How Dependence Asymmetry and Explicit Contract Shape Contractor–Subcontractor Collaboration: A Psychological Perspective of Fairness

Publication: Journal of Construction Engineering and Management
Volume 149, Issue 11

Abstract

The contractor–subcontractor relationship is evolving from a traditional structure to a collaborative and partnering arrangement, leading to subcontracting project success and relationship stability as dual goals. Subcontracting project success denotes a good performance assessed by cost, time, quality, and collaboration satisfaction, whereas relationship stability implies a tendency of long-term orientation toward the dyadic relationship. However, dependence asymmetry, which refers to the different dependence magnitude levels between general contractors and subcontractors, hinders such dual goals. This article collected 223 questionnaires from subcontractors to investigate how to reduce the negative effect of dependence asymmetry on subcontracting project success and relationship stability. Meanwhile, this article employed the fairness perception as the psychological mechanism to aggregate such negative effect and took an explicit contract as an efficient moderator to reduce it. Results confirm the context-sensitive nature of fairness perception, showing that distributive fairness perception and procedural fairness perception mediated the relationship between dependence asymmetry and two dependent variables (subcontracting project success and relationship stability), whereas the effect of interactional fairness perception was not significant. Moreover, an explicit contract weakens the negative impact of dependence asymmetry on distributive fairness perception and procedural fairness perception, while it does not regulate the impact of dependence asymmetry on interactional fairness perception. Theoretically, this article clarifies the necessity of emphasizing long-term relationship development between general contractors and subcontractors in construction. Furthermore, this article extends dependence asymmetry research in contractor–subcontractor collaboration by adding both the psychological lens of fairness perception and a restraining moderator of explicit contract. Practically, the findings help project managers to identify dual means of explicit contract and psychological perception to balance the degree of dependence asymmetry and prompt collaborative performance.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

The authors are grateful for the support of the National Natural Science Foundation of China (Project No. 72101179), and Humanities and Social Sciences Foundation by the Ministry of Education of China (Project No. 20YJAZH105).

References

Albert, M., P. Balve, and K. Spang. 2017. “Evaluation of project success: A structured literature review.” Int. J. Managing Projects Bus. 10 (4): 796–821. https://doi.org/10.1108/IJMPB-01-2017-0004.
Argyres, N., and K. J. Mayer. 2007. “Contract design as a firm capability: An integration of learning and transaction cost perspectives.” Acad. Manage. Rev. 32 (4): 1060–1077. https://doi.org/10.5465/amr.2007.26585739.
Bochner, S., and B. Hesketh. 2016. “Power distance, individualism/collectivism, and job-related attitudes in a culturally diverse work group.” J. Cross-Cultural Psychol. 25 (2): 233–257. https://doi.org/10.1177/0022022194252005.
Boone, R. T., and M. W. Macy. 1999. “Unlocking the doors of the prisoner’s dilemma: Dependence, selectivity, and cooperation.” Social Psychol. Q. 62 (1): 32–52. https://doi.org/10.2307/2695824.
Brinkhoff, A., O. Ozer, and G. Sargut. 2015. “All you need is trust? An examination of inter-organizational supply chain projects.” Prod. Oper. Manage. 24 (2): 181–200. https://doi.org/10.1111/poms.12234.
Brito, R. P., and P. L. S. Miguel. 2017. “Power, governance, and value in collaboration: Differences between buyer and supplier perspectives.” J. Supply. Chain. Manag. 53 (2): 61–87. https://doi.org/10.1111/jscm.12134.
Buchanan, L. 1992. “Vertical trade relationships: The role of dependence and symmetry in attaining organizational goals.” J. Mark. Res. 29 (1): 65–75. https://doi.org/10.1177/002224379202900106.
Celly, K. S., R. E. Spekman, and J. W. Kamauff. 1999. “Technological uncertainty, buyer preferences and supplier assurances: An examination of Pacific Rim purchasing arrangements.” J. Int. Bus. Stud. 30 (Jun): 297–316. https://doi.org/10.1057/palgrave.jibs.8490071.
Chen, H., J. E. Zemanek, E. Mai, and Y. Tian. 2015. “Relationship flexibility in a 3PL context: Impacts of network embeddedness, Guanxi, and explicit contract.” J. Mark. Channels 22 (4): 253–264. https://doi.org/10.1080/1046669X.2015.1113490.
