Technical Papers
Mar 28, 2023

Preconstruction Phase Management Practices Enhancing Labor Productivity in Multistory Building Projects

Publication: Journal of Construction Engineering and Management
Volume 149, Issue 6

Abstract

Implementation of appropriate management practices before commencing construction is vital to enhance construction productivity. This study aims to identify and prioritize preconstruction phase management practices (PCMPs) that can improve labor productivity in multistory building projects. Additionally, the objective of this research is to develop a stochastic model for predicting labor productivity based on the level of implementation of PCMPs. A thorough review of the literature was conducted to identify the practices that can increase construction productivity. Thereafter, questionnaires were distributed to principal contractors, and quantitative data were collected. After analyzing the data, the PCMPs were prioritized and a probability-based labor productivity prediction model was developed. The findings of the study revealed that well-defined scopes of work, short-interval plans, and buildability review are the top three PCMPs that can enhance labor productivity in multistory building projects. Correlation analysis showed that the relationship between labor productivity and PCMPs is statistically significant. The research showed that the relative importance of PCMPs varies based on project type. This study contributes to the body of knowledge by developing a novel tool to assess the levels of implementation of PCMPs and by building an innovative stochastic model for estimating labor productivity. Contractors can implement the practices identified in this research to augment the labor productivity of building projects, and use the model and a scoring tool to predict the labor productivity of multistory building projects.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code that support the findings of this study are available from the author upon reasonable request.

