Comprehensive Understanding of Factors Impacting Competitive Construction Bidding

Publication: Journal of Construction Engineering and Management
Volume 150, Issue 4

Abstract

Construction competitive bidding has been studied by many researchers; however, their focus was mainly on certain bidding aspects. Thus, despite their value, existing bidding models have limited applicability for various reasons including the noninclusion of some real-life factors that impact bidding-related decisions. As such, there is a need for identifying a comprehensive list of bidding factors that impact construction bidding–related decisions, studying their associations, and identifying understudied factors to direct future research efforts. This paper fills this knowledge gap. First, the authors conducted a systematic selection of 124 construction bidding–related articles published within the past 40 years. Second, the authors identified a list of 43 bidding factors from the contractor’s perspective and divided them into four groups (project, bidding environment, economy, and company) based on their characteristics and relevance. Thereafter, the authors implemented cluster analysis and social network analysis (SNA) to quantitatively analyze the level of inclusion, co-occurrence, and interconnectivity among the bidding factors and identify the gaps in the literature. Results of cluster analysis revealed that previous studies focused mainly on company-related factors, while economy-related factors were the least studied. Also, SNA outcomes highlighted that experience in similar project and availability and costs of rental labor/equipment/material are the most studied factors in theoretical discussions, while number of competitors and size of the project are the most investigated factors in developed models. Consequently, this paper identified understudied bidding factors, including company reputation level in the market, bidding method, bidding stages, and contractor’s risk attitude. Thus, this paper contributes to the body of knowledge by promoting a comprehensive understanding of bidding-related factors and providing a road map for incorporating critical understudied bidding-related factors. This would minimize redundancies and maximize the effectiveness of future bidding-related research. Ultimately, this should provide better decision-making for all associated stakeholders.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data and models generated or analyzed during the study are included in the published article.

References

Abdul Nabi, M., and I. H. El-adaway. 2020. “Modular construction: Determining decision-making factors and future research needs.” J. Manage. Eng. 36 (6): 04020085. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000859.
Abotaleb, I. S., and I. H. El-adaway. 2017. “Construction bidding markup estimation using a multistage decision theory approach.” J. Constr. Eng. Manage. 143 (1): 04016079. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001204.
Abotaleb, I. S., and I. H. El-adaway. 2019. “A network-based methodology for quantitative knowledge gap identification in construction simulation and modeling research.” In Proc., Computing in Civil Engineering 2019: Visualization, Information Modeling, and Simulation, 522–529. Reston, VA: ASCE.
Ahmad, I. 1990. “Decision-support system for modeling bid/no-bid decision problem.” J. Constr. Eng. Manage. 116 (4): 595–608. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(595).
Ahmad, I., and I. Minkarah. 1988. “Questionnaire survey on bidding in construction.” J. Manage. Eng. 4 (3): 229–243. https://doi.org/10.1061/(ASCE)9742-597X(1988)4:3(229).
Ahmed, M. O. 2015. “Construction bidding and the winner’s curse.” Master’s thesis, Dept. of Civil and Environmental Engineering, Mississippi State Univ.
Ahmed, M. O., and I. H. El-adaway. 2023a. “An integrated game-theoretic and reinforcement learning modeling for multi-stage construction and infrastructure bidding.” Construct. Manage. Econ. 41 (3): 183–207. https://doi.org/10.1080/01446193.2022.2124528.
Ahmed, M. O., and I. H. El-adaway. 2023b. “Data-driven analysis of construction bidding stage–related causes of disputes.” J. Manage. Eng. 39 (5): 04023026. https://doi.org/10.1061/JMENEA.MEENG-5426.
Ahmed, M. O., I. H. El-adaway, and K. T. Coatney. 2022. “Solving the negative earnings dilemma of multi-stage bidding in public construction and infrastructure projects: A game theory–based approach.” J. Manage. Eng. 38 (2): 04021087. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000997.
Ahmed, M. O., I. H. El-adaway, K. T. Coatney, and M. S. Eid. 2015. “Multi-stage bidding for construction contracts: A game theory approach.” In Proc., 5th Int./11th Construction Specialty Conf. Vancouver, BC, Canada: Canadian Society for Civil Engineering.
Ahmed, M. O., I. H. El-adaway, K. T. Coatney, and M. S. Eid. 2016. “Construction bidding and the winner’s curse: Game theory approach.” J. Constr. Eng. Manage. 142 (2): 04015076. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001058.
Ahuja, H. N., and V. Aranachalam. 1984. “Risk evaluation in resource allocation.” J. Constr. Eng. Manage. 110 (3): 324–336. https://doi.org/10.1061/(ASCE)0733-9364(1984)110:3(324).
Aibinu, A. A., and A. M. Al-Lawati. 2010. “Using PLS-SEM technique to model construction organizations’ willingness to participate in e-bidding.” Autom. Constr. 19 (6): 714–724. https://doi.org/10.1016/j.autcon.2010.02.016.
Akintoye, A. 2000. “Analysis of factors influencing project cost estimating practice.” Construct. Manage. Econ. 18 (1): 77–89. https://doi.org/10.1080/014461900370979.
Anderberg, M. R. 2014. Vol. 19 of Cluster analysis for applications: Probability and mathematical statistics: A series of monographs and textbooks. Cambridge, MA: Academic Press.
Asgari, S., R. Awwad, A. Kandil, and I. Odeh. 2016. “Impact of considering need for work and risk on performance of construction contractors: An agent-based approach.” Autom. Constr. 65 (May): 9–20. https://doi.org/10.1016/j.autcon.2016.01.004.
Assaad, R., M. O. Ahmed, I. H. El-adaway, A. Elsayegh, and V. S. S. Nadendla. 2021. “Comparing the impact of learning in bidding decision-making processes using algorithmic game theory.” J. Manage. Eng. 37 (1): 04020099. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000867.
Awwad, R. 2016. “Evolutionary simulation of contractors’ learning and behavior under two bid-tendering approaches.” J. Manage. Eng. 32 (2): 04015041. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000400.
Awwad, R., and M. Ammoury. 2019. “Owner’s perspective on evolution of bid prices under various price-driven bid selection methods.” J. Comput. Civ. Eng. 33 (2): 04018061. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000803.
Awwad, R., S. Asgari, and A. Kandil. 2015. “Developing a virtual laboratory for construction bidding environment using agent-based modeling.” J. Comput. Civ. Eng. 29 (6): 04014105. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000440.
Bageis, A., and C. Fortune. 2006. “Bid/no-bid decision modelling for construction projects.” In Proc., 22nd Annual ARCOM Conf., 511–521. Birmingham, UK: Association of Researchers in Construction Management.
Bageis, A., and C. Fortune. 2009. “Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors.” Construct. Manage. Econ. 27 (1): 53–71. https://doi.org/10.1080/01446190802596220.
Ball, M., M. Farshchi, and M. Grilli. 2000. “Competition and the persistence of profits in the UK construction industry.” Construct. Manage. Econ. 18 (7): 733–745. https://doi.org/10.1080/014461900433023.
Ballesteros-Pérez, P., M. C. González-Cruz, and A. Cañavate-Grimal. 2013. “On competitive bidding: Scoring and position probability graphs.” Int. J. Project Manage. 31 (3): 434–448. https://doi.org/10.1016/j.ijproman.2012.09.012.
Ballesteros-Pérez, P., M. C. González-Cruz, J. P. Pastor-Ferrando, and M. Fernández-Diego. 2012. “The iso-score curve graph. A new tool for competitive bidding.” Autom. Constr. 22 (Mar): 481–490. https://doi.org/10.1016/j.autcon.2011.11.007.
Ballesteros-Pérez, P., M. Skitmore, A. Cerezo-Narváez, M. C. González-Cruz, A. Pastor-Fernández, and M. Otero-Mateo. 2021. “Standard deviation of bids for construction contract auctions.” J. Constr. Eng. Manage. 147 (8): 04021096. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002118.
Ballesteros-Pérez, P., M. Skitmore, A. Cerezo-Narváez, M. Otero-Mateo, and A. Pastor-Fernández. 2023. “Gates’ bidding model (revisited).” Construct. Manage. Econ. 41 (7): 576–586. https://doi.org/10.1080/01446193.2023.2181980.
Ballesteros-Pérez, P., M. Skitmore, E. Pellicer, and X. Zhang. 2016. “Scoring rules and competitive behavior in best-value construction auctions.” J. Constr. Eng. Manage. 142 (9): 04016035. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001144.
Bastian, M., S. Heymann, and M. Jacomy. 2009. “Gephi: An open-source software for exploring and manipulating networks.” ICWSM 3 (1): 361–362. https://doi.org/10.1609/icwsm.v3i1.13937.
Bloch, T., and R. Sacks. 2020. “Clustering information types for semantic enrichment of building information models to support automated code compliance checking.” J. Comput. Civ. Eng. 34 (6): 04020040. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000922.
Bown, M. J., and A. Sutton. 2010. “Quality control in systematic reviews and meta-analyses.” Eur. J. Vasc. Endovasc. Surg. 40 (5): 669–677.
Cambridge Intelligence. 2020. “Social network analysis and visualization.” Accessed October 19, 2021. https://info.cambridge-intelligence.com/social-network-visualization-white-paper.
Carr, R. I. 1983. “Impact of number of bidders on competition.” J. Constr. Eng. Manage. 109 (1): 61–73. https://doi.org/10.1061/(ASCE)0733-9364(1983)109:1(61).
Carr, R. I. 1987. “Optimum markup by direct solution.” J. Constr. Eng. Manage. 113 (1): 138–150. https://doi.org/10.1061/(ASCE)0733-9364(1987)113:1(138).
Castelblanco, G., J. Guevara, and J. Salazar. 2022. “Remedies to the PPP crisis in the COVID-19 pandemic: Lessons from the 2008 global financial crisis.” J. Manage. Eng. 38 (3): 04022017. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001036.
Cattell, D., P. Bowen, and A. Kaka. 2010. “The risks of unbalanced bidding.” Construct. Manage. Econ. 28 (4): 333–344. https://doi.org/10.1080/01446191003663264.
Chao, L. C., and C. N. Liou. 2007. “Risk-minimizing approach to bid-cutting limit determination.” Construct. Manage. Econ. 25 (8): 835–843. https://doi.org/10.1080/01446190701393018.
Chao, L.-C., and C.-P. Kuo. 2018. “Neural-network-centered approach to determining lower limit of combined rate of overheads and markup.” J. Constr. Eng. Manage. 144 (2): 04017117. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001440.
Chao, L.-C., and S.-J. Liaw. 2019. “Fuzzy logic model for determining minimum overheads-cum-markup rate.” J. Constr. Eng. Manage. 145 (4): 04019008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001632.
Chaovalitwongse, W. A., W. Wang, T. P. Williams, and P. Chaovalitwongse. 2012. “Data mining framework to optimize the bid selection policy for competitively bid highway construction projects.” J. Constr. Eng. Manage. 138 (2): 277–286. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000386.
Chileshe, N., N. Kavishe, and D. Edwards. 2021. “Critical factors influencing the bid or no-bid decision of the indigenous small building contractors in Tanzania.” Constr. Innovation 21 (2): 182–202. https://doi.org/10.1108/CI-09-2019-0098.
Chinowsky, P. S., J. Diekmann, and J. O’Brien. 2010. “Project organizations as social networks.” J. Constr. Eng. Manage. 136 (4): 452–458. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000161.
Chisala, M. L. 2017. “Quantitative bid or no-bid decision-support model for contractors.” J. Constr. Eng. Manage. 143 (12): 04017088. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001407.
Choudhury, N., and S. Uddin. 2016. “Time-aware link prediction to explore network effects on temporal knowledge evolution.” Scientometrics 108 (2): 745–776. https://doi.org/10.1007/s11192-016-2003-5.
Christodoulou, S. 2004. “Optimum bid markup calculation using neurofuzzy systems and multidimensional risk analysis algorithm.” J. Comput. Civ. Eng. 18 (4): 322–330. https://doi.org/10.1061/(ASCE)0887-3801(2004)18:4(322).
Chua, D. K. H., and D. Li. 2000. “Key factors in bid reasoning model.” J. Constr. Eng. Manage. 126 (5): 349–357. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(349).
Cooray, S. 2021. “A qualitative enhancement to quantitative social network analysis.” Inf. Soc. 37 (4): 227–246. https://doi.org/10.1080/01972243.2021.1926028.
Crowley, L. G., and D. E. Hancher. 1995. “Risk assessment of competitive procurement.” J. Constr. Eng. Manage. 121 (2): 230–237. https://doi.org/10.1061/(ASCE)0733-9364(1995)121:2(230).
Deep, S., T. Gajendran, and M. Jefferies. 2021. “A systematic review of ‘enablers of collaboration’ among the participants in construction projects.” Int. J. Constr. Manage. 21 (9): 919–931. https://doi.org/10.1080/15623599.2019.1596624.
De La Garza, J. M., and J. W. Melin. 1986. “Prepayment ability to offset inflation.” J. Constr. Eng. Manage. 112 (4): 514–529. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:4(514).
de Neufville, R., and D. King. 1991. “Risk and need-for-work premiums in contractor bidding.” J. Constr. Eng. Manage. 117 (4): 659–673. https://doi.org/10.1061/(ASCE)0733-9364(1991)117:4(659).
Dikmen, I., M. T. Birgonul, and A. K. Gur. 2007a. “A case-based decision support tool for bid mark-up estimation of international construction projects.” Autom. Constr. 17 (1): 30–44. https://doi.org/10.1016/j.autcon.2007.02.009.
Dikmen, I., M. T. Birgonul, and S. Han. 2007b. “Using fuzzy risk assessment to rate cost overrun risk in international construction projects.” Int. J. Project Manage. 25 (5): 494–505. https://doi.org/10.1016/j.ijproman.2006.12.002.
Dozzi, S. P., S. M. AbouRizk, and S. L. Schroeder. 1996. “Utility-theory model for bid markup decisions.” J. Constr. Eng. Manage. 122 (2): 119–124. https://doi.org/10.1061/(ASCE)0733-9364(1996)122:2(119).
Drew, D. S., and M. Skitmore. 2006. “Testing Vickery’s revenue equivalence theory in construction auctions.” J. Constr. Eng. Manage. 132 (4): 425–428. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:4(425).
Dulaimi, M. F., and H. G. Shan. 2002. “The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore.” Construct. Manage. Econ. 20 (7): 601–610. https://doi.org/10.1080/01446190210159890.
Duzkale, A. K., and G. Lucko. 2016. “Exposing uncertainty in bid preparation of steel construction cost estimating: II. Comparative analysis and quantitative C-I-V-I-L classification.” J. Constr. Eng. Manage. 142 (10): 04016050. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001124.
Dyer, D., J. H. Kagel, and D. Levin. 1989. “A comparison of naive and experienced bidders in common value offer auctions: A laboratory analysis.” Econ. J. 99 (394): 108–115. https://doi.org/10.2307/2234207.
Egemen, M., and A. N. Mohamed. 2007. “A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions.” Build. Environ. 42 (3): 1373–1385. https://doi.org/10.1016/j.buildenv.2005.11.016.
Eissa, R., M. S. Eid, and E. Elbeltagi. 2021. “Current applications of game theory in construction engineering and management research: A social network analysis approach.” J. Constr. Eng. Manage. 147 (7): 04021066. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002085.
El-adaway, I. H., G. Ali, R. Assaad, A. Elsayegh, and I. S. Abotaleb. 2019. “Analytic overview of citation metrics in the civil engineering domain with focus on construction engineering and management specialty area and its subdisciplines.” J. Constr. Eng. Manage. 145 (10): 04019060. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001705.
Elfving, J. A., I. D. Tommelein, and G. Ballard. 2005. “Consequences of competitive bidding in project-based production.” J. Purchasing Supply Manage. 11 (4): 173–181. https://doi.org/10.1016/j.pursup.2005.12.001.
El-Mashaleh, M. S. 2013. “Empirical framework for making the bid/no-bid decision.” J. Manage. Eng. 29 (3): 200–205. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000147.
Elsayegh, A., and I. H. El-adaway. 2021. “Holistic study and analysis of factors affecting collaborative planning in construction.” J. Constr. Eng. Manage. 147 (4): 04021023. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002031.
Eriksson, P. E., and T. Nilsson. 2008. “Partnering the construction of a Swedish pharmaceutical plant: Case study.” J. Manage. Eng. 24 (4): 227–233. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:4(227).
Eriksson, P. E., and M. Westerberg. 2011. “Effects of cooperative procurement procedures on construction project performance: A conceptual framework.” Int. J. Project Manage. 29 (2): 197–208. https://doi.org/10.1016/j.ijproman.2010.01.003.
Farid, F. 1989. “Sensitivity analysis of construction contract prices using spreadsheets.” J. Comput. Civ. Eng. 3 (3): 238–252. https://doi.org/10.1061/(ASCE)0887-3801(1989)3:3(238).
Farid, F. 1990. “Pricing construction contracts under Tax Reform Act of 1986.” J. Constr. Eng. Manage. 116 (2): 300–315. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:2(300).
Farid, F., and L. T. Boyer. 1985. “Fair and reasonable markup (FaRM) pricing model.” J. Constr. Eng. Manage. 111 (4): 374–390. https://doi.org/10.1061/(ASCE)0733-9364(1985)111:4(374).
Fayek, A. 1998. “Competitive bidding strategy model and software system for bid preparation.” J. Constr. Eng. Manage. 124 (1): 1–10. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(1).
Freeman, L. C. 1978. “Centrality in social networks conceptual clarification.” Social Networks 1 (3): 215–239. https://doi.org/10.1016/0378-8733(78)90021-7.
Friedman, L. 1956. “A competitive-bidding strategy.” Oper. Res. 4 (1): 104–112. https://doi.org/10.1287/opre.4.1.104.
Fu, W. K., D. S. Drew, and H. P. Lo. 2002. “The effect of experience on contractors’ competitiveness in recurrent bidding.” Construct. Manage. Econ. 20 (8): 655–666. https://doi.org/10.1080/0144619022000014060.
Griffis, F. H. 1992. “Bidding strategy: Winning over key competitors.” J. Constr. Eng. Manage. 118 (1): 151–165. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(151).
Gunduz, M., and I. Al-Ajji. 2022. “Employment of CHAID and CRT decision tree algorithms to develop bid/no-bid decision-making models for contractors.” Eng. Constr. Archit. Manage. 29 (9): 3712–3736. https://doi.org/10.1108/ECAM-01-2021-0042.
Han, S. H., and J. E. Diekmann. 2001. “Making a risk-based bid decision for overseas construction projects.” Construct. Manage. Econ. 19 (8): 765–776. https://doi.org/10.1080/01446190110072860.
Han, S. H., J. E. Diekmann, and J. H. Ock. 2005. “Contractor’s risk attitudes in the selection of international construction projects.” J. Constr. Eng. Manage. 131 (3): 283–292. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(283).
Hartono, B., and C. M. Yap. 2011. “Understanding risky bidding: A prospect-contingent perspective.” Construct. Manage. Econ. 29 (6): 579–593. https://doi.org/10.1080/01446193.2011.569733.
Hatush, Z., and M. Skitmore. 1997. “Criteria for contractor selection.” Construct. Manage. Econ. 15 (1): 19–38. https://doi.org/10.1080/014461997373088.
Hunter, J. D. 2007. “Matplotlib: A 2D graphics environment.” Comput. Sci. Eng. 9 (3): 90–95. https://doi.org/10.1109/MCSE.2007.55.
Hyari, K. H., and T. Alamayreh. 2023. “Unbalanced bidding in construction projects: A contractors’ perspective.” Int. J. Constr. Manage. 23 (12): 2058–2066.
Ioannou, P. G. 2019. “Friedman’s bidding model: Errors and corrections.” J. Constr. Eng. Manage. 145 (10): 04019058. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001695.
Ioannou, P. G. 2022. “Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid.” J. Constr. Eng. Manage. 148 (3): 04021205. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002244.
Ioannou, P. G., and R. E. Awwad. 2010. “Below-average bidding method.” J. Constr. Eng. Manage. 136 (9): 936–946. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000202.
Ishii, N., Y. Takano, and M. Muraki. 2014. “An order acceptance strategy under limited engineering man-hours for cost estimation in engineering–procurement–construction projects.” Int. J. Project Manage. 32 (3): 519–528. https://doi.org/10.1016/j.ijproman.2013.07.009.
Jain, A., F. S. Yoon, K. Kang, and M. Hastak. 2022. “Implementation of the data-driven analytics protocol through facility management and real estate industry cases.” J. Manage. Eng. 38 (1): 04021077. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000894.
Jarkas, A. M., S. A. Mubarak, and C. Y. Kadri. 2014. “Critical factors determining bid/no bid decisions of contractors in Qatar.” J. Manage. Eng. 30 (4): 05014007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000223.
Jin, R., S. Gao, A. Cheshmehzangi, and E. Aboagye-Nimo. 2018. “A holistic review of off-site construction literature published between 2008 and 2018.” J. Cleaner Prod. 202 (Nov): 1202–1219. https://doi.org/10.1016/j.jclepro.2018.08.195.
Khan, S. S., and A. Ahmad. 2004. “Cluster center initialization algorithm for K-means clustering.” Pattern Recogn. Lett. 25 (11): 1293–1302. https://doi.org/10.1016/j.patrec.2004.04.007.
Kim, D. Y., S. H. Han, and H. Kim. 2008. “Discriminant analysis for predicting ranges of cost variance in international construction projects.” J. Constr. Eng. Manage. 134 (6): 398–410. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:6(398).
Kim, H. J., and K. F. Reinschmidt. 2006. “A dynamic competition model for construction contractors.” Construct. Manage. Econ. 24 (9): 955–965. https://doi.org/10.1080/01446190600799729.