Cho, B., S. Y. Ryoo, and K. K. Kim. 2017. “Interorganizational dependence, information transparency in interorganizational information systems, and supply chain performance.” Eur. J. Inf. Syst. 26 (2): 185–205. https://doi.org/10.1057/s41303-017-0038-1.
Colquitt, J. A., and C. L. Jackson. 2006. “Justice in teams: The context sensitivity of justice rules across individual and team contexts.” J. Appl. Soc. Psychol. 36 (4): 868–899. https://doi.org/10.1111/j.0021-9029.2006.00047.x.
Colquitt, J. A., J. A. Lepine, R. F. Piccolo, C. P. Zapata, and B. L. Rich. 2012. “Explaining the justice–performance relationship: Trust as exchange deepener or trust as uncertainty reducer?” J. Appl. Psychol. 97 (1): 1–15. https://doi.org/10.1037/a0025208.
Cropanzano, R., D. E. Rupp, and Z. S. Byrne. 2003. “The relationship of emotional exhaustion to work attitudes, job performance, and organizational citizenship behaviors.” J. Appl. Psychol. 88 (1): 160–169. https://doi.org/10.1037/0021-9010.88.1.160.
Deep, S., T. Gajendran, and M. Jefferies. 2020. “Factors influencing power and dependence for collaboration among construction project participants.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (2): 06520001. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000362.
El-Khalek, H. A., R. F. Aziz, and E. S. Morgan. 2019. “Identification of construction subcontractor prequalification evaluation criteria and their impact on project success.” Alexandria Eng. J. 58 (1): 217–223. https://doi.org/10.1016/j.aej.2018.11.010.
Emerson, R. M. 1962. “Power-dependence relations.” Am. Sociological Rev. 27 (1): 31–41. https://doi.org/10.2307/2089716.
Etikan, I., S. A. Musa, and R. S. Alkassim. 2016. “Comparison of convenience sampling and purposive sampling.” Am. J. Theor. Appl. Stat. 5 (1): 1–4. https://doi.org/10.11648/j.ajtas.20160501.11.
Flynn, B. B., S. Sakakibara, R. G. Schroeder, K. A. Bates, and E. J. Flynn. 1990. “Empirical research methods in operations management.” J. Oper. Manage. 9 (2): 250–284. https://doi.org/10.1016/0272-6963(90)90098-X.
Fornell, C., and D. F. Larcker. 1981. “Evaluating structural equation models with unobservable variables and measurement error.” J. Mark. Res. 18 (1): 39–50. https://doi.org/10.1177/002224378101800104.
Green, S. D., and N. Sergeeva. 2019. “Value creation in projects: Towards a narrative perspective.” Int. J. Project Manage. 37 (5): 636–651. https://doi.org/10.1016/j.ijproman.2018.12.004.
Guo, W., W. Lu, L. Hao, and X. Gao. 2023. “Interdependence and information exchange between conflicting parties: The role of interorganizational trust.” IEEE Trans. Eng. Manage. 70 (1): 156–172. https://doi.org/10.1109/TEM.2020.3047499.
Gurgun, A. P., and K. Koc. 2022. “The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach.” Eng. Constr. Archit. Manage. https://doi.org/10.1108/ecam-11-2021-1020.
Hart, O., and J. Moore. 2008. “Contracts as reference points.” Q. J. Econ. 123 (1): 1–48. https://doi.org/10.1162/qjec.2008.123.1.1.
Hu, L.-T., and P. M. Bentler. 1999. “Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives.” Struct. Equation Modell. Multidiscip. J. 6 (1): 1–55. https://doi.org/10.1080/10705519909540118.
Humphreys, P., J. Matthews, and M. Kumaraswamy. 2003. “Pre-construction project partnering: From adversarial to collaborative relationships.” Supply Chain Manage. 8 (2): 166–178. https://doi.org/10.1108/13598540310468760.
Huo, B., M. Tian, Y. Tian, and Q. Zhang. 2019. “The dilemma of inter-organizational relationships: Dependence, use of power and their impacts on opportunism.” Int. J. Oper. Prod. Manage. 39 (1): 2–23. https://doi.org/10.1108/IJOPM-07-2017-0383.
Huo, B., Z. Wang, and Y. Tian. 2016. “The impact of justice on collaborative and opportunistic behaviors in supply chain relationships.” Int. J. Prod. Econ. 177 (1): 12–23. https://doi.org/10.1016/j.ijpe.2016.04.006.
Ika, L. A. 2015. “Opening the black box of project management: Does World Bank project supervision influence project impact?” Int. J. Project Manage. 33 (5): 1111–1123. https://doi.org/10.1016/j.ijproman.2015.01.005.
Jap, S. D., and S. Ganesan. 2000. “Control mechanisms and the relationship life cycle: Implications for safeguarding specific investments and developing commitment.” J. Mark. Res. 37 (2): 227–245. https://doi.org/10.1509/jmkr.37.2.227.18735.
Jelodar, M. B., T. W. Yiu, and S. Wilkinson. 2016. “A conceptualisation of relationship quality in construction procurement.” Int. J. Project Manage. 34 (6): 997–1011. https://doi.org/10.1016/j.ijproman.2016.03.005.
Kashyap, V., and B. R. Murtha. 2018. “The joint effects of ex ante contractual completeness and ex post governance on compliance in franchised marketing channels.” J. Mark. 81 (3): 130–153. https://doi.org/10.1509/jm.14.0089.
Ke, H., Z. Cui, K. Govindan, and E. K. Zavadskas. 2015. “The impact of contractual governance and trust on EPC projects in construction supply chain performance.” Eng. Econ. 26 (4): 349–363. https://doi.org/10.5755/j01.ee.26.4.9843.
Kim, D.-Y., and B. Fortado. 2021. “Outcomes of supply chain dependence asymmetry: A systematic review of the statistical evidence.” Int. J. Prod. Res. 59 (19): 5844–5866. https://doi.org/10.1080/00207543.2020.1791999.
Kim, K. 2000. “On interfirm power, channel climate, and solidarity in industrial distributor-supplier dyads.” J. Acad. Mark. Sci. 28 (3): 388–405. https://doi.org/10.1177/0092070300283007.
Kumar, N., L. K. Scheer, and J.-B. E. M. Steenkamp. 1995a. “The effects of perceived interdependence on dealer attitudes.” J. Mark. Res. 32 (3): 348–356. https://doi.org/10.1177/002224379503200309.
Kumar, N., L. K. Scheer, and J.-B. E. M. Steenkamp. 1995b. “The effects of supplier fairness on vulnerable resellers.” J. Mark. Res. 32 (1): 54–65. https://doi.org/10.1177/002224379503200107.
Lee, C.-Y., H.-Y. Chong, Q. Li, and X. Wang. 2020. “Joint contract–function effects on BIM-enabled EPC project performance.” J. Constr. Eng. Manage. 146 (3): 04020008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001766.
Lee, J. K., S. H. Han, W. Jang, and W. Jung. 2018. “‘Win-win strategy’ for sustainable relationship between general contractors and subcontractors in international construction projects.” KSCE J. Civ. Eng. 22 (2): 428–439. https://doi.org/10.1007/s12205-017-1613-7.
LePine, J. A., A. Erez, and D. E. Johnson. 2002. “The nature and dimensionality of organizational citizenship behavior: A critical review and meta-analysis.” J. Appl. Psychol. 87 (1): 52–65. https://doi.org/10.1037/0021-9010.87.1.52.
Lim, B. T. H., and M. Loosemore. 2017. “The effect of inter-organizational justice perceptions on organizational citizenship behaviors in construction projects.” Int. J. Project Manage. 35 (2): 95–106. https://doi.org/10.1016/j.ijproman.2016.10.016.
Liu, J., P. Yang, B. Xia, and M. Skitmore. 2017. “Effect of perceived justice on subcontractor willingness to cooperate: The mediating role of relationship value.” J. Constr. Eng. Manage. 143 (9): 04017062. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001350.
Liu, Y., Y. Huang, Y. Luo, and Y. Zhao. 2012. “How does justice matter in achieving buyer–supplier relationship performance?” J. Oper. Manage. 30 (5): 355–367. https://doi.org/10.1016/j.jom.2012.03.003.
Liu, Y., L. Yuan, L. Tao, and Y. Wang. 2008. “Relationship stability, trust and relational risk in marketing channels: Evidence from China.” Ind. Mark. Manage. 37 (4): 432–446. https://doi.org/10.1016/j.indmarman.2007.04.001.
Loosemore, M., and B. T.-H. Lim. 2016. “Intra-organisational injustice in the construction industry.” Eng. Constr. Archit. Manage. 23 (4): 428–447. https://doi.org/10.1108/ECAM-01-2015-0005.
Love, P. E. D., P. R. Davis, R. Chevis, and D. J. Edwards. 2011. “Risk/reward compensation model for civil engineering infrastructure alliance projects.” J. Constr. Eng. Manage. 137 (2): 127–136. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000263.
Lu, S., and G. Hao. 2013. “The influence of owner power in fostering contractor cooperation: Evidence from China.” Int. J. Project Manage. 31 (4): 522–531. https://doi.org/10.1016/j.ijproman.2012.10.008.
Lu, W., W. Guo, and Q. Zhu. 2020a. “Effect of justice on contractor’s relational behavior: Moderating role of owner’s asset specificity.” J. Constr. Eng. Manage. 146 (4): 04020020. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001795.
Lu, W., Z. Li, and S. Wang. 2017. “The role of justice for cooperation and contract’s moderating effect in construction dispute negotiation.” Eng. Constr. Archit. Manage. 24 (1): 133–153. https://doi.org/10.1108/ECAM-01-2015-0002.
Lu, W., Y. Wei, and R. Wang. 2020b. “Handling inter-organisational conflict based on bargaining power: Organisational power distance orientation matters.” Int. J. Conflict Manage. 31 (5): 781–800. https://doi.org/10.1108/IJCMA-06-2019-0092.
Luo, Y. 2007. “The independent and interactive roles of procedural, distributive, and interactional justice in strategic alliances.” Acad. Manage. J. 50 (3): 644–664. https://doi.org/10.5465/amj.2007.25526452.
Luo, Y., Y. Liu, Q. Yang, V. Maksimov, and J. Hou. 2015. “Improving performance and reducing cost in buyer–supplier relationships: The role of justice in curtailing opportunism.” J. Bus. Res. 68 (3): 607–615. https://doi.org/10.1016/j.jbusres.2014.08.011.
Lusch, R. F., and J. R. Brown. 1996. “Interdependency, contracting, and relational behavior in marketing channels.” J. Mark. 60 (4): 19–38. https://doi.org/10.1177/002224299606000404.
Ma, S., A. R. Hofer, and J. Aloysius. 2021. “Supplier dependence asymmetry and investment in innovation: The role of psychological uncertainty.” J. Purchasing Supply Manage. 27 (2): 100674. https://doi.org/10.1016/j.pursup.2021.100674.
Manu, P., N. Ankrah, D. Proverbs, and S. Suresh. 2013. “Mitigating the health and safety influence of subcontracting in construction: The approach of main contractors.” Int. J. Project Manage. 31 (7): 1017–1026. https://doi.org/10.1016/j.ijproman.2012.11.011.
Martin, L., and L. Benson. 2021. “Relationship quality in construction projects: A subcontractor perspective of principal contractor relationships.” Int. J. Project Manage. 39 (6): 633–645. https://doi.org/10.1016/j.ijproman.2021.05.002.
Meng, X. 2010. “Assessment framework for construction supply chain relationships: Development and evaluation.” Int. J. Project Manage. 28 (7): 695–707. https://doi.org/10.1016/j.ijproman.2009.12.006.
Meng, X., M. Sun, and M. Jones. 2011. “Maturity model for supply chain relationships in construction.” J. Manage. Eng. 27 (2): 97–105. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000035.
Michalski, M., J. L. Montes-Botella, and W. Guevara Piedra. 2017. “Can asymmetry impact performance, collaboration and integration? An empirical study.” Int. J. Logist. Manage. 28 (4): 939–963. https://doi.org/10.1108/IJLM-03-2016-0084.
Mikami, K., J. J. Ikegami, and A. Bird. 2022. “Opportunism and trust in cross-national lateral collaboration: The Renault-Nissan Alliance and a theory of equity-trust.” J. World Bus. 57 (3): 101286. https://doi.org/10.1016/j.jwb.2021.101286.
Namkung, Y., and S. Jang. 2009. “The effects of interactional fairness on satisfaction and behavioral intentions: Mature versus non-mature customers.” Int. J. Hospitality Manage. 28 (3): 397–405. https://doi.org/10.1016/j.ijhm.2008.11.001.
Narasimhan, R., S. Narayanan, and R. Srinivasan. 2013. “An investigation of justice in supply chain relationships and their performance impact.” J. Oper. Manage. 31 (5): 236–247. https://doi.org/10.1016/j.jom.2013.05.001.
Oyegoke, A. S., M. Dickinson, M. M. A. Khalfan, P. McDermott, and S. Rowlinson. 2009. “Construction project procurement routes: An in-depth critique.” Int. J. Manage. Project Bus. 2 (3): 338–354. https://doi.org/10.1108/17538370910971018.
Pal, R., P. Wang, and X. Liang. 2017. “The critical factors in managing relationships in international engineering, procurement, and construction (IEPC) projects of Chinese organizations.” Int. J. Project Manage. 35 (7): 1225–1237. https://doi.org/10.1016/j.ijproman.2017.05.010.
Pfeffer, J., and G. R. Salancik. 1978. The external control of organizations: A resource dependence perspective. New York: Harper & Row.
Pinto, J. K., D. P. Slevin, and B. English. 2009. “Trust in projects: An empirical assessment of owner/contractor relationships.” Int. J. Project Manage. 27 (6): 638–648. https://doi.org/10.1016/j.ijproman.2008.09.010.
Pollack, J., J. Helm, and D. Adler. 2018. “What is the iron triangle, and how has it changed?” Int. J. Managing Project Bus. 11 (2): 527–547. https://doi.org/10.1108/IJMPB-09-2017-0107.
Qiu, T. 2018. “Dependence concentration and fairness perceptions in asymmetric supplier-buyer relationships.” J. Mark. Manage. 34 (3–4): 395–419. https://doi.org/10.1080/0267257X.2018.1450281.
Scott, A., C. W. Craighead, and C. Parker. 2020. “Now you see it, now you don’t: Explicit contract benefits in extralegal exchanges.” Prod. Oper. Manage. 29 (6): 1467–1486. https://doi.org/10.1111/poms.13173.
Shafi, M. Q., R. Iqbal, K. Shahzad, and C. Unterhitzenberger. 2021. “The mediating role of project citizenship behavior in the relationship between organizational justice dimensions and project success.” Project Manage. J. 52 (6): 547–562. https://doi.org/10.1177/87569728211026423.
Sharifirad, M. S. 2011. “The dimensions of learning organization questionnaire (DLOQ): A cross-cultural validation in an Iranian context.” Int. J. Manpower 32 (5–6): 661–676. https://doi.org/10.1108/01437721111158251.
Shen, L., Y. Wang, and W. Teng. 2017. “The moderating effect of interdependence on contracts in achieving equity versus efficiency in interfirm relationships.” J. Bus. Res. 78 (Sep): 277–284. https://doi.org/10.1016/j.jbusres.2016.12.023.
Song, H., F. Zhu, O. J. Klakegg, and P. Wang. 2018. “Relationship between contractual flexibility and contractor’s cooperative behavior: The mediating effect of justice perception.” Int. J. Managing Project Bus. 11 (2): 382–405. https://doi.org/10.1108/IJMPB-07-2017-0088.
Swalhi, A., S. Zgoulli, and M. Hofaidhllaoui. 2017. “The influence of organizational justice on job performance.” J. Manag. Dev. 36 (4): 542–559.
Tan, Y., B. Xue, and Y. T. Cheung. 2017. “Relationships between main contractors and subcontractors and their impacts on main contractor competitiveness: An empirical study in Hong Kong.” J. Constr. Eng. Manage. 143 (7): 05017007. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001311.
Tang, Y., Y. Chen, D. Arditi, and F. Meng. 2022. “Effects of the general contractor’s governance capabilities and project goals on the organizational arrangement of subcontracting.” IEEE Trans. Eng. Manage. 70 (5): 1724–1737. https://doi.org/10.1109/tem.2021.3064020.
Unterhitzenberger, C., and D. J. Bryde. 2019. “Organizational justice, project performance, and the mediating effects of key success factors.” Project Manage. J. 50 (1): 57–70. https://doi.org/10.1177/8756972818808984.