References

Alinaitwe, H. M., J. A. Mwakali, and B. Hansson. 2007. “Factors affecting the productivity of building craftsmen-studies of Uganda.” J. Civ. Eng. Manage. 13 (3): 169–176. https://doi.org/10.3846/13923730.2007.9636434.
Australian Construction Industry Forum. 2016. “Boosting construction productivity: Policy paper.” Accessed April 7, 2021. https://www.acif.com.au/documents/item/786.
Austroads. 2014. Building and construction procurement guide: Principles and options. Sydney, Australia: Austroads.
Borg, L. 2015. “Procurement contracts, innovation and productivity in the construction sector: Five studies.” Doctoral dissertation, Dept. of Real Estate and Construction Management, KTH Royal Institute of Technology.
Caldas, C. H., J.-Y. Kim, C. T. Haas, P. M. Goodrum, and D. Zhang. 2015. “Method to assess the level of implementation of productivity practices on industrial projects.” J. Constr. Eng. Manage. 141 (1): 04014061. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000919.
Carter, J. V., J. Pan, S. N. Rai, and S. Galandiuk. 2016. “ROC-ing along: Evaluation and interpretation of receiver operating characteristic curves.” Surgery 159 (6): 1638–1645. https://doi.org/10.1016/j.surg.2015.12.029.
Chahrour, R., M. A. Hafeez, A. M. Ahmad, H. I. Sulieman, H. Dawood, S. Rodriguez-Trejo, M. Kassem, K. K. Naji, and N. Dawood. 2021. “Cost-benefit analysis of BIM-enabled design clash detection and resolution.” Construct. Manage. Econ. 39 (1): 55–72. https://doi.org/10.1080/01446193.2020.1802768.
Chan, P. W., and A. Kaka. 2007. “Productivity improvements: Understand the workforce perceptions of productivity first.” Personnel Rev. 36 (4): 564–584. https://doi.org/10.1108/00483480710752803.
CII (Construction Industry Institute). 2013a. Best productivity practices implementation index for industrial projects: Implementation resource 252-3d. Austin, Texas: CII.
CII (Construction Industry Institute). 2013b. Best productivity practices implementation index for infrastructure projects: Implementation resource 252-3d. Austin, Texas: CII.
City of Melbourne. 2005. “Construction management plan: Guidelines.” Accessed November 18, 2022. http://www.melbourne.vic.gov.au/SiteCollectionDocuments/construction-management-guidelines.pdf.
COAA (Construction Owners Association of Alberta). 2007. “Construction work packages best practice.” Accessed November 23, 2022. https://studylib.net/doc/7392340/construction-work-packages—construction-owners-associat.
COAA (Construction Owners Association of Alberta). 2013. “WorkFace planning rules.” Accessed November 20, 2022. https://studylib.net/doc/7069226/wfp-tmp-2013-107-a-wfp-construction-scorecard.
Cohen, J. 2013. Statistical power analysis for the behavioral sciences. Amsterdam, Netherlands: Elsevier.
Dai, J., P. M. Goodrum, and W. F. Maloney. 2009. “Construction craft workers’ perceptions of the factors affecting their productivity.” J. Constr. Eng. Manage. 135 (3): 217–226. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(217).
Department of Treasury and Finance. 2015. “Construction supplier register.” Accessed September 30, 2015. http://www.dtf.vic.gov.au.
Dixit, S., A. K. Pandey, S. N. Mandal, and S. Bansal. 2017. “A study of enabling factors affecting construction productivity: Indian scenario.” Int. J. Civ. Eng. Technol. 8 (6): 741–758.
Doloi, H. 2013. “Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects.” J. Constr. Eng. Manage. 139 (3): 267–279. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000621.
Durdyev, S., and J. Mbachu. 2011. “On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures.” Constr. Econ. Build. 11 (3): 18–33. https://doi.org/10.5130/AJCEB.v11i3.2120.
El-Gohary, K. M., and R. F. Aziz. 2014. “Factors influencing construction labor productivity in Egypt.” J. Manage. Eng. 30 (1): 1–9. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000168.
Enshassi, A., S. Mohamed, and S. Abushaban. 2009. “Factors affecting the performance of construction projects in the Gaza strip.” J. Civ. Eng. Manage. 15 (3): 269–280. https://doi.org/10.3846/1392-3730.2009.15.269-280.
Enshassi, A., S. Mohamed, Z. A. Mustafa, and P. E. Mayer. 2007. “Factors affecting labour productivity in building projects in the Gaza Strip.” J. Civ. Eng. Manage. 13 (4): 245–254. https://doi.org/10.3846/13923730.2007.9636444.
Forcada, N., M. Macarulla, M. Gangolells, and M. Casals. 2016. “Handover defects: Comparison of construction and post-handover housing defects.” Build. Res. Inf. 44 (3): 279–288. https://doi.org/10.1080/09613218.2015.1039284.
Gansauer, P. 2022. “What is pre-construction and why is it the most important step in the construction process?” Accessed November 20, 2022. https://www.hollandcs.com/blog/what-is-pre-construction-and-why-is-it-important-to-a-construction-project.
Ghoddousi, P., and M. R. Hosseini. 2012. “A survey of the factors affecting the productivity of construction projects in Iran.” Technol. Econ. Dev. Econ. 18 (1): 99–116. https://doi.org/10.3846/20294913.2012.661203.
Ghodrati, N., T. Wing Yiu, S. Wilkinson, and M. Shahbazpour. 2018. “Role of management strategies in improving labor productivity in general construction projects in New Zealand: Managerial perspective.” J. Manage. Eng. 34 (6): 04018035. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000641.
Gurmu, A. T. 2021. “Hybrid model for assessing the influence of safety management practices on labor productivity in multistory building projects.” J. Constr. Eng. Manage. 147 (11): 04021139. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002169.
Gurmu, A. T., and A. A. Aibinu. 2017. “Construction equipment management practices for improving labor productivity in multistory building construction projects.” J. Constr. Eng. Manage. 143 (10): 04017081. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001384.
Gurmu, A. T., and A. A. Aibinu. 2018. “Survey of management practices enhancing labor productivity in multi-storey building construction projects.” Int. J. Prod. Perform. Manage. 67 (4): 717–735. https://doi.org/10.1108/IJPPM-02-2017-0032.
Hamzeh, F. R., I. Saab, I. D. Tommelein, and G. Ballard. 2015. “Understanding the role of ‘tasks anticipated’ in lookahead planning through simulation.” Autom. Constr. 49 (Jun): 18–26. https://doi.org/10.1016/j.autcon.2014.09.005.
Jamieson, S. 2004. “Likert scales: How to (ab) use them.” Med. Educ. 38 (12): 1217–1218. https://doi.org/10.1111/j.1365-2929.2004.02012.x.
Jarkas, A. M. 2016. “Effect of buildability on labor productivity: A practical quantification approach.” J. Constr. Eng. Manage. 142 (2): 06015002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001062.
Javed, A. A., W. Pan, L. Chen, and W. Zhan. 2018. “A systemic exploration of drivers for and constraints on construction productivity enhancement.” Built Environ. Project Asset Manage. 8 (3): 239–252. https://doi.org/10.1108/BEPAM-10-2017-0099.
Jergeas, G. 2009. Improving construction productivity on Alberta oil and gas capital projects. Calgary, AB, Canada: Univ. of Calgary.
Lam, P. T., F. K. Wong, and F. W. Wong. 2007. “Building features and site-specific factors affecting buildability in Hong Kong.” J. Eng. Des. Technol. 5 (2): 129–147. https://doi.org/10.1108/17260530710833185.
Lee, B., H. Choi, B. Min, J. Ryu, and D.-E. Lee. 2021. “Development of formwork automation design software for improving construction productivity.” Autom. Constr. 126 (Jun): 103680. https://doi.org/10.1016/j.autcon.2021.103680.
Lee, D., H. Lim, T. Kim, H. Cho, and K.-I. Kang. 2018. “Advanced planning model of formwork layout for productivity improvement in high-rise building construction.” Autom. Constr. 85 (Sep): 232–240. https://doi.org/10.1016/j.autcon.2017.09.019.
Liao, P.-C. 2008. “Influence factors of engineering productivity and their impact on project performance.” Doctoral dissertation, Dept. of Civil, Architectural and Environmental Engineering, Univ. of Texas.
Lim, E. C., and J. Alum. 1995. “Construction productivity: Issues encountered by contractors in Singapore.” Int. J. Project Manage. 13 (1): 51–58. https://doi.org/10.1016/0263-7863(95)95704-H.
Loosemore, M. 2014. “Improving construction productivity: A subcontractor’s perspective.” Eng. Constr. Archit. Manage. 21 (3): 245–260. https://doi.org/10.1108/ECAM-05-2013-0043.
Loosemore, M., S. Z. Alkilani, and S. Luperdi. 2022. “Productivity and industrial relations in the Australian construction industry.” Proc. Inst. Civ. Eng. Manage. Procure. Law 175 (4): 167–176. https://doi.org/10.1680/jmapl.20.00051.
Lozano, L. M., E. García-Cueto, and J. Muñiz. 2008. “Effect of the number of response categories on the reliability and validity of rating scales.” Methodology 4 (2): 73–79. https://doi.org/10.1027/1614-2241.4.2.73.
McKinsey Global Institute. 2017. “Reinventing construction: A route to higher productivity.” Accessed April 7, 2021. https://www.mckinsey.com/business-functions/operations/our-insights/reinventing-construction-through-a-productivity-revolution.
Moselhi, O., I. Assem, and K. El-Rayes. 2005. “Change orders impact on labor productivity.” J. Constr. Eng. Manage. 131 (3): 354–359. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:3(354).
Naoum, S. G. 2016. “Factors influencing labor productivity on construction sites: A state-of-the-art literature review and a survey.” Int. J. Prod. Perform. Manage. 65 (3): 401–421. https://doi.org/10.1108/IJPPM-03-2015-0045.
Nasir, H. 2013. “Best productivity practices implementation index (BPPII) for infrastructure projects.” Doctoral dissertation, Dept. of Civil and Environmental Engineering, Univ. of Waterloo.
O’Rourke, O. 2022. “What is the scope of work in a construction contract?” Accessed November 17, 2022. http://www.projectperfect.com.au/downloads/Info/info_define_the_scope.pdf.
Oviedo-Haito, R. J., J. Jiménez, F. F. Cardoso, and E. Pellicer. 2014. “Survival factors for subcontractors in economic downturns.” J. Constr. Eng. Manage. 140 (3): 04013056. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000811.
Power, W., D. Sinnott, and P. Lynch. 2021. “Evaluating the efficacy of a dedicated last planner system facilitator to enhance construction productivity.” Constr. Econ. Build. 21 (3): 142–158. https://doi.org/10.5130/AJCEB.v21i3.7640.
Sadler, C. L. 2021. NASA work breakdown structure (WBS) handbook. Hampton, VA: National Aeronautics and Space Administration.
Shan, Y., D. Zhai, P. M. Goodrum, C. T. Haas, and C. H. Caldas. 2016. “Statistical analysis of the effectiveness of management programs in improving construction labor productivity on large industrial projects.” J. Manage. