avoiding time and cost overruns on PPP contracts, subsequently leading to better performance and higher efficiency. Furthermore, the models developed in this study may be useful in future research with similar objectives as they meet the criteria for goodness-of-fit.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Works Cited

Acharya, N. K., Y. Dai Lee, and H. Man Im. 2006. “Conflicting factors in construction projects: Korean perspective.” Eng. Constr. Archit. Manage. 13 (6): 543–566. https://doi.org/10.1108/09699980610712364.
Ahn, S., L. Crouch, T. W. Kim, and R. Rameezdeen. 2020. “Comparison of worker safety risks between onsite and offsite construction methods: A site management perspective.” J. Constr. Eng. Manage. 146 (9): 05020010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001890.
Almarri, K., and P. Blackwell. 2014. “Improving risk sharing and investment appraisal for PPP procurement success in large green projects.” Procedia-Social Behav. Sci. 119 (Mar): 847–856. https://doi.org/10.1016/j.sbspro.2014.03.095.
Anwer, S., H. Li, M. F. Antwi-Afari, W. Umer, and A. Y. Wong. 2020. “Cardiorespiratory and thermoregulatory parameters are good surrogates for measuring physical fatigue during a simulated construction task.” Int. J. Environ. Res. Public Health 17 (15): 5418. https://doi.org/10.3390/ijerph17155418.
Arditi, D., and T. Pattanakitchamroon. 2006. “Selecting a delay analysis method in resolving construction claims.” Int. J. Project Manage. 24 (2): 145–155. https://doi.org/10.1016/j.ijproman.2005.08.005.
Bao, F. M. 2023. “Assessing the public-private partnership handover: Experience from China’s water sector.” Util. Policy 80 (Feb): 101469. https://doi.org/10.1016/j.jup.2022.101469.
Bashar, T., I. W. H. Fung, L. C. Jaillon, and D. Wang. 2021. “Major obstacles to public-private partnership (PPP)-financed infrastructure development in China.” Sustainability 13 (12): 6718. https://doi.org/10.3390/su13126718.
Bevilacqua, C., F. Calabrò, and L. Della Spina, eds. 2020. New metropolitan perspectives. Cham, Switzerland: Springer International Publishing.
Bing, L. A. 2005. “The allocation of risk in PPP/PFI construction projects in the UK.” Int. J. Project Manage. 23 (1): 25–35. https://doi.org/10.1016/j.ijproman.2004.04.006.
Bolaños, L. G. 2019. “Bankruptcy policy and surface transportation public-private partnerships: A comparative analysis of the US and Europe.” Case Stud. Transp. Policy 7 (2): 185–195. https://doi.org/10.1016/j.cstp.2019.04.003.
Boussabaine, A. 2013. Risk pricing strategies for public-private partnership projects (Vol. 4). New York: Wiley.
Bristow, D. I., and R. Vasilopoulos. 1995. “The new CCDC 2: Facilitating dispute resolution of construction projects.” Constr. Law J. 11: 95.
Broome, J. C., and R. W. Hayes. 1997. “A comparison of the clarity of traditional construction contracts and of the new engineering contract.” Int. J. Project Manage. 15 (4): 255–261. https://doi.org/10.1016/S0263-7863(96)00078-6.
Burger, P., and I. Hawkesworth. 2011. “How to attain value for money: Comparing PPP and traditional infrastructure public procurement.” OECD J. Budgeting 11 (1): 91–146. https://doi.org/10.1787/budget-11-5kg9zc0pvq6j.
Burger, P. T. 2009. The effects of the financial crisis on public-private partnerships. Washington, DC: International Monetary Fund.
Cakmak, E., and P. I. Cakmak. 2014. “An analysis of causes of disputes in the construction industry using analytical network process.” Procedia-Social Behav. Sci. 109 (Jan): 183–187. https://doi.org/10.1016/j.sbspro.2013.12.441.
Calabrese, D. 2008. Strategic communication for privatization, public-private partnerships, and private participation in infrastructure projects. Washington, DC: World Bank.
Casady, C., and F. Peci. 2020. “The institutional challenges of public-private partnerships (PPPs) in transition economies: Lessons from Kosovo.” Econ. Res. 34 (1): 1949–1965. https://doi.org/10.1080/1331677X.2020.1860791.