Williams, P., N. J. Ashill, E. Naumann, and E. Jackson. 2015. “Relationship quality and satisfaction: Customer-perceived success factors for on-time projects.” Int. J. Project Manage. 33 (8): 1836–1850. https://doi.org/10.1016/j.ijproman.2015.07.009.
Williamson, O. E. 2005. “The economics of governance.” Am. Econ. Rev. 95 (2): 1–18. https://doi.org/10.1257/000282805774669880.
Yang, N., Y. Song, Y. Zhang, and J. Wang. 2020. “Dark side of joint R&D collaborations: Dependence asymmetry and opportunism.” J. Bus. Ind. Mark. 35 (4): 741–755. https://doi.org/10.1108/JBIM-11-2018-0354.
Yeh, T.-M., F.-Y. Pai, and L.-C. Wu. 2020. “Relationship stability and supply chain performance for SMEs: From internal, supplier, and customer integration perspectives.” Mathematics 8 (11): 1902. https://doi.org/10.3390/math8111902.
Yeo, K. T., and J. H. Ning. 2002. “Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects.” Int. J. Project Manage. 20 (4): 253–262. https://doi.org/10.1016/S0263-7863(01)00021-7.
You, J., Y. Chen, W. Wang, and C. Shi. 2018. “Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts.” Int. J. Project Manage. 36 (5): 795–807. https://doi.org/10.1016/j.ijproman.2018.03.002.
Zeng, F., Q. Ye, M. C. Dong, Z. Huang, and Z. Liu. 2020. “Legitimizing actions in dependence-asymmetry relationships: A comparison between Chinese and Western firms.” Ind. Mark. Manage. 88 (3): 163–172. https://doi.org/10.1016/j.indmarman.2020.05.001.
Zerjav, V. 2021. “Why do business organizations participate in projects? Toward a typology of project value domains.” Project Manage. J. 52 (3): 287–297. https://doi.org/10.1177/87569728211001663.
Zhang, L., Y. Fu, and W. Lu. 2021. “Contract enforcement for claimants’ satisfaction with construction dispute resolution: Moderating role of shadow of the future, fairness perception, and trust.” J. Constr. Eng. Manage. 147 (2): 04020168. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001981.
Zhang, S., Y. Fu, and F. Kang. 2018. “How to foster contractors’ cooperative behavior in the Chinese construction industry: Direct and interaction effects of power and contract.” Int. J. Project Manage. 36 (7): 940–953. https://doi.org/10.1016/j.ijproman.2018.05.004.
Zhang, S., S. Zhang, Y. Gao, and X. Ding. 2016. “Contractual governance: Effects of risk allocation on contractors’ cooperative behavior in construction projects.” J. Constr. Eng. Manage. 142 (6): 04016005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001111.
Zhang, S. B., J. Chen, and Y. Fu. 2020. “Contract complexity and trust in construction project subcontracting.” Eng. Constr. Archit. Manage. 27 (9): 24772500. https://doi.org/10.1108/ecam-02-2019-0113.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 11November 2023

History

Received: Oct 10, 2022
Accepted: Jun 26, 2023
Published online: Aug 17, 2023
Published in print: Nov 1, 2023
Discussion open until: Jan 17, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Associate Professor, School of Management, Tianjin Univ. of Technology, Binshui West Rd., Xiqing District, Tianjin 300384, PR China. ORCID: https://orcid.org/0000-0001-9028-0664. Email: [email protected]
Postgraduate Student, School of Management, Tianjin Univ. of Technology, Binshui West Rd., Xiqing District, Tianjin 300384, PR China. Email: [email protected]
Tingting Cao, Ph.D. [email protected]
Lecturer, School of Management, Tianjin Univ. of Technology, Binshui West Rd., Xiqing District, Tianjin 300384, PR China (corresponding author). Email: [email protected]
Postgraduate Student, School of Management, Tianjin Univ. of Technology, Binshui West Rd., Xiqing District, Tianjin 300384, PR China. Email: [email protected]
Yaling Du, Ph.D. [email protected]
Professor, School of Management, Tianjin Univ. of Technology, Binshui West Rd., Xiqing District, Tianjin 300384, PR China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share