Abstract

General contractors outsource increasingly complex and sophisticated specialized tasks to many subcontractors. In doing so, general contractors typically pick the subcontractor that offers the lowest price for the work to be done, but an informed decision can be made only if the general contractor can assess potential subcontractors’ performance before hiring them. The performance of subcontractor candidates is measured in this study by using key performance indicators (KPIs) identified after an extensive review of previous research. These KPIs, the analytic hierarchy process (AHP), and the evidential reasoning (ER) method are combined to create a performance-based subcontractor selection (PBSS) model. The proposed model is generalizable and can help general contractors to assess the performance of subcontractor candidates relative to the general contractor’s critical objectives including subcontractor performance in relation to price, duration, quality, safety, and environmental impact. The model is scalable in that other objectives can be added or can replace existing ones depending on the characteristics of the project and the preferences of the general contractor. A real-world case study was used to show that this model was easily implemented and that it generated practical results. A general contractor can use PBSS confidently to evaluate the overall performance of each subcontractor candidate before they select one for a specific part of the project.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.

References

Abbasianjahromi, H., H. Rajaie, and E. Shakeri. 2013. “A framework for subcontractor selection in the construction industry.” J. Civ. Eng. Manage. 19 (2): 158–168. https://doi.org/10.3846/13923730.2012.743922.
Abbasianjahromi, H., M. Sepehri, and O. Abbasi. 2018. “A decision-making framework for subcontractor selection in construction projects.” Eng. Manage. J. 30 (2): 141–152. https://doi.org/10.1080/10429247.2018.1448967.
Alarcón, L. F., A. Grillo, J. Freire, and S. Diethelm. 2001. “Learning from collaborative benchmarking in the construction industry.” In Proc., 9th Annual Conf. of the Int. Group for Lean Construction (IGLC-9). Towcester, UK: International Group for Lean Construction.
Ali, H. A. E. M., I. A. Al-Sulaihi, and K. S. Al-Gahtani. 2013. “Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia.” J. King Saud Univ. Eng. Sci. 25 (2): 125–134. https://doi.org/10.1016/j.jksues.2012.03.002.
Alkilani, S., and M. Loosemore. 2022. “Project performance measurement for small-and-medium sized construction contractors in the Jordanian construction industry.” Construct. Manage. Econ. 40 (10): 743–769. https://doi.org/10.1080/01446193.2022.2108863.
Arslan, G., S. Kivrak, M. T. Birgonul, and I. Dikmen. 2008. “Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES).” Autom. Constr. 17 (4): 480–488. https://doi.org/10.1016/j.autcon.2007.08.004.
Atkinson, R. 1999. “Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria.” Int. J. Project Manage. 17 (6): 337–342. https://doi.org/10.1016/S0263-7863(98)00069-6.
Bazargan-Lari, M. R. 2014. “An evidential reasoning approach to optimal monitoring of drinking water distribution systems for detecting deliberate contamination events.” J. Cleaner Prod. 78 (2014): 1–14. https://doi.org/10.1016/j.jclepro.2014.04.061.
Beatham, S., C. Anumba, T. Thorpe, and I. Hedges. 2005. “An integrated business improvement system (IBIS) for construction.” Measuring Bus. Excellence 9 (2): 42–55. https://doi.org/10.1108/13683040510602876.
BSI (British Standards Institution). 2007. Occupational health and safety assessment series—Requirements. OHSAS 18001:2007. London: BSI.
Chan, A. P., and A. P. Chan. 2004. “Key performance indicators for measuring construction success.” Benchmarking: Int. J. 11 (2): 203–221. https://doi.org/10.1108/14635770410532624.
Choudhry, R. M., J. W. Hinze, M. Arshad, and H. F. Gabriel. 2012. “Subcontracting practices in the construction industry of Pakistan.” J. Constr. Eng. Manage. 138 (12): 1353–1359. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000562.
Cooke, B., and P. Williams. 1998. Construction planning, programming and control. Basingstoke, UK: Macmillan Press. https://doi.org/10.1007/978-1-349-14293-4.
Cox, R. F., R. R. Issa, and D. Ahrens. 2003. “Management’s perception of key performance indicators for construction.” J. Constr. Eng. Manage. 129 (2): 142–151. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:2(142).
Cui, C., Y. Liu, A. Hope, and J. Wang. 2018. “Review of studies on the public–private partnerships (PPP) for infrastructure projects.” Int. J. Project Manage. 36 (5): 773–794. https://doi.org/10.1016/j.ijproman.2018.03.004.
Dey, P. K. 2004. “Analytic hierarchy process helps evaluate project in Indian oil pipelines industry.” Int. J. Oper. Prod. Manage. 24 (6): 588–604. https://doi.org/10.1108/01443570410538122.