Kim, H.-J., and K. F. Reinschmidt. 2011. “Effects of contractors’ risk attitude on competition in construction.” J. Constr. Eng. Manage. 137 (4): 275–283. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000284.
Kim, J., and M. Hastak. 2018. “Social network analysis: Characteristics of online social networks after a disaster.” Int. J. Inf. Manage. 38 (1): 86–96. https://doi.org/10.1016/j.ijinfomgt.2017.08.003.
Konno, Y. 2014. “Japanese competitive bid entry qualifications: An examination of public works.” Construct. Manage. Econ. 32 (10): 957–967. https://doi.org/10.1080/01446193.2014.948465.
Krippendorff, K. 2004. Content analysis: An introduction to its methodology. Thousand Oaks, CA: SAGE.
Kumar, A. 2021. “Elbow method vs silhouette score—Which is better?” Accessed September 8, 2022. https://vitalflux.com/elbow-method-silhouette-score-which-better/.
Lee, C.-Y., H.-Y. Chong, P.-C. Liao, and X. Wang. 2017. “Critical review of social network analysis applications in complex project management.” J. Manage. Eng. 34 (2): 04017061. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000579.
Leśniak, A., and E. Plebankiewicz. 2015. “Modeling the decision-making process concerning participation in construction bidding.” J. Manage. Eng. 31 (2): 04014032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000237.
Li, G., C. Chen, I. Martek, Y. Ao, and J. Dai. 2021a. “Bid or no-bid decision model for international construction projects: Evidential reasoning approach.” J. Constr. Eng. Manage. 147 (2): 04020161. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001984.
Li, G., C. Chen, G. Zhang, and I. Martek. 2020a. “Bid/no-bid decision factors for Chinese international contractors in international construction projects.” Eng. Constr. Archit. Manage. 27 (7): 1619–1643. https://doi.org/10.1108/ECAM-11-2018-0526.
Li, G., G. Zhang, C. Chen, and I. Martek. 2020b. “Empirical bid or no bid decision process in international construction projects: Structural equation modeling framework.” J. Constr. Eng. Manage. 146 (6): 04020050. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001830.
Li, H., and P. E. D. Love. 1999. “Combining rule-based expert systems and artificial neural networks for mark-up estimation.” Construct. Manage. Econ. 17 (2): 169–176. https://doi.org/10.1080/014461999371664.
Li, H., L. Y. Shen, and P. E. D. Love. 1999. “ANN-based mark-up estimation system with self-explanatory capacities.” J. Constr. Eng. Manage. 125 (3): 185–189. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:3(185).
Li, L., Q. Zhang, J. Tian, and H. Wang. 2018. “Characterizing information propagation patterns in emergencies: A case study with Yiliang earthquake.” Int. J. Inf. Manage. 38 (1): 34–41. https://doi.org/10.1016/j.ijinfomgt.2017.08.008.
Li, M., and B. Ashuri. 2021. “Proportional Cox hazards model to quantify the likelihood of underestimation in transportation projects.” J. Constr. Eng. Manage. 147 (10): 04021134. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002164.
Li, M., M. Baek, and B. Ashuri. 2021b. “Forecasting ratio of low bid to owner’s estimate for highway construction.” J. Constr. Eng. Manage. 147 (1): 04020157. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001970.
Li, Y., and H. Wu. 2012. “A clustering method based on K-means algorithm.” Physics Procedia 25 (Jan): 1104–1109. https://doi.org/10.1016/j.phpro.2012.03.206.
Liu, J., Z. Cui, X. Yang, and M. Skitmore. 2018. “Experimental investigation of the impact of risk preference on construction bid markups.” J. Manage. Eng. 34 (3): 04018003. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000596.
Liu, S. L., S. Y. Wang, and K. K. Lai. 2005. “A general multivariate analysis approach for determining bid mark-up strategy.” Construct. Manage. Econ. 23 (4): 347–353. https://doi.org/10.1080/0144619042000190216.
Lo, W., and M.-R. Yan. 2009. “Evaluating qualification-based selection system: A simulation approach.” J. Constr. Eng. Manage. 135 (6): 458–465. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000013.
Lowe, D., and J. Parvar. 2004. “A logistic regression approach to modeling the contractor’s decision to bid.” Construct. Manage. Econ. 22 (6): 643–653. https://doi.org/10.1080/01446190310001649056.
Lu, W., A. M. M. Liu, S. Rowlinson, and S. W. Poon. 2013. “Sharpening competitive edge through procurement innovation: Perspectives from Chinese international construction companies.” J. Constr. Eng. Manage. 139 (3): 347–351. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000614.
MacQueen, J. 1967. “Some methods for classification and analysis of multivariate observations.” In Proc., 5th Berkeley Symp. on Mathematical Statistics and Probability. Berkeley, CA: Univ. of California Press.
Marzouk, M., and E. Mohamed. 2018. “Modeling bid/no bid decisions using fuzzy fault tree.” Constr. Innovation 18 (1): 90–108. https://doi.org/10.1108/CI-11-2016-0060.
Marzouk, M., and O. Moselhi. 2003. “A decision support tool for construction bidding.” Constr. Innovation 3 (2): 111–124. https://doi.org/10.1108/14714170310814882.
McKinney, W. 2010. “Data structures for statistical computing in Python.” In Proc., 9th Python in Science Conf., 51–56. Austin, TX: Enthought.
Messner, J. 2019. An introduction to the building industry for architectural engineers. State College, PA: Pennsylvania State Univ.
Metham, M., V. Benjaoran, and A. Sedthamanop. 2022. “An evaluation of green road incentive procurement in road construction projects by using the AHP.” Int. J. Constr. Manage. 22 (3): 501–513. https://doi.org/10.1080/15623599.2019.1635757.
Millman, K. J., and M. Aivazis. 2011. “Python for scientists and engineers.” Comput. Sci. Eng. 13 (2): 9–12. https://doi.org/10.1109/MCSE.2011.36.
Mochtar, K., and D. Arditi. 2001. “Pricing strategy in the US construction industry.” Construct. Manage. Econ. 19 (4): 405–415. https://doi.org/10.1080/01446190010020372.
Mohamed, E., P. Jafari, and A. Hammad. 2022. “Mixed qualitative–quantitative approach for bidding decisions in construction.” Eng. Constr. Archit. Manage. 29 (6): 2328–2357. https://doi.org/10.1108/ECAM-12-2020-1060.
Moher, D., A. Liberati, J. Tetzlaff, D. G. Altman, and The PRISMA Group. 2009. “Preferred reporting items for systematic reviews and meta-analyses: The PRISMA statement.” J. Clin. Epidemiol. 62 (10): 1006–1012. https://doi.org/10.1016/j.jclinepi.2009.06.005.
Moreno, J. 1960. The sociometry reader. Glencoe, IL: Free Press.
Moselhi, O., T. Hegazy, and P. Fazio. 1993. “DBID: Analogy-based DSS for bidding in construction.” J. Constr. Eng. Manage. 119 (3): 466–479. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:3(466).
Mutikanga, H. E., M. Abdul Nabi, G. G. Ali, I. H. El-adaway, and A. Caldwell. 2022. “Postaward construction and contract management of engineering, procurement, and construction hydropower projects: Two case studies from Uganda.” J. Manage. Eng. 38 (6): 05022012. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001088.
Neuendorf, K. A. 2002. The content analysis guidebook. Thousand Oaks, CA: SAGE.
Ngai, S. C., D. S. Drew, H. P. Lo, and M. Skitmore. 2002. “A theoretical framework for determining the minimum number of bidders in construction bidding competitions.” Construct. Manage. Econ. 20 (6): 473–482. https://doi.org/10.1080/01446190210151041.
Oke, A., A. Omoraka, and A. Olatunbode. 2020. “Appraisal of factors affecting bidding decisions in Nigeria.” Int. J. Constr. Manage. 20 (2): 169–175. https://doi.org/10.1080/15623599.2018.1484846.
Olatunji, O. A., O. I. Aje, and S. Makanjuola. 2017. “Bid or no-bid decision factors of indigenous contractors in Nigeria.” Eng. Constr. Archit. Manage. 24 (3): 378–392. https://doi.org/10.1108/ECAM-01-2016-0029.
Olatunji, O. A., C. D. E. Ramanayaka, F. E. Rotimi, and J. O. B. Rotimi. 2022. “Analysis of contractors’ administrative characteristics in bid decision factors.” Eng. Constr. Archit. Manage. 30 (6): 2420–2435. https://doi.org/10.1108/ECAM-12-2021-1063.
Oliphant, T. E. 2006. A guide to NumPy. Spanish Fork, UT: Trelgol Publishing.
Oliphant, T. E. 2007. “Python for scientific computing.” Comput. Sci. Eng. 9 (3): 10–20. https://doi.org/10.1109/MCSE.2007.58.
Oo, B. L., D. Drew, and H. Lo. 2007a. “Modelling contractors’ mark-up behaviour in different construction markets.” Eng. Constr. Archit. Manage. 14 (5): 447–462. https://doi.org/10.1108/09699980710780755.
Oo, B. L., D. S. Drew, and H. P. Lo. 2007b. “Applying a random coefficients logistic model to contractors’ decision to bid.” Construct. Manage. Econ. 25 (4): 387–398. https://doi.org/10.1080/01446190600922552.
Oo, B. L., D. S. Drew, and H. P. Lo. 2008a. “A comparison of contractors’ decision to bid behaviour according to different market environments.” Int. J. Project Manage. 26 (4): 439–447. https://doi.org/10.1016/j.ijproman.2007.06.001.
Oo, B. L., D. S. Drew, and H. P. Lo. 2008b. “Heterogeneous approach to modeling contractors’ decision-to-bid strategies.” J. Constr. Eng. Manage. 134 (10): 766–775. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(766).
Oo, B. L., D. S. Drew, and G. Runeson. 2010b. “Competitor analysis in construction bidding.” Construct. Manage. Econ. 28 (12): 1321–1329. https://doi.org/10.1080/01446193.2010.520721.
Oo, B. L., and B. T. H. Lim. 2016. “Game-based learning in construction management courses: A case of bidding game.” Eng. Constr. Archit. Manage. 23 (1): 4–19. https://doi.org/10.1108/ECAM-02-2015-0029.
Oo, B. L., B. T. H. Lim, and G. Runeson. 2023. “Mark-up on construction projects: What have we learnt in the last 20 years?” Eng. Constr. Archit. Manage. 30 (9): 4319–4338. https://doi.org/10.1108/ECAM-01-2022-0070.
Oo, B. L., F. Y. Y. Ling, and A. Soo. 2014. “Information feedback and bidders’ competitiveness in construction bidding.” Eng. Constr. Archit. Manage. 21 (5): 571–585. https://doi.org/10.1108/ECAM-04-2013-0037.
Oo, B. L., H. P. Lo, and B. Lim. 2012. “The effect of bidding success in construction bidding.” Eng. Constr. Archit. Manage. 19 (1): 25–39. https://doi.org/10.1108/09699981211192553.
Oo, B.-L., D. S. Drew, and H.-P. Lo. 2010a. “Modeling the heterogeneity in contractors’ mark-up behavior.” J. Constr. Eng. Manage. 136 (7): 720–729. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000186.
Otte, E., and R. Rousseau. 2002. “Social network analysis: A powerful strategy, also for the information sciences.” J. Inf. Sci. 28 (6): 441–453. https://doi.org/10.1177/016555150202800601.
Padhi, S. S., and P. K. J. Mohapatra. 2010. “Centralized bid evaluation for awarding of construction projects: A case of India government.” Int. J. Project Manage. 28 (3): 275–284. https://doi.org/10.1016/j.ijproman.2009.06.001.
Palaneeswaran, E., and M. M. Kumaraswamy. 2000. “Contractor selection for design/build projects.” J. Constr. Eng. Manage. 126 (5): 331–339. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:5(331).
Pedregosa, F., et al. 2011. “Scikit-learn: Machine learning in Python.” J. Mach. Learn. Res. 12 (Nov): 2825–2830.
Perera, B. A. K. S., M. K. C. S. Wijewickrama, W. R. S. C. Ranaweera, and I. S. W. Gamage. 2021. “Significant factors influencing the bid mark-up decision of infrastructure projects in Sri Lanka.” Int. J. Constr. Manage. 21 (8): 769–783. https://doi.org/10.1080/15623599.2019.1583849.
Pham, V. H. S., and K. A. Phan. 2023. “Elaboration of willingness to pay and compensation demanded for costly bid preparation.” Int. J. Constr. Manage. 23 (7): 1131–1137.
Pow, J., K. Gayen, and L. Elliott. 2012. “Understanding complex interactions using social network analysis.” J. Clin. Nurs. 21 (19): 2772–2779. https://doi.org/10.1111/j.1365-2702.2011.04036.x.
Rastegar, H., B. Arbab Shirani, S. H. Mirmohammadi, and E. Akhondi Bajegani. 2021. “Stochastic programming model for bidding price decision in construction projects.” J. Constr. Eng. Manage. 147 (4): 04021025. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002008.
Rawlinson, S., and J. Raftery. 1997. “Price stability and the business cycle: UK construction bidding patterns 1970–91.” Construct. Manage. Econ. 15 (1): 5–18. https://doi.org/10.1080/014461997373079.
Rintala, K., D. Root, G. Ive, and P. Bowen. 2008. “Organizing a bidding competition for a toll road concession in South Africa: The case of Chapman’s Peak Drive.” J. Manage. Eng. 24 (3): 146–155. https://doi.org/10.1061/(ASCE)0742-597X(2008)24:3(146).
Rowles, D., and S. Cahalan. 2020. “Local government procurement laws—Who the heck is a ‘responsible bidder’?” Accessed October 28, 2021. https://www.sgrlaw.com/local-government-procurement-laws-who-the-heck-is-a-responsible-bidder/.
Saldana, J. 2021. The coding manual for qualitative researchers. Thousand Oaks, CA: SAGE.
Selinger, S. 1983. “Payment timing as a factor in bid evaluation.” J. Constr. Eng. Manage. 109 (3): 335–341. https://doi.org/10.1061/(ASCE)0733-9364(1983)109:3(335).
Seydel, J. 2003. “Evaluating and comparing bidding optimization effectiveness.” J. Constr. Eng. Manage. 129 (3): 285–292. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:3(285).
Seydel, J., and D. L. Olson. 1990. “Bids considering multiple criteria.” J. Constr. Eng. Manage. 116 (4): 609–623. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(609).
Shamseer, L., D. Moher, M. Clarke, D. Ghersi, A. Liberati, M. Petticrew, P. Shekelle, and L. A. Stewart. 2015. “Preferred reporting items for systematic review and meta-analysis protocols (PRISMA-P) 2015: Elaboration and explanation.” BMJ 349 (Jan). https://doi.org/10.1136/bmj.g7647.
Shash, A. A. 1993. “Factors considered in tendering decisions by top UK contractors.” Construct. Manage. Econ. 11 (2): 111–118. https://doi.org/10.1080/01446199300000004.
Shash, A. A., and N. H. Abdul-Hadi. 1992. “Factors affecting a contractor’s mark-up size decision in Saudi Arabia.” Construct. Manage. Econ. 10 (5): 415–429. https://doi.org/10.1080/01446199200000039.
Shash, A. A., and N. H. Abdul-Hadi. 1993. “The effect of contractor size on mark-up size decision in Saudi Arabia.” Construct. Manage. Econ. 11 (6): 421–429. https://doi.org/10.1080/01446199300000048.
Shokri-Ghasabeh, M., and N. Chileshe. 2016. “Critical factors influencing the bid/no bid decision in the Australian construction industry.” Constr. Innovation 16 (2): 127–157. https://doi.org/10.1108/CI-04-2015-0021.
Skitmore, R. M., A. N. Pettitt, and R. McVinish. 2007. “Gates’ bidding model.” J. Constr. Eng. Manage. 133 (11): 855–863. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:11(855).
Somboonpisan, J., and C. Limsawasd. 2021. “Environmental weight for bid evaluation to promote sustainability in highway construction projects.” J. Constr. Eng. Manage. 147 (4): 04021013. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002005.
Soo, A., and B. L. Oo. 2014. “The effect of construction demand on contract auctions: An experiment.” Eng. Constr. Archit. Manage. 21 (3): 276–290. https://doi.org/10.1108/ECAM-01-2013-0010.
Statista. 2019. Construction industry spending worldwide from 2014 to 2019, with forecasts from 2020 to 2035.” Accessed October 27, 2021. https://www.statista.com/statistics/788128/construction-spending-worldwide/.
Tinsley, H. E., and D. J. Weiss. 1975. “Interrater reliability and agreement of subjective judgments.” J. Couns. Psychol. 22 (4): 358. https://doi.org/10.1037/h0076640.
Tserng, H. P., and P. H. Lin. 2002. “An accelerated subcontracting and procuring model for construction projects.” Autom. Constr. 11 (1): 105–125. https://doi.org/10.1016/S0926-5805(01)00056-5.
US Census Bureau. 2020. “Construction spending: Historical value put in place.” Accessed October 28, 2021. https://www.census.gov/construction/c30/historical_data.html.
US General Services Administration. 2016. “Bidding on federal construction projects.” Accessed October 28, 2021. https://www.gsa.gov/real-estate/real-estate-services/for-businesses-seeking-opportunities/bidding-on-federal-construction-projects.
Wang, W. C., H. H. Wang, Y. T. Lai, and J. C. C. Li. 2006. “Unit-price-based model for evaluating competitive bids.” Int. J. Project Manage. 24 (2): 156–166. https://doi.org/10.1016/j.ijproman.2005.06.002.
Wang, Y., J. E. Taylor, and M. J. Garvin. 2020. “Measuring resilience of human–spatial systems to disasters: Framework combining spatial-network analysis and fisher information.” J. Manage. Eng. 36 (4): 04020019. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000782.
Wanous, M., A. H. Boussabaine, and J. Lewis. 1998. “Tendering factors considered by Syrian contractors.” In Vol. 2 of Proc., 14th annual ARCOM Conf., 535. London: Association of Researchers in Construction Management.
Wanous, M., A. H. Boussabaine, and J. Lewis. 2000. “To bid or not to bid: A parametric solution.” Construct. Manage. Econ. 18 (4): 457–466. https://doi.org/10.1080/01446190050024879.
Wanous, M., H. Boussabaine, and J. Lewis. 2003. “A neural network bid/no bid model: The case for contractors in Syria.” Construct. Manage. Econ. 21 (7): 737–744. https://doi.org/10.1080/0144619032000093323.
Waskom, M., et al. 2018. “mwaskom/seaborn: v0.9.0. Zenodo.” Accessed October 12, 2021. https://zenodo.org/record/1313201.
Wong, J., and E. Hui. 2006. “Construction project risks: Further considerations for constructors’ pricing in Hong Kong.” Construct. Manage. Econ. 24 (4): 425–438. https://doi.org/10.1080/01446190600601602.
Wu, M.-L., and H.-P. Lo. 2009. “Optimal strategy modeling for price-time biparameter construction bidding.” J. Constr. Eng. Manage. 135 (4): 298–306. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:4(298).
Xie, S., X. Ji, W. Yang, and C. Hu. 2020. “Analysis of traffic accident characteristic and difference in two-lane plateau mountain highways.” In Proc., COTA Int. Conf. of Transportation Professionals 2020, 4408–4419. Reston, VA: ASCE.
Yang, Y., M. Wu, and L. Cui. 2012. “Integration of three visualization methods based on co-word analysis.” Scientometrics 90 (2): 659–673. https://doi.org/10.1007/s11192-011-0541-4.
Ye, K., L. Shen, B. Xia, and B. Li. 2014. “Key attributes underpinning different markup decision between public and private projects: A China study.” Int. J. Project Manage. 32 (3): 461–472. https://doi.org/10.1016/j.ijproman.2013.06.001.
Yuan, X. X. 2011. “A correlated bidding model for markup size decisions.” Construct. Manage. Econ. 29 (11): 1101–1119. https://doi.org/10.1080/01446193.2011.637568.
Zaqout, I. S., M. S. Islam, L. A. Hadidi, and M. Skitmore. 2022. “Modeling bidding decisions and bid markup size for construction projects: A fuzzy approach.” Eng. Appl. Artif. Intell. 113 (Aug): 104982. https://doi.org/10.1016/j.engappai.2022.104982.
Zhang, Y., B. L. Oo, and B. T. H. Lim. 2022. “Factors affecting contractors’ bid or no-bid and mark-up decisions: A case of the Jilin province, China.” Constr. Innovation 23 (5): 1232–1254. https://doi.org/10.1108/CI-10-2021-0188.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 150Issue 4April 2024

History

Received: May 30, 2023
Accepted: Nov 2, 2023
Published online: Jan 29, 2024
Published in print: Apr 1, 2024
Discussion open until: Jun 29, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Muaz O. Ahmed, M.ASCE [email protected]
Construction Engineer, Crawford, Murphy & Tilly, Inc., 550 N Commons Dr., Suite 116, Aurora, IL 60504; formerly, Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, Rolla, MO 65409. Email: [email protected]
Associate Dean for Academic Partnerships, Hurst-McCarthy Professor of Construction Engineering and Management, Professor of Civil Engineering, and Founding Director of the Missouri Consortium of Construction Innovation, Dept. of Civil, Architectural, and Environmental Engineering/Dept. of Engineering Management and Systems Engineering, Missouri Univ. of Science and Technology, 228 Butler-Carlton Hall, 1401 N. Pine St., Rolla, MO 65409 (corresponding author). ORCID: https://orcid.org/0000-0002-7306-6380. Email: [email protected]
Aubrie Caldwell, S.M.ASCE [email protected]
Undergraduate Student, Dept. of Civil, Architectural, and Environmental Engineering, Missouri Univ. of Science and Technology, 215 Butler-Carlton Hall, 1401 N. Pine St., Rolla, MO 65401. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share