Cheung, E., A. P. Chan, and S. Kajewski. 2009. “Enhancing value for money (VFM) analysis in public–private partnership (PPP) projects: Lessons from the UK and Australia.” J. Financ. Manage. Property Constr. 14 (1): 7–20. https://doi.org/10.1108/13664380910942617.
Cheung, E., A. P. Chan, and S. Kajewski. 2012. “Factors contributing to successful public-private partnership projects: Comparing Hong Kong with Australia and the United Kingdom.” J. Facil. Manage. 10 (1): 45–58. https://doi.org/10.1108/14725961211200397.
Cheung, E. C. 2009. “Enhancing value for money in public private partnership projects: Findings from a survey conducted in Hong Kong and Australia compared to findings from previous research in the UK.” J. Financ. Manage. Property Constr. 14 (1): 7–20. https://doi.org/10.1108/13664380910942617.
Cheung, S. O. 2006. “Are construction disputes inevitable?” IEEE Trans. Eng. Manage. 53 (3): 456–470. https://doi.org/10.1109/TEM.2006.877445.
Cruz, C., and R. Marques. 2013. “Exogenous determinants for renegotiating public infrastructure concessions: Evidence from Portugal.” J. Constr. Eng. Manage. 139 (9): 1082–1090. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000710.
dos Santos, I. J., J. E. França, L. F. Santos, and A. N. Haddad. 2020. “Allocation of performance shaping factors in the risk assessment of an offshore installation.” J. Loss Prev. Process Ind. 64 (Mar): 104085. https://doi.org/10.1016/j.jlp.2020.104085.
Ebrahim Jokar, B. A. 2021. “Assessing and prioritizing risks in public-private partnership (PPP) projects using the integration of fuzzy multi-criteria decision-making methods.” Oper. Res. Perspect. 8 (Jan): 100190. https://doi.org/10.1016/j.orp.2021.100190.
Ejohwomu, A. O. 2016. “Causes of conflicts in construction projects in Nigeria: Consultant’s and contractor’s perspective.” Niger. J. Technol. 35 (2): 270–277. https://doi.org/10.4314/njt.v35i2.6.
Engel, E., R. Fischer, and A. Galetovic. 2010. “The economics of infrastructure finance: Public-private partnerships versus public provision.” EIB Papers 15 (1): 40–69.
Etemadinia, H., and M. Tavakolan. 2017. “Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects.” Int. J. Constr. Manage. 21 (1): 93–112. https://doi.org/10.1080/15623599.2018.1511235.
Feng, Z., J. Song, X. Yang, and R. Guo. 2023. “Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts.” Eur. J. Oper. Res. 307 (1): 484–496. https://doi.org/10.1016/j.ejor.2022.09.018.
Funke, K. I. 2013. Budgeting and reporting for public-private partnerships. Paris: Organisation for Economic Co-operation and Development.
Garg, S., and M. Dayal. 2020. “Road learnings: Evolution of public-private partnerships in the Indian highway sector.” Transp. Res. Procedia 48 (Jan): 2488–2510. https://doi.org/10.1016/j.trpro.2020.08.259.
Garg, S., and S. Garg. 2016. “Rethinking public-private partnerships: An unbundling approach.” Transp. Res. Procedia 25 (Jan): 3789–3807. https://doi.org/10.1016/j.trpro.2017.05.241.
Grimsey, D., and M. K. Lewis. 2002. “Evaluating the risks of public private partnerships for infrastructure projects.” Int. J. Project Manage. 20 (2): 107–118. https://doi.org/10.1016/S0263-7863(00)00040-5.
Grimsey, D., and M. K. Lewis. 2005. “Are public private partnerships value for money? Evaluating alternative approaches and comparing academic and practitioner views.” Accounting Forum 29 (4): 345–378. https://doi.org/10.1016/j.accfor.2005.01.001.
Guasch, J. L. 2004. Granting and renegotiating infrastructure concessions: Doing it right. Washington, DC: World Bank Publications.
