The Cost Drivers of Infrastructure Projects: Definition, Classification, and Conceptualization

Publication: Journal of Construction Engineering and Management
Volume 149, Issue 11

Abstract

Reducing cost is a critical objective for project teams. However, unlike the research on topics such as cost overruns, cost reduction literature is limited. Previous studies have primarily examined cost estimation and reduction models or high-level cost reduction strategies. Therefore, it is necessary to identify specific actions that project teams can take to reduce cost. By focusing on the “cost drivers” of infrastructure projects, researchers have a practically relevant lens through which cost reduction can be promoted and studied. Thus, this integrative literature review establishes a foundation for infrastructure project cost drivers knowledge, addressing three research questions revolving around deriving a definition, classification scheme, and conceptual framework of cost drivers. This paper first produces a definition of cost drivers by critically analyzing cost driver concepts and perspectives and existing definitions. Second, cost drivers were drawn from relevant articles and classified to produce a taxonomy of 14 key cost drivers. Third, a conceptual framework (two-by-two matrix) of cost driver types was developed to acknowledge the influence project teams can have. Finally, a research agenda proposes further investigation in cost drivers and reduction research regarding each cost driver, apt research methods, and necessary project contexts. This paper’s theoretical contribution is a deepening of infrastructure project cost drivers knowledge using a definition, taxonomy, and conceptual framework. The practical contribution is a deepened awareness of the key opportunities for—and threats to—cost reduction for project teams, as well as knowledge of those cost drivers that they actually have an influence over, that is, to reduce their project’s cost.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data, models, and code generated or used during the study appear in the published article.

Acknowledgments

The authors would like to thank the funder of this research, the National Nuclear Laboratory (NNL), for making it possible to conduct this research (Research Grant NNL/UA/115). In particular, the authors would like to thank Mr. Karl Sanderson from the Nuclear Decommissioning Authority (NDA) for his valuable feedback on earlier versions of this manuscript. The ideas and opinions in this paper represent only the point of view of the authors, and only the authors are responsible for any omission or mistake. This paper should not be taken to represent in any way the point of view of NNL, NDA, or any other organization either in the UK or abroad.

References

Abanda, F. H., B. Kamsu-Foguem, and J. H. M. Tah. 2017. “BIM—New rules of measurement ontology for construction cost estimation.” Eng. Sci. Technol. Int. J. 20 (2): 443–459. https://doi.org/10.1016/j.jestch.2017.01.007.
ACA (Australian Constructors Association). 2014. Major infrastructure projects: Costs and productivity issues. London: Deloitte.
ACE (Association for Consultancy and Engineering). 2010. “The cost drivers of infrastructure projects: Why project costs vary.” Accessed June 22, 2021. https://www.acenet.co.uk/media/1480/the-cost-drivers-of-infrastructure.pdf.
Adedipe, T., and M. Shafiee. 2021. “An economic assessment framework for decommissioning of offshore wind farms using a cost breakdown structure.” Int. J. Life Cycle Assess. 26 (2): 344–370. https://doi.org/10.1007/s11367-020-01793-x.
Aje, O. I., K. T. Odusami, and D. R. Ogunsemi. 2009. “The impact of contractors’ management capability on cost and time performance of construction projects in Nigeria.” J. Financ. Manage. Prop. Constr. 14 (2): 171–187. https://doi.org/10.1108/13664380910977619.
Akinci, B., and M. Fischer. 1998. “Factors affecting contractors’ risk of cost overburden.” J. Manage. Eng. 14 (1): 67–76. https://doi.org/10.1061/(ASCE)0742-597X(1998)14:1(67).
Alzoubi, Y., G. Locatelli, and T. Sainati. 2023. “Modern slavery in projects: A systematic literature review and research agenda.” Project Manage. J. 54 (3): 235–252. https://doi.org/10.1177/87569728221148158.
Ammeter, A. P., and J. M. Dukerich. 2002. “Leadership, team building, and team member characteristics in high performance project teams.” Eng. Manage. J. 14 (4): 3–10. https://doi.org/10.1080/10429247.2002.11415178.
Anand, G., and R. Kodali. 2008. “Benchmarking the benchmarking models.” Benchmarking 15 (3): 257–291. https://doi.org/10.1108/14635770810876593.
Annamalaisami, C. D., and A. Kuppuswamy. 2021. “Managing cost risks: Toward a taxonomy of cost overrun factors in building construction projects.” ASCE-ASME J. Risk Uncertainty Eng. Syst. Part A: Civ. Eng. 7 (2): 04021021. https://doi.org/10.1061/AJRUA6.0001132.
Australian Government. 2018. Cost estimation guidance note 3A—Supplementary guidance. Canberra, Australia: Australian Government.
Baumeister, R. F., and M. R. Leary. 1997. “Writing narrative literature reviews.” Rev. Gen. Psychol. 1 (3): 311–320. https://doi.org/10.1037/1089-2680.1.3.311.
Bayraktar, M. E., M. Hastak, S. Gokhale, and B. Safi. 2011. “Decision tool for selecting the optimal techniques for cost and schedule reduction in capital projects.” J. Constr. Eng. Manage. 137 (9): 645–655. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000345.