El-Mashaleh, M. S. 2009. “A construction subcontractor selection model.” Jordan J. Civ. Eng. 3 (4): 375–383.
El-Mashaleh, M. S., R. Edward Minchin, Jr., and W. J. O’Brien. 2007. “Management of construction firm performance using benchmarking.” J. Manage. Eng. 23 (1): 10–17. https://doi.org/10.1061/(ASCE)0742-597X(2007)23:1(10).
El-Mashaleh, M. S., S. M. Rababeh, and K. H. Hyari. 2010. “Utilizing data envelopment analysis to benchmark safety performance of construction contractors.” Int. J. Project Manage. 28 (1): 61–67. https://doi.org/10.1016/j.ijproman.2009.04.002.
Enshassi, A., R. M. Choudhry, P. E. Mayer, and Y. Shoman. 2008. “Safety performance of subcontractors in the Palestinian construction industry.” J. Construct. Dev. Countries 13 (1): 51–62. https://doi.org/10.3846/1392-3730.2009.15.269-280.
Enshassi, A., S. Mohamed, and S. Abushaban. 2009. “Factors affecting the performance of construction projects in the Gaza strip.” J. Civ. Eng. Manage. 15 (3): 269–280.
FHWA (Federal Highway Administration). 2023. “Construction program guide, cost-plus-time (A+B) bidding.” Accessed May 23, 2023. https://www.fhwa.dot.gov/construction/cqit/a_plus_b.cfm.
Forouzanpour, H., A. Mirzazadeh, and S. Nodoust. 2016. “An evidential reasoning approach for the earned value management.” Sci. Iran. 23 (2): 685–700. https://doi.org/10.24200/sci.2016.3855.
Głodziński, E. 2021. “Performance measurement embedded in organizational project management of general contractors operating in Poland.” Measuring Bus. Excellence 25 (3): 271–286. https://doi.org/10.1108/MBE-06-2019-0051.
Gudienė, N., A. Banaitis, V. Podvezko, and N. Banaitienė. 2014. “Identification and evaluation of the critical success factors for construction projects in Lithuania: AHP approach.” J. Civ. Eng. Manage. 20 (3): 350–359. https://doi.org/10.3846/13923730.2014.914082.
Hartmann, A., F. Y. Y. Ling, and J. S. Tan. 2009. “Relative importance of subcontractor selection criteria: Evidence from Singapore.” J. Constr. Eng. Manage. 135 (9): 826–832. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:9(826).
Hatush, Z., and M. Skitmore. 1997. “Evaluating contractor prequalification data: Selection criteria and project success factors.” Construct. Manage. Econ. 15 (2): 129–147. https://doi.org/10.1080/01446199700000002.
Horta, I., A. Camanho, and A. Lima. 2013. “Design of performance assessment system for selection of contractors in construction industry e-marketplaces.” J. Constr. Eng. Manage. 139 (8): 910–917. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000691.
Horta, I. M., A. S. Camanho, and J. M. Da Costa. 2010. “Performance assessment of construction companies integrating key performance indicators and data envelopment analysis.” J. Constr. Eng. Manage. 136 (5): 581–594. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000145.
ISO. 2004. Environmental management systems—Requirements with guidance for use. ISO 14001:2004. Geneva: ISO.
ISO. 2008. Standard, quality management and quality assurance, vocabulary. ISO 9001:2008. Geneva: ISO.
Kagioglou, M., R. Cooper, and G. Aouad. 2001. “Performance management in construction: A conceptual framework.” Construct. Manage. Econ. 19 (1): 85–95. https://doi.org/10.1080/01446190010003425.
Ko, C.-H., M.-Y. Cheng, and T.-K. Wu. 2007. “Evaluating sub-contractors performance using EFNIM.” Autom. Constr. 16 (4): 525–530. https://doi.org/10.1016/j.autcon.2006.09.005.
Kometa, S. T., P. O. Olomolaiye, and F. C. Harris. 1995. “An evaluation of clients’ needs and responsibilities in the construction process.” Eng. Constr. Archit. Manage. 2 (1): 57–76. https://doi.org/10.1108/eb021003.
Kumaraswamy, M. M., and A. Thorpe. 1996. “Systematizing construction project evaluations.” J. Manage. Eng. 12 (1): 34–39. https://doi.org/10.1061/(ASCE)0742-597X(1996)12:1(34).
Lee, A., R. Cooper, and G. Aouad. 2000. “A methodology for designing performance measures for the UK construction industry.” In Proc., Bizarre Fruit Postgraduate Research Conf. on the Built and Human Environment. Manchester, UK: Salford Univ.