Hair, J. F., J. J. Risher, M. Sarstedt, and C. M. Ringle. 2019. “When to use and how to report the results of PLS-SEM.” Eur. Bus. Rev. 31 (1): 2–24. https://doi.org/10.1108/EBR-11-2018-0203.
Hanawi, K. A. 2020. “Barriers to the implementation of public-private partnerships in the healthcare sector in the Kingdom of Saudi Arabia.” PLoS One 15 (6): e0233802. https://doi.org/10.1371/journal.pone.0233802.
Hashim, H., A. I. Che-Ani, and K. Ismail. 2017. “Review of issues and challenges for public private partnership (PPP) project performance in Malaysia.” In Vol. 1891 of Proc., AIP Conf. Melville, NY: AIP Publishing.
Hodge, G., and C. Greve. 2018. “Contemporary public–private partnership: Towards a global research agenda.” Financ. Account. Manage. 34 (1): 3–16. https://doi.org/10.1111/faam.12132.
Hodge, G. A., and C. Greve. 2007. “Public–private partnerships: An international performance review.” Public Adm. Rev. 67 (3): 545–558. https://doi.org/10.1111/j.1540-6210.2007.00736.x.
Ibbs, C. W. 2005. “Impact of change’s timing on labor productivity.” J. Constr. Eng. Manage. 131 (11): 1219–1223. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:11(1219).
Ibrahim, A. D., A. D. Price, and A. R. Dainty. 2006. “The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria.” J. Financ. Manage. Property Constr. 11 (3): 149–164. https://doi.org/10.1108/13664380680001086.
Iossa, E., and D. Martimort. 2015. “The simple microeconomics of public–private partnerships.” J. Public Econ. Theory 17 (1): 4–48. https://doi.org/10.1111/jpet.12114.
Irwin, T. 2007. “Five ways governments can control spending commitments in public–private partnerships.” In Proc., Int. Seminar on Strengthening Public Investment and Managing Fiscal Risks from Public-Private Partnerships, 7–8. Washington, DC: International Monetary Fund.
Iyer, K. C. 2008. “Understanding time delay disputes in construction contracts.” Int. J. Project Manage. 26 (2): 174–184. https://doi.org/10.1016/j.ijproman.2007.05.002.
Ke, Y. W. 2011. “Understanding the risks in China’s PPP projects: Ranking of their probability and consequence.” Eng. Constr. Archit. Manage. 18 (5): 481–496. https://doi.org/10.1108/09699981111165176.
Kim, K., G. Lee, and S. Kim. 2020. “A study on the application of blockchain technology in the construction industry.” KSCE J. Civ. Eng. 24 (9): 2561–2571. https://doi.org/10.1007/s12205-020-0188-x.
Kline, T. J. 2005. Psychological testing: A practical approach to design and evaluation. Thousand Oaks, CA: SAGE.
Kong, Y. 2020. Different Models of PPP. Kuala Lumpur, Malysia: Public–Private Infrastructure Advisory Facility.
Kumaraswamy, M. M. 1997. “Conflicts, claims and disputes in construction.” Eng. Constr. Archit. Manage. 4 (2): 95–111. https://doi.org/10.1108/eb021042.
Kwofie, T. E., C. Ohis Aigbavboa, and W. D. Thwala. 2019. “Communication performance challenges in PPP projects: Cases of Ghana and South Africa.” Built Environ. Project Asset Manage. 9 (5): 628–641. https://doi.org/10.1108/BEPAM-11-2018-0137.
Le, N., W. O. Chong, and K. Sullivan. 2020. “Construction risks in developing countries: A Vietnam case study.” J. Adv. Perform. Inf. Value 12 (1): 30–49. https://doi.org/10.37265/japiv.v12i1.41.
Lee, J. K. 2022. “Build-transfer-operate with risk sharing approach for railway public-private-partnership project in Korea.” Asian Transp. Stud. 8 (Jan): 100061. https://doi.org/10.1016/j.eastsj.2022.100061.
Lee, S., Y. H. Ahn, and J. Lee. 2020. “Post-handover defect risk profile of residential buildings using loss distribution approach.” J. Manage. Eng. 36 (4): 04020021. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000785.