Bilge, E. Ç., and H. Yaman. 2022. “Research trends analysis using text mining in construction management: 2000–2020.” Eng. Constr. Archit. Manage. 29 (8): 3210–3233. https://doi.org/10.1108/ECAM-02-2021-0107.
Blomquist, T., M. Hällgren, A. Nilsson, and A. Söderholm. 2010. “Project-as-practice: In search of project management research that matters.” Project Manage. J. 41 (1): 5–16. https://doi.org/10.1002/pmj.20141.
Brady, T., and A. Davies. 2014. “Managing structural and dynamic complexity: A tale of two projects.” Project Manage. J. 45 (4): 21–38. https://doi.org/10.1002/pmj.21434.
Bryde, D., M. Broquetas, and J. M. Volm. 2013. “The project benefits of building information modelling (BIM)” Int. J. Project Manage. 31 (7): 971–980. https://doi.org/10.1016/j.ijproman.2012.12.001.
Burger, K., L. White, and M. Yearworth. 2019. “Understanding front-end project workshops with social practice theory.” Int. J. Project Manage. 37 (1): 161–175. https://doi.org/10.1016/j.ijproman.2018.11.003.
Callahan, J. L. 2010. “Constructing a manuscript: Distinguishing integrative literature reviews and conceptual and theory articles.” Hum. Resour. Dev. Rev. 9 (3): 300–304. https://doi.org/10.1177/1534484310371492.
Callahan, J. L. 2014. “Writing literature reviews: A reprise and update.” Hum. Resour. Dev. Rev. 13 (3): 271–275. https://doi.org/10.1177/1534484314536705.
Chasey, A. D., W. E. Maddex, and A. Bansal. 2012. “Comparison of public–private partnerships and traditional procurement methods in North American highway construction.” Transp. Res. Rec. 2268 (1): 26–32. https://doi.org/10.3141/2268-04.
Chen, Q., Z. Jin, B. Xia, P. Wu, and M. Skitmore. 2016. “Time and cost performance of design–build projects.” J. Constr. Eng. Manage. 142 (2): 04015074. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001056.
Cheng, Y.-M. 2014. “An exploration into cost-influencing factors on construction projects.” Int. J. Project Manage. 32 (5): 850–860. https://doi.org/10.1016/j.ijproman.2013.10.003.
Chritamara, S., S. O. Ogunlana, and N. Luong Bach. 2001. “Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling.” Eng. Constr. Archit. Manage. 8 (5–6): 381–392. https://doi.org/10.1108/eb021198.
Cicmil, S., T. Williams, J. Thomas, and D. Hodgson. 2006. “Rethinking project management: Researching the actuality of projects.” Int. J. Project Manage. 24 (8): 675–686. https://doi.org/10.1016/j.ijproman.2006.08.006.
CIDB (Construction Industry Development Board). 2017. “The drivers of the cost of public sector construction.” Accessed May 11, 2021. https://www.cidb.org.za/download/98/other-reports/6075/drivers-of-cost-of-construction-assessment-and-recommendations.pdf.
Çıdık, M. S., and V. Bowler. 2022. “Project value as practice: Interactive valuation practices in architectural design projects.” Int. J. Project Manage. 40 (4): 362–371. https://doi.org/10.1016/j.ijproman.2022.03.010.
Collier, P., M. Kirchberger, and M. Söderbom. 2016. “The cost of road infrastructure in low- and middle-income countries.” World Bank Econ. Rev. 30 (3): 522–548. https://doi.org/10.1093/wber/lhv037.
Davies, A., M. Dodgson, and D. Gann. 2016. “Dynamic capabilities in complex projects: The case of London Heathrow Terminal 5.” Project Manage. J. 47 (2): 26–46. https://doi.org/10.1002/pmj.21574.
Davies, A., D. Gann, and T. Douglas. 2009. “Innovation in megaprojects: Systems integration at London Heathrow Terminal 5.” Calif. Manage. Rev. 51 (2): 101–125. https://doi.org/10.2307/41166482.
Davies, A., and I. Mackenzie. 2014. “Project complexity and systems integration: Constructing the London 2012 Olympics and Paralympics games.” Int. J. Project Manage. 32 (5): 773–790. https://doi.org/10.1016/j.ijproman.2013.10.004.
De Marco, A., and T. Narbaev. 2021. “Factors of schedule and cost performance of tunnel construction megaprojects.” Open Civ. Eng. J. 15 (1): 38–49. https://doi.org/10.2174/1874149502115010038.
Denicol, J., A. Davies, and I. Krystallis. 2020. “What are the causes and cures of poor megaproject performance? A systematic literature review and research agenda.” Project Manage. J. 51 (3): 328–345. https://doi.org/10.1177/8756972819896113.
Derakhshanalavijeh, R., and J. M. C. Teixeira. 2017. “Cost overrun in construction projects in developing countries, gas–oil industry of Iran as a case study.” J. Civ. Eng. Manage. 23 (1): 125–136. https://doi.org/10.3846/13923730.2014.992467.
Dissanayaka, S. M., and M. M. Kumaraswamy. 1999. “Evaluation of factors affecting time and cost performance in Hong Kong building projects.” Eng. Constr. Archit. Manage. 6 (3): 287–298. https://doi.org/10.1108/eb021119.