Le-Hoai, L., Y. D. Lee, and A. T. Nguyen. 2013. “Estimating time performance for building construction projects in Vietnam.” KSCE J. Civ. Eng. 17 (2013): 1–8. https://doi.org/10.1007/s12205-013-0862-3.
Ling, F. Y. Y., and S. Peh. 2005. “Key performance indicators for measuring contractors’ performance.” Archit. Sci. Rev. 48 (4): 357–365. https://doi.org/10.3763/asre.2005.4843.
Luu, T. V., S. Y. Kim, and T. A. Huynh. 2008. “Improving project management performance of large contractors using benchmarking approach.” Int. J. Project Manage. 26 (7): 758–769. https://doi.org/10.1016/j.ijproman.2007.10.002.
Mahdi, I. M., M. J. Riley, S. M. Fereig, and A. P. Alex. 2002. “A multi-criteria approach to contractor selection.” Eng. Constr. Archit. Manage. 9 (1): 29–37. https://doi.org/10.1108/eb021204.
Mahmoud, A. S., M. H. Ahmad, Y. M. Yatim, and Y. A. Dodo. 2020. “Key performance indicators (KPIs) to promote building developers safety performance in the construction industry.” J. Ind. Eng. Manage. 13 (2): 371–401. https://doi.org/10.3926/jiem.3099.
Marzouk, M. M., A. A. El Kherbawy, and M. Khalifa. 2013. “Factors influencing sub-contractors selection in construction projects.” HBRC J. 9 (2): 150–158. https://doi.org/10.1016/j.hbrcj.2013.05.001.
Mbachu, J. 2008. “Conceptual framework for the assessment of subcontractors’ eligibility and performance in the construction industry.” Construct. Manage. Econ. 26 (5): 471–484. https://doi.org/10.1080/01446190801918730.
Moatassem, A., and A. Alshahri. 2019. “Optimizing planning of build–operate–transfer projects to maximize investor profit.” Can. J. Civ. Eng. 46 (1): 26–37. https://doi.org/10.1139/cjce-2017-0327.
Nassar, N., and S. AbouRizk. 2014. “Practical application for integrated performance measurement of construction projects.” J. Manage. Eng. 30 (6): 1943–5479. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000287.
Ng, S. T., K. P. Cheng, and R. M. Skitmore. 2005. “A framework for evaluating the safety performance of construction contractors.” Build. Environ. 40 (10): 1347–1355. https://doi.org/10.1016/j.buildenv.2004.11.025.
Ng, S. T., and M. Skitmore. 2014. “Developing a framework for subcontractor appraisal using a balanced scorecard.” J. Civ. Eng. Manage. 20 (2): 149–158. https://doi.org/10.3846/13923730.2013.802705.
Okudan, O., C. Budayan, and Y. Arayici. 2022. “Identification and prioritization of key performance indicators for the construction small and medium enterprises.” Teknik Dergi 33 (5): 12635–12662. https://doi.org/10.18400/tekderg.977849.
Parmenter, D. 2015. Key performance indicators: Developing, implementing, and using winning KPIs. New York: Wiley.
Pocock, J. B., C. T. Hyun, L. Y. Liu, and M. K. Kim. 1996. “Relationship between project interaction and performance indicators.” J. Constr. Eng. Manage. 122 (2): 165–176. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:2(165).
Polat, G. 2016. “Subcontractor selection using the integration of the AHP and PROMETHEE methods.” J. Civ. Eng. Manage. 22 (8): 1042–1054. https://doi.org/10.3846/13923730.2014.948910.
Robinson, H. S., C. J. Anumba, P. M. Carrillo, and A. M. Al-Ghassani. 2005. “Business performance measurement practices in construction engineering organizations.” Measuring Bus. Excellence 9 (1): 13–22. https://doi.org/10.1108/13683040510588800.
Saaty, R. W. 1987. “The analytic hierarchy process—What it is and how it is used.” Math. Modelling 9 (3–5): 161–176. https://doi.org/10.1016/0270-0255(87)90473-8.
Shafer, G. 1976. A mathematical theory of evidence. Princeton, NJ: Princeton University Press.
Shah, J., and R. Apte. 2015. “Causes of delay in construction of bridge girders.” J. Mech. Civ. Eng. 12 (1): 8–12. https://doi.org/10.9790/1684-12140812.
Songer, A., K. Molenaar, and G. Robinson. 1996. “Selection factors and success criteria for design-build in the US and UK.” J. Constr. Procure. 2 (2): 69–82.
Sonmez, M., J. B. Yang, and G. D. Holt. 2001. “Addressing the contractor selection problem using an evidential reasoning approach.” Eng. Constr. Archit. Manage. 8 (3): 198–210. https://doi.org/10.1108/eb021182.
Suganthi, L. 2018. “Multi expert and multi criteria evaluation of sectoral investments for sustainable development: An integrated fuzzy AHP, VIKOR/DEA methodology.” Sustainable Cities Soc. 43 (2018): 144–156. https://doi.org/10.1016/j.scs.2018.08.022.
Tekce, I., and A. Dikbas. 2011. “Yuklenici insaat firmalari icin cok kriterli performans olcme modeli gelistirilmesi.” İTÜDERGİSİ/a 10 (1): 151–164.
Tripathi, K., and K. Jha. 2018. “An empirical study on performance measurement factors for construction organizations.” KSCE J. Civ. Eng. 22 (4): 1052–1066. https://doi.org/10.1007/s12205-017-1892-z.
Tserng, H. P., and P. H. Lin. 2002. “An accelerated subcontracting and procuring model for construction projects.” Autom. Constr. 11 (1): 105–125. https://doi.org/10.1016/S0926-5805(01)00056-5.
Ulubeyli, S., E. Manisali, and A. Kazaz. 2010. “Subcontractor selection practices in international construction projects.” J. Civ. Eng. Manage. 16 (1): 47–56. https://doi.org/10.3846/jcem.2010.04.
Vukomanović, M., M. Radujković, and M. M. Nahod. 2010. “Leading, lagging and perceptive performance measures in the construction industry.” Organ. Technol. Manage. Constr.: Int. J. 2 (1): 103–111.
Walker, D. H. 1995. “An investigation into construction time performance.” Construct. Manage. Econ. 13 (3): 263–274. https://doi.org/10.1080/01446199500000030.
Wuellner, W. W. 1990. “Project performance evaluation checklist for consulting engineers.” J. Manage. Eng. 6 (3): 270–281. https://doi.org/10.1061/(ASCE)9742-597X(1990)6:3(270).
Xiao, H., and D. Proverbs. 2003. “Factors influencing contractor performance: An international investigation.” Eng. Constr. Archit. Manage. 10 (5): 322–332. https://doi.org/10.1108/09699980310502937.
Xu, D. L., and J. B. Yang. 2005. “Intelligent decision system based on the evidential reasoning approach and its applications.” J. Telecommun. Inf. Technol. 3 (3): 73–80. https://doi.org/10.26636/jtit.2005.3.323.
Xu, D.-L. 2012. “An introduction and survey of the evidential reasoning approach for multiple criteria decision analysis.” Ann. Oper. Res. 195 (1): 163–187. https://doi.org/10.1007/s10479-011-0945-9.
Yang, H., J. F. Yeung, A. P. Chan, Y. Chiang, and D. W. Chan. 2010. “A critical review of performance measurement in construction.” J. Facil. Manage. 8 (4): 269–284. https://doi.org/10.1108/14725961011078981.
Yang, J. B., and M. G. Singh. 1994. “An evidential reasoning approach for multiple attribute decision making with uncertainty.” IEEE Trans. Syst. Manage. Cybern. 24 (1): 1–18. https://doi.org/10.1109/21.259681.
Yasamis-Speroni, F., D.-E. Lee, and D. Arditi. 2012. “Evaluating the quality performance of pavement contractors.” J. Constr. Eng. Manage. 138 (10): 1114–1124. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000539.
Yeung, J. F., A. P. Chan, D. W. Chan, and L. K. Li. 2007. “Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study.” Construct. Manage. Econ. 25 (12): 1219–1237. https://doi.org/10.1080/01446190701598673.
Ying, F., J. Tookey, and J. Seadon. 2018. “Measuring the invisible: A key performance indicator for managing construction logistics performance.” Benchmarking: Int. J. 25 (6): 1921–1934. https://doi.org/10.1108/BIJ-11-2016-0176.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 8August 2024

History

Received: Jul 5, 2023
Accepted: Feb 23, 2024
Published online: May 23, 2024
Published in print: Aug 1, 2024
Discussion open until: Oct 23, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Visiting Research Scholar, Dept. of Civil, Architectural, and Environmental Engineering, Illinois Institute of Technology, Chicago, IL 60616 (corresponding author). ORCID: https://orcid.org/0000-0001-8345-0768. Email: [email protected]
Professor Emeritus, Dept. of Civil, Architectural, and Environmental Engineering, Illinois Institute of Technology, Chicago, IL 60616. ORCID: https://orcid.org/0000-0002-1580-324X. Email: [email protected]
Professor, Faculty of Civil Engineering, Istanbul Technical Univ., Maslak, Istanbul, 34469, Turkey. ORCID: https://orcid.org/0000-0003-2431-033X. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share