Lee, W.-Y., S.-H. Lee, C. Jin, and C.-T. Hyun. 2021. “Development of the RACI model for processes of the closure phase in construction programs.” Sustainability 13 (4): 1806. https://doi.org/10.3390/su13041806.
Levitt, R. E. 2019. Public–private partnerships for infrastructure development: Finance, stakeholder alignment, governance. Cheltenham, UK: Edward Elgar.
Magalhães, L. B. 2020. “Project management in public-private partnerships: A conceptual framework based on a systematic literature review.” Gestão Produção 27 (Mar): e3772. https://doi.org/10.1590/0104-530X3772-20.
Marsh, H. W., A. J. Morin, P. D. Parker, and G. Kaur. 2014. “Exploratory structural equation modeling: An integration of the best features of exploratory and confirmatory factor analysis.” Ann. Rev. Clin. Psychol. 10 (Mar): 85–110. https://doi.org/10.1146/annurev-clinpsy-032813-153700.
Marsh, P. 2017. Contracting for engineering and construction projects. London: Routledge.
McNamara, A. J., and S. M. Sepasgozar. 2020. “Developing a theoretical framework for intelligent contract acceptance.” Constr. Innov. 20 (3): 421–445. https://doi.org/10.1108/CI-07-2019-0061.
Mitropoulos, P., and G. Howell. 2001. “Model for understanding, preventing, and resolving project disputes.” J. Constr. Eng. Manage. 127 (3): 223–231. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(223).
Mukilan, K., C. Rameshbabu, and P. Velumani. 2021. “A modified particle swarm optimization for risk assessment and claim management in engineering procurement construction projects.” Mater. Today Proc. 42 (Jan): 786–794. https://doi.org/10.1016/j.matpr.2020.11.315.
Nagpal, R. K. 2016. “Accelerating public-private partnership model of infrastructure projects in India: Existing frameworks and challenges.” J. Global Res. Anal. 5 (1): 260.
Nanpaphathr Navalersuph, C. C. 2021. “Governance of Public–private partnerships in transportation infrastructure projects based on Thailand’s experiences.” Case Stud. Transp. Policy 9 (3): 1211–1218. https://doi.org/10.1016/j.cstp.2021.06.008.
Ng, S. T. 2012. “Factors influencing the success of PPP at feasibility stage—A tripartite comparison study in Hong Kong.” Habitat Int. 36 (4): 423–432. https://doi.org/10.1016/j.habitatint.2012.02.002.
Nguyen, P. T., and P. C. Nguyen. 2020. Risk management in engineering and construction: A case study in design-build projects in Vietnam. Eng. Technol. Appl. Sci. Res. 10 (1): 5237–5241. https://doi.org/10.48084/etasr.3286.
Osei-Kyei, R., and A. P. Chan. 2016. “Implementing public–private partnership (PPP) policy for public construction projects in Ghana: Critical success factors and policy implications.” Int. J. Constr. Manage. 17 (2): 113–123. https://doi.org/10.1080/15623599.2016.1207865.
Penacerrada, P. J. 2021. “Strategies to improve the handover of building adaptation projects.” Accessed April 1, 2013. https://ntnuopen.ntnu.no/ntnu-xmlui/handle/11250/2787203.
Posner, P. R. 2009. Public-private partnerships: The relevance of budgeting. Paris: Organisation for Economic Co-operation and Development.
Rafaat, R., H. Osman, M. Georgy, and M. Elsaid. 2020. “Preferred risk allocation in Egypt’s water sector PPPs.” Int. J. Constr. Manage. 20 (6): 585–597. https://doi.org/10.1080/15623599.2019.1703087.
Rodriguez, J. 2019. “Public-private partnership pros and cons.” Accessed April 1, 2013. https://www.thebalancesmb.com/public-private-partnership-pros-and-cons-844713.
Sarmento, J. M., and L. Renneboog. 2016. “Anatomy of public-private partnerships: Their creation, financing and renegotiations.” Int. J. Managing Projects Bus. 9 (1): 94–122. https://doi.org/10.1108/IJMPB-03-2015-0023.
Shi, L., W. Li, and Y. He. 2020. “An incentive analysis of availability payment mechanism in PPP projects.” IEEE Access 8 (Jun): 106046–106058. https://doi.org/10.1109/ACCESS.2020.2999932.
Song, J., Y. Hu, and Z. Feng. 2017. “Factors influencing early termination of PPP projects in China.” J. Manage. Eng. 34 (1): 05017008. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000572.
Stadler, L. 2012. “Designing public-private partnerships for development.” Accessed April 1, 2013. https://www.cairn.info/revue-management-2012-1-page-78.html.
Tamošaitienė, J., H. Sarvari, D. W. Chan, and M. Cristofaro. 2021. “Assessing the barriers and risks to private sector participation in infrastructure construction projects in developing countries of middle east.” Sustainability 13 (1): 153. https://doi.org/10.3390/su13010153.
Thomas, R., and M. Wright. 2020. Construction contract claims. Basingstoke, UK: Palgrave Macmillan.
UNCTAD (UN Trade and Development). 2020. “What are PPPs?” Accessed April 1, 2013. https://investmentpolicy.unctad.org/pages/27/what-are-ppps.
Untari, S. 2016. “Public-private partnerships in improving the quality of education for the poor in Indonesia.” Public Policy Adm. Res. 6 (6): 65–72.
Wang, F., M. Xiong, B. Niu, and X. Zhuo. 2018. “Impact of government subsidy on BOT contract design: Price, demand, and concession period.” Transp. Res. Part B: Methodol. 110: 137–159.
Wang, S. Q., M. F. Dulaimi, and M. Y. Aguria. 2004. “Risk management framework for construction projects in developing countries.” Constr. Manage. Econ. 22 (3): 237–252. https://doi.org/10.1080/0144619032000124689.
Weston, R., and P. A. Gore Jr. 2006. “A brief guide to structural equation modeling.” Couns. Psychologist 34 (5): 719–751. https://doi.org/10.1177/0011000006286345.
World Bank. 2015. The seven sins of flawed public-private partnerships. Washington, DC: World Bank.
World Bank. 2021. “Key issues in PPPs for the poor.” Accessed April 1, 2013. https://ppp.worldbank.org/public-private-partnership/key-issues-ppps-poor.
Yang, J. B., C. C. Yang, and C. K. Kao. 2010. “Evaluating schedule delay causes for private participating public construction works under the build-operate-transfer model.” Int. J. Project Manage. 28 (6): 569–579. https://doi.org/10.1016/j.ijproman.2009.10.005.
Yuan, J. L. 2018. “Modelling residual value risk through ontology to address vulnerability of PPP project system.” Adv. Eng. Inf. 38 (Oct): 776–793. https://doi.org/10.1016/j.aei.2018.10.009.
Zhang, X. 2005. “Critical success factors for public–private partnerships in infrastructure development.” J. Constr. Eng. Manage. 131 (1): 3–14. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(3).
Zheng, X., Y. Liu, J. Jiang, L. Thomas, and N. Su. 2021. “Predicting the litigation outcome of PPP project disputes between public authority and private partner using an ensemble model.” J. Bus. Econ. Manage. 22 (2): 320–345. https://doi.org/10.3846/jbem.2021.13219.

Information & Authors

Information

Published In

Go to Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
Volume 16Issue 4November 2024

History

Received: Sep 9, 2023
Accepted: Apr 4, 2024
Published online: Jul 9, 2024
Published in print: Nov 1, 2024
Discussion open until: Dec 9, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Professor, Dept. of Civil Engineering, Qatar Univ., P.O. Box 2713, Doha, Qatar (corresponding author). ORCID: https://orcid.org/0000-0003-2602-3318. Email: [email protected]
Khalid K. Naji, Ph.D., A.M.ASCE [email protected]
Associate Professor, Dept. of Civil Engineering, Qatar Univ., P.O. Box 2713, Doha, Qatar. Email: [email protected]
Samar Al-Sharafi [email protected]
Graduate Student, College of Engineering, Qatar Univ., P.O. Box 2713, Doha, Qatar. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • A Structural Equation Model on Critical Risk and Success in Public–Private Partnership: Exploratory Study, Journal of Risk and Financial Management, 10.3390/jrfm17080354, 17, 8, (354), (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share