Efron, N., and M. Read. 2012. “Analysing international tunnel costs: An interactive qualifying project.” Accessed May 11, 2021. https://web.wpi.edu/Pubs/E-project/Available/E-project-043012-122558/unrestricted/Analysing_International_Tunnelling_Costs_Public_Report.pdf.
Ekung, S., I. Odesola, and A. Lashinde. 2021. “Agenda for first costs reduction in sustainable buildings for emerging markets.” Int. J. Sustainable Build. Technol. Urban Dev. 12 (2): 126–141. https://doi.org/10.22712/susb.20210011.
Elmousalami, H. H. 2020. “Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review.” J. Constr. Eng. Manage. 146 (1): 03119008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001678.
Elsbach, K. D., and D. Knippenberg. 2020. “Creating high-impact literature reviews: An argument for ‘integrative reviews.’” J. Manage. Stud. 57 (6): 1277–1289. https://doi.org/10.1111/joms.12581.
Enshassi, A., J. Al-Najjar, and M. Kumaraswamy. 2009. “Delays and cost overruns in the construction projects in the Gaza Strip.” J. Financ. Manage. Prop. Constr. 14 (2): 126–151. https://doi.org/10.1108/13664380910977592.
Enshassi, A., and A. Ayyash. 2014. “Factors affecting cost contingency in the construction industry—Contractors’ perspective.” Int. J. Constr. Manage. 14 (3): 191–208. https://doi.org/10.1080/15623599.2014.922729.
ETI (Energy Technologies Institute). 2018. “The ETI nuclear cost drivers project: Summary report.” Accessed May 11, 2021. https://www.eti.co.uk/library/the-eti-nuclear-cost-drivers-project-summary-report.
Flyvbjerg, B. 2006. “From Nobel Prize to project management: Getting risks right.” Project Manage. J. 37 (3): 5–15. https://doi.org/10.1177/875697280603700302.
Flyvbjerg, B. 2014. “What you should know about megaprojects and why: An overview.” Project Manage. J. 45 (2): 6–19. https://doi.org/10.1002/pmj.21409.
Flyvbjerg, B., et al. 2018. “Five things you should know about cost overrun.” Transp. Res. Part A Policy Pract. 118 (Dec): 174–190. https://doi.org/10.1016/j.tra.2018.07.013.
Flyvbjerg, B., M. K. S. Holm, and S. L. Buhl. 2004. “What causes cost overrun in transport infrastructure projects?” Transp. Rev. 24 (1): 3–18. https://doi.org/10.1080/0144164032000080494a.
Flyvbjerg, B., M. S. Holm, and S. Buhl. 2002. “Underestimating costs in public works projects: Error or lie?” J. Am. Plann. Assoc. 68 (3): 279–295. https://doi.org/10.1080/01944360208976273.
Forbes. 2023. “Enabling sustainable urban districts with digitalization.” Accessed April 14, 2023. https://www.forbes.com/sites/siemens-smart-infrastructure/2023/02/17/enabling-sustainable-urban-districts-with-digitalization/?sh=33fec2c844b4.
GAO (Government Accountability Office). 2020. Cost estimating and assessment guide: Best practices for developing and managing program costs. Washington, DC: GAO.
Gharaibeh, H. M. 2014. “Cost control in mega projects using the Delphi method.” J. Manage. Eng. 30 (5): 1–7. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000218.
Gil, N. 2009. “Developing cooperative project client-supplier relationships: How much to expect from relational contracts?” Calif. Manage. Rev. 51 (2): 144–169. https://doi.org/10.2307/41166484.
Gil, N., and S. Beckman. 2009. “Introduction: Infrastructure meets business: Building new bridges, mending old ones.” Calif. Manage. Rev. 51 (2): 6–29. https://doi.org/10.2307/41166478.
Gil, N. A., and Y. Fu. 2022. “Megaproject performance, value creation and value distribution: An organizational governance perspective.” Acad. Manage. Discov. 8 (2): 224–251. https://doi.org/10.5465/amd.2020.0029.
Goh, K. C., and J. Yang. 2014. “Importance of sustainability-related cost components in highway infrastructure: Perspective of stakeholders in Australia.” J. Infrastruct. Syst. 20 (1): 04013002. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000152.
Grant, K. P., W. M. Cashman, and D. S. Christensen. 2006. “Delivering projects on time.” Res. Manage. 49 (6): 52–58. https://doi.org/10.1080/08956308.2006.11657408.
Hällgren, M., and A. Söderholm. 2010. “Orchestrating deviations in global projects: Projects-as-practice observations.” Scand. J. Manage. 26 (4): 352–367. https://doi.org/10.1016/j.scaman.2010.09.002.
Hällgren, M., and A. Söderholm. 2012. Projects-as-practice: New approach, new insights. Oxford, UK: Oxford University Press.
Han, S. H., S. Yun, H. Kim, Y. H. Kwak, H. K. Park, and S. H. Lee. 2009. “Analyzing schedule delay of mega project: Lessons learned from Korea Train Express.” IEEE Trans. Eng. Manage. 56 (2): 243–256. https://doi.org/10.1109/TEM.2009.2016042.
Heptonstall, P., R. Gross, P. Greenacre, and T. Cockerill. 2012. “The cost of offshore wind: Understanding the past and projecting the future.” Energy Policy 41 (Feb): 815–821. https://doi.org/10.1016/j.enpol.2011.11.050.
HM Treasury. 2014. Infrastructure cost review: Measuring and improving delivery. London: HM Treasury.
HM Treasury and Infrastructure UK. 2010a. Infrastructure cost review: Main report. London: HM Treasury and Infrastructure UK.
HM Treasury and Infrastructure UK. 2010b. Infrastructure cost review: Technical report. London: HM Treasury and Infrastructure UK.
Hsieh, T., S. Lu, and C. Wu. 2004. “Statistical analysis of causes for change orders in metropolitan public works.” Int. J. Project Manage. 22 (8): 679–686. https://doi.org/10.1016/j.ijproman.2004.03.005.
Ika, L. A., P. E. D. Love, and J. K. Pinto. 2020. “Moving beyond the planning fallacy: The emergence of a new principle of project behavior.” IEEE Trans. Eng. Manage. 69 (6): 3310–3325. https://doi.org/10.1109/TEM.2020.3040526.
Ingersoll, E., K. Gogan, and G. Locatelli. 2020. “Managing drivers of cost in the construction of nuclear plants.” Bridge 50 (3): 32–37.
Invernizzi, D. C., G. Locatelli, N. Brookes, and A. Davis. 2020a. “Qualitative comparative analysis as a method for project studies: The case of energy infrastructure.” Renewable Sustainable Energy Rev. 133 (May): 110314. https://doi.org/10.1016/j.rser.2020.110314.
Invernizzi, D. C., G. Locatelli, and N. J. Brookes. 2017a. “How benchmarking can support the selection, planning and delivery of nuclear decommissioning projects.” Prog. Nucl. Energy 99 (Aug): 155–164. https://doi.org/10.1016/j.pnucene.2017.05.002.
Invernizzi, D. C., G. Locatelli, and N. J. Brookes. 2017b. “Managing social challenges in the nuclear decommissioning industry: A responsible approach towards better performance.” Int. J. Project Manage. 35 (7): 1350–1364. https://doi.org/10.1016/j.ijproman.2016.12.002.
Invernizzi, D. C., G. Locatelli, and N. J. Brookes. 2018. “A methodology based on benchmarking to learn across megaprojects.” Int. J. Manage. Project Bus. 11 (1): 104–121. https://doi.org/10.1108/IJMPB-05-2017-0054.
Invernizzi, D. C., G. Locatelli, and N. J. Brookes. 2019. “An exploration of the relationship between nuclear decommissioning projects characteristics and cost performance.” Prog. Nucl. Energy 110 (1): 129–141. https://doi.org/10.1016/j.pnucene.2018.09.011.
Invernizzi, D. C., G. Locatelli, and N. J. Brookes. 2020b. “Characterising nuclear decommissioning projects: An investigation of the project characteristics that affect the project performance.” Construct. Manage. Econ. 38 (10): 947–963. https://doi.org/10.1080/01446193.2020.1775859.
Johnson, R. M., and R. I. I. Babu. 2020. “Time and cost overruns in the UAE construction industry: A critical analysis.” Int. J. Constr. Manage. 20 (5): 402–411. https://doi.org/10.1080/15623599.2018.1484864.
Josephson, P.-E., B. Larsson, and H. Li. 2002. “Illustrative benchmarking rework and rework costs in Swedish construction industry.” J. Manage. Eng. 18 (2): 76–83. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:2(76).
Juarez Cornelio, J. R., T. Sainati, and G. Locatelli. 2021. “What does it take to kill a megaproject? The reverse escalation of commitment.” Int. J. Project Manage. 39 (7): 774–787. https://doi.org/10.1016/j.ijproman.2021.07.004.
Kaiser, M. J. 2017. “FERC pipeline decommissioning cost in the US Gulf of Mexico, 1995–2015.” Mar. Policy 82 (2017): 167–180. https://doi.org/10.1016/j.marpol.2017.05.006.
Kaming, P. F., P. O. Olomolaiye, G. D. Holt, and F. C. Harris. 1997. “Factors influencing construction time and cost overruns on high-rise projects in Indonesia.” Construct. Manage. Econ. 15 (1): 83–94. https://doi.org/10.1080/014461997373132.
Kardes, I., A. Ozturk, S. T. Cavusgil, and E. Cavusgil. 2013. “Managing global megaprojects: Complexity and risk management.” Int. Bus. Rev. 22 (6): 905–917. https://doi.org/10.1016/j.ibusrev.2013.01.003.
Karimi, H., T. R. B. Taylor, G. B. Dadi, P. M. Goodrum, and C. Srinivasan. 2018. “Impact of skilled labor availability on construction project cost performance.” J. Constr. Eng. Manage. 144 (7): 04018057. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001512.
Kim, J. J., J. A. Miller, and S. Kim. 2020. “Cost impacts of change orders due to unforeseen existing conditions in building renovation projects.” J. Constr. Eng. Manage. 146 (8): 04020094. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001888.
Koushki, P. A., K. Al-Rashid, and N. Kartam. 2005. “Delays and cost increases in the construction of private residential projects in Kuwait.” Construct. Manage. Econ. 23 (3): 285–294. https://doi.org/10.1080/0144619042000326710.
Kwok, E. C. S., P. M. Anderson, and S. H. S. Ng. 2010. “Value engineering for railway construction projects: Cost driver analysis.” Proc. Inst. Mech. Eng., Part F: J. Rail Rapid Transit 224 (1): 45–52. https://doi.org/10.1243/09544097JRRT291.
LaGuardia, T. S., and K. C. Murphy. 2012. “Financing and economics of nuclear facility decommissioning.” In Nuclear decommissioning, edited by M. Laraia. Cambridge, UK: Woodhead Publishing.
Larsen, J. K., G. Q. Shen, S. M. Lindhard, and T. D. Brunoe. 2016. “Factors affecting schedule delay, cost overrun, and quality level in public construction projects.” J. Manage. Eng. 32 (1): 04015032. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391.
Li, K., D. Wang, Z. Sheng, and M. A. Griffin. 2022. “A deep dive into worker psychological well-being in the construction industry: A systematic review and conceptual framework.” J. Manage. Eng. 38 (5): 04022051. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001074.
Ling, F. Y. Y., and P. Q. Tran. 2012. “Effects of interpersonal relations on public sector construction contracts in Vietnam.” Construct. Manage. Econ. 30 (May): 1087–1101. https://doi.org/10.1080/01446193.2012.729848.
Liu, Y., R.-D. Chang, J. Zuo, F. Xiong, and N. Dong. 2022. “What leads to the high capital cost of prefabricated construction in China: Perspectives of stakeholders.” Eng. Constr. Archit. Manage. 30 (2): 805–832. https://doi.org/10.1108/ECAM-06-2021-0538.
Locatelli, G. 2021. “Is your organization ready for managing ‘back-end’ projects?” IEEE Eng. Manage. Rev. 49 (3): 175–181. https://doi.org/10.1109/EMR.2021.3098064.
Locatelli, G., D. C. Invernizzi, and N. J. Brookes. 2017a. “Project characteristics and performance in Europe: An empirical analysis for large transport infrastructure projects.” Transp. Res. Part A Policy Pract. 98 (Apr): 108–122. https://doi.org/10.1016/j.tra.2017.01.024.
Locatelli, G., M. Mancini, and E. Romano. 2014. “Systems engineering to improve the governance in complex project environments.” Int. J. Project Manage. 32 (8): 1395–1410. https://doi.org/10.1016/j.ijproman.2013.10.007.
Locatelli, G., G. Mariani, T. Sainati, and M. Greco. 2017b. “Corruption in public projects and megaprojects: There is an elephant in the room!” Int. J. Project Manage. 35 (3): 252–268. https://doi.org/10.1016/j.ijproman.2016.09.010.
Loch, C. H., A. De Meyer, and M. T. Pich. 2006. Managing the unknown: A new approach to managing high uncertainty and risk in projects. Hoboken, NJ: John Wiley & Sons, Inc.
Love, P. E. D. 2002. “Influence of project type and procurement method on rework costs in building construction projects.” J. Constr. Eng. Manage. 128 (1): 18–29. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(18).
Love, P. E. D., D. D. Ahiaga-Dagbui, and Z. Irani. 2016. “Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation.” Transp. Res. Part A Policy Pract. 92 (Oct): 184–194. https://doi.org/10.1016/j.tra.2016.08.007.
Love, P. E. D., D. J. Edwards, and Z. Irani. 2012. “Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns.” IEEE Trans. Eng. Manage. 59 (4): 560–571. https://doi.org/10.1109/TEM.2011.2163628.
Love, P. E. D., Z. Irani, J. Smith, M. Regan, and J. Liu. 2017. “Cost performance of public infrastructure projects: The nemesis and nirvana of change-orders.” Prod. Plann. Control 28 (13): 1081–1092. https://doi.org/10.1080/09537287.2017.1333647.
Love, P. E. D., and H. Li. 2000. “Quantifying the causes and costs of rework in construction.” Construct. Manage. Econ. 18 (4): 479–490. https://doi.org/10.1080/01446190050024897.
Love, P. E. D., and J. Matthews. 2022. “Error mastery in Alliance transport megaprojects.” IEEE Trans. Eng. Manage. (Apr): 1–18. https://doi.org/10.1109/TEM.2022.3151494.
Love, P. E. D., J. Matthews, and W. Fang. 2021. “Reflections on the risk and uncertainty of rework in construction.” J. Constr. Eng. Manage. 147 (4): 06021001. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002030.
Lowe, D. J., M. W. Emsley, and A. Harding. 2006. “Predicting construction cost using multiple regression techniques.” J. Constr. Eng. Manage. 132 (7): 750–758. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:7(750).
Mahamid, I. 2018. “Study of relationship between cost overrun and labour productivity in road construction projects.” Int. J. Prod. Qual. Manage. 24 (2): 143. https://doi.org/10.1504/IJPQM.2018.091791.
Mahmud, A. T., S. O. Ogunlana, and W. T. Hong. 2021. “Key driving factors of cost overrun in highway infrastructure projects in Nigeria: A context-based perspective.” J. Eng. Des. Technol. 19 (6): 1530–1555. https://doi.org/10.1108/JEDT-05-2020-0171.
Manley, K., and L. Chen. 2016. “The impact of client characteristics on the time and cost performance of collaborative infrastructure projects.” Eng. Constr. Archit. Manage. 23 (4): 511–532. https://doi.org/10.1108/ECAM-06-2015-0084.
Mansfield, N., O. Ugwu, and T. Doran. 1994. “Causes of delay and cost overruns in Nigerian construction projects.” Int. J. Project Manage. 12 (4): 254–260. https://doi.org/10.1016/0263-7863(94)90050-7.
Membah, J., and E. Asa. 2015. “Estimating cost for transportation tunnel projects: A systematic literature review.” Int. J. Constr. Manage. 15 (3): 196–218. https://doi.org/10.1080/15623599.2015.1067345.
Meng, X., and B. Gallagher. 2012. “The impact of incentive mechanisms on project performance.” Int. J. Project Manage. 30 (3): 352–362. https://doi.org/10.1016/j.ijproman.2011.08.006.
Merrow, E. W. 2011. Industrial megaprojects—Concepts, strategies, and practices for success. Hoboken, NJ: John Wiley & Sons, Inc.
Migliaccio, G. C., M. Guindani, M. D’Incognito, and L. Zhang. 2013. “Empirical assessment of spatial prediction methods for location cost-adjustment factors.” J. Constr. Eng. Manage. 139 (7): 858–869. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000654.
Mirza, E., and N. Ehsan. 2017. “Quantification of project execution complexity and its effect on performance of infrastructure development projects.” Eng. Manage. J. 29 (2): 108–123. https://doi.org/10.1080/10429247.2017.1309632.
Mitropoulos, P., and G. Howell. 2001. “Model for understanding, preventing, and resolving project disputes.” J. Constr. Eng. Manage. 127 (3): 223–231. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(223).
Morris, P. W. G. 2022. “A working account of the rise of project management.” Int. J. Project Manage. 40 (2): 91–94. https://doi.org/10.1016/j.ijproman.2022.01.005.
Mostafa, S., V. W. Tam, J. Dumrak, and S. Mohamed. 2020. “Leagile strategies for optimizing the delivery of prefabricated house building projects.” Int. J. Constr. Manage. 20 (8): 867–881. https://doi.org/10.1080/15623599.2018.1494674.
NDA (Nuclear Decommissioning Authority). 2020. Annual report & accounts 2019/20. Moor Row, UK: NDA.
NDA (Nuclear Decommissioning Authority). 2021. Annual report and accounts 2020/21. Moor Row, UK: NDA.
OECD/NEA. 2003. “Decommissioning nuclear power plants: Policies, strategies and costs.” Accessed March 8, 2021. https://www.oecd-nea.org/jcms/pl_13608.
OECD/NEA. 2016. Costs of decommissioning nuclear power plants. Paris: OECD.
Ofori-Boadu, A. N. 2015. “Exploring regression models for forecasting early cost estimates for high-rise buildings.” J. Technol. Manage. Appl. Eng. 31 (5): 1–24.
Okpala, D. C., and A. N. Aniekwu. 1988. “Causes of high costs of construction in Nigeria.” J. Constr. Eng. Manage. 114 (2): 233–244. https://doi.org/10.1061/(ASCE)0733-9364(1988)114:2(233).
Oladapo, A. A. 2007. “A quantitative assessment of the cost and time impact of variation orders on construction projects.” J. Eng. Des. Technol. 5 (1): 35–48. https://doi.org/10.1108/17260530710746597.
Olawale, Y., and M. Sun. 2015. “Construction project control in the UK: Current practice, existing problems and recommendations for future improvement.” Int. J. Project Manage. 33 (3): 623–637. https://doi.org/10.1016/j.ijproman.2014.10.003.
Olawale, Y. A., and M. Sun. 2010. “Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice.” Construct. Manage. Econ. 28 (5): 509–526. https://doi.org/10.1080/01446191003674519.
O’Leary, T., and T. Williams. 2013. “Managing the social trajectory: A practice perspective on project management.” IEEE Trans. Eng. Manage. 60 (3): 566–580. https://doi.org/10.1109/TEM.2012.2228206.
Orr, R. J., and R. E. Levitt. 2011. “Local embeddedness of firms and strategies for dealing with uncertainty in global projects.” In Global projects: Institutional and political challenges, edited by W. R. Scott, R. E. Levitt, and R. J. Orr, 183–246. Cambridge, UK: Cambridge University Press.
Padala, S. P. S., J. U. Maheswari, and H. Hirani. 2020. “Identification and classification of change causes and effects in construction projects.” Int. J. Constr. Manage. 22 (14): 2788–2807. https://doi.org/10.1080/15623599.2020.1827186.
Padalkar, M., and S. Gopinath. 2016. “Six decades of project management research: Thematic trends and future opportunities.” Int. J. Project Manage. 34 (7): 1305–1321. https://doi.org/10.1016/j.ijproman.2016.06.006.
Pellicer, E., G. I. Carvajal, M. C. Rubio, and J. Catalá. 2014. “A method to estimate occupational health and safety costs in construction projects.” KSCE J. Civ. Eng. 18 (7): 1955–1965. https://doi.org/10.1007/s12205-014-0591-2.
Post, C., R. Sarala, C. Gatrell, and J. E. Prescott. 2020. “Advancing theory with review articles.” J. Manage. Stud. 57 (2): 351–376. https://doi.org/10.1111/joms.12549.
Qian, X., and E. Papadonikolaki. 2021. “Shifting trust in construction supply chains through blockchain technology.” Eng. Constr. Archit. Manage. 28 (2): 584–602. https://doi.org/10.1108/ECAM-12-2019-0676.
Rahman, I. A., A. H. Memon, and A. T. A. Karim. 2013. “Relationship between factors of construction resources affecting project cost.” Mod. Appl. Sci. 7 (1): 67–75. https://doi.org/10.5539/mas.v7n1p67.
Raimi, D., A. J. Krupnick, J.-S. Shah, and A. Thompson. 2021. “Decommissioning orphaned and abandoned oil and gas wells: New estimates and cost drivers.” Environ. Sci. Technol. 55 (15): 10224–10230. https://doi.org/10.1021/acs.est.1c02234.
Raisbeck, P., C. Duffield, and M. Xu. 2010. “Comparative performance of PPPs and traditional procurement in Australia.” Construct. Manage. Econ. 28 (4): 345–359. https://doi.org/10.1080/01446190903582731.
Ramabodu, M. S., and J. J. P. Verster. 2013. “Factors that influence cost overruns in South African public sector mega-projects.” Int. J. Project Organ. Manage. 5 (1/2): 48–56. https://doi.org/10.1504/IJPOM.2013.053153.
Ramasesh, R. V., and T. R. Browning. 2014. “A conceptual framework for tackling knowable unknown unknowns in project management.” J. Oper. Manage. 32 (4): 190–204. https://doi.org/10.1016/j.jom.2014.03.003.
Reichelt, K., and J. Lyneis. 1999. “The dynamics of project performance: Benchmarking the drivers of cost and schedule overrun.” Eur. Manage. J. 17 (2): 135–150. https://doi.org/10.1016/S0263-2373(98)00073-5.
Remington, K., and J. Pollack. 2007. Tools for complex projects. Farnham, UK: Gower Publishing.
RICS (Royal Institution of Chartered Surveyors). 2015. Management of risk—RICS professional guidance, UK. London: RICS.
Rocco, S. T., and S. M. Plakhotnik. 2009. “Literature reviews, conceptual frameworks, and theoretical frameworks: Terms, functions, and distinctions.” Hum. Resour. Dev. Rev. 8 (1): 120–130. https://doi.org/10.1177/1534484309332617.
Sanchez-Cazorla, A., R. Alfalla-Luque, and A. I. Irimia-Dieguez. 2016. “Risk identification in megaprojects as a crucial phase of risk management: A literature review.” Project Manage. J. 47 (6): 75–93. https://doi.org/10.1177/875697281604700606.
Sandberg, J., and M. Alvesson. 2011. “Ways of constructing research questions: Gap-spotting or problematization?” Organization 18 (1): 23–44. https://doi.org/10.1177/1350508410372151.
Scott, W. R., R. E. Levitt, and R. J. Orr. 2011. Global projects: Institutional and political challenges. Cambridge, UK: Cambridge University Press.
Sepasgozar, S. M. E., A. M. Costin, R. Karimi, S. Shirowzhan, E. Abbasian, and J. Li. 2022. “BIM and digital tools for state-of-the-art construction cost management.” Buildings 12 (4): 396. https://doi.org/10.3390/buildings12040396.
Shane, J. S., K. R. Molenaar, S. Anderson, and C. Schexnayder. 2009. “Construction project cost escalation factors.” J. Manage. Eng. 25 (4): 221–229. https://doi.org/10.1061/(ASCE)0742-597X(2009)25:4(221).
Shenhar, A. J., and D. Dvir. 1996. “Toward a typological theory of project management.” Res. Policy 25 (4): 607–632. https://doi.org/10.1016/0048-7333(95)00877-2.
Sinesilassie, E. G., S. Z. S. Tabish, and K. N. Jha. 2018. “Critical factors affecting cost performance: A case of Ethiopian public construction projects.” Int. J. Constr. Manage. 18 (2): 108–119. https://doi.org/10.1080/15623599.2016.1277058.
Snyder, H. 2019. “Literature review as a research methodology: An overview and guidelines.” J. Bus. Res. 104 (Nov): 333–339. https://doi.org/10.1016/j.jbusres.2019.07.039.
Stoy, C., S. Pollalis, and H.-R. Schalcher. 2008. “Drivers for cost estimating in early design: Case study of residential construction.” J. Constr. Eng. Manage. 134 (1): 32–39. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(32).
Stoy, C., and H.-R. Schalcher. 2007. “Residential building projects: Building cost indicators and drivers.” J. Constr. Eng. Manage. 133 (2): 139–145. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:2(139).
Sunindijo, R. Y. 2015. “Project manager skills for improving project performance.” Int. J. Bus. Perform. Manage. 16 (1): 67. https://doi.org/10.1504/IJBPM.2015.066041.
Suprapto, M., H. L. M. Bakker, H. G. Mooi, and M. J. C. M. Hertogh. 2016. “How do contract types and incentives matter to project performance?” Int. J. Project Manage. 34 (6): 1071–1087. https://doi.org/10.1016/j.ijproman.2015.08.003.
Tong, B., J. Guo, and S. Fang. 2021. “Predicting budgetary estimate of highway construction projects in China based on GRA-LASSO.” J. Manage. Eng. 37 (3): 04021012. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000890.
Torp, O., and O. Klakegg. 2016. “Challenges in cost estimation under uncertainty—A case study of the decommissioning of Barsebäck nuclear power plant.” Administrative Sci. 6 (4): 14. https://doi.org/10.3390/admsci6040014.
Torraco, R. J. 2005. “Writing integrative literature reviews: Guidelines and examples.” Hum. Resour. Dev. Rev. 4 (3): 356–367. https://doi.org/10.1177/1534484305278283.
Torraco, R. J. 2016. “Writing integrative literature reviews.” Hum. Resour. Dev. Rev. 15 (4): 404–428. https://doi.org/10.1177/1534484316671606.
Turner, J. R. 2022. “Using principal–steward contracting and scenario planning to manage megaprojects.” Project Manage. J. 53 (1): 8–16. https://doi.org/10.1177/87569728211061836.
Turner, J. R., F. Anbari, and C. Bredillet. 2013. “Perspectives on research in project management: The nine schools.” Global Bus. Perspect. 1 (1): 3–28. https://doi.org/10.1007/s40196-012-0001-4.
van der Hoorn, B., and S. J. Whitty. 2019. “The five modes of comportment for project managing: Disclosing the tacit in project work.” Int. J. Project Manage. 37 (3): 363–377. https://doi.org/10.1016/j.ijproman.2019.01.009.
Venkataraman, R. R., and J. K. Pinto. 2008. Cost and value management in projects. Hoboken, NJ: John Wiley & Sons, Inc.
Venkateswaran, C. B., and R. Murugasan. 2017. “Time delay and cost overrun of road over bridge (ROB) construction projects in India.” J. Constr. Dev. Countries 22 (S1): 79–96. https://doi.org/10.21315/jcdc2017.22.supp1.5.
Vorster, M. C., and J. M. De La Garza. 1990. “Consequential equipment costs associated with lack of availability and downtime.” J. Constr. Eng. Manage. 116 (4): 656–669. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(656).
Wang, N., and M. Horner. 2007. “CSI model for estimating road maintenance projects.” Construct. Manage. Econ. 25 (12): 1269–1281. https://doi.org/10.1080/01446190701670373.
Whittemore, R., and K. Knafl. 2005. “The integrative review: Updated methodology.” J. Adv. Nurs. 52 (5): 546–553. https://doi.org/10.1111/j.1365-2648.2005.03621.x.
Wong, G., T. Greenhalgh, G. Westhorp, J. Buckingham, and R. Pawson. 2013. “RAMESES publication standards: Meta-narrative reviews.” J. Adv. Nurs. 69 (5): 987–1004. https://doi.org/10.1111/jan.12092.
Xiong, B., and B. Xia. 2014. “Examining the effects of early cost drivers on contingencies.” Constr. Res. Congr. 2014 (May): 1518–1527. https://doi.org/10.1061/9780784413517.155.
Yang, L. R., C. F. Huang, and K. S. Wu. 2011. “The association among project manager’s leadership style, teamwork and project success.” Int. J. Project Manage. 29 (3): 258–267. https://doi.org/10.1016/j.ijproman.2010.03.006.
Yap, J. B. H., H. Abdul-Rahman, and W. Chen. 2017. “Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication.” Int. J. Project Manage. 35 (7): 1253–1271. https://doi.org/10.1016/j.ijproman.2017.04.010.
Zhang, S., G. C. Migliaccio, P. A. Zandbergen, and M. Guindani. 2014. “Empirical assessment of geographically based surface interpolation methods for adjusting construction cost estimates by project location.” J. Constr. Eng. Manage. 140 (6): 04014015. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000850.
Zhao, L., J. Mbachu, and N. Domingo. 2017. “Exploratory factors influencing building development costs in New Zealand.” Buildings 7 (3): 57. https://doi.org/10.3390/buildings7030057.
Zhao, L., J. Mbachu, Z. Liu, X. Zhao, and B. Wang. 2021. “Investigating the causal relationships between project complexities and project cost: An empirical study from New Zealand.” Adv. Civ. Eng. 2021 (Aug): 1–17. https://doi.org/10.1155/2021/6624647.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 11November 2023

History

Published online: Aug 25, 2023
Published in print: Nov 1, 2023
Discussion open until: Jan 25, 2024

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Joseph Watton, S.M.ASCE [email protected]
Ph.D. Candidate, Project Management Group, School of Civil Engineering, Univ. of Leeds, Leeds LS2 9JT, UK (corresponding author). Email: [email protected]
Associate Professor, Project Management Group, School of Civil Engineering, Univ. of Leeds, Leeds LS2 9JT, UK. ORCID: https://orcid.org/0000-0001-5815-9127. Email: [email protected]
Giorgio Locatelli, Ph.D. [email protected]
Professor, School of Management, Politecnico Di Milano, Via Labruschini 4/B, Milano 20156, Italy. Email: [email protected]
Diletta Colette Invernizzi, Ph.D. [email protected]
Project Manager, Jacobs Engineering Group, 305 Bridgewater Place, Birchwood Park, Warrington, WA3 6XG, UK. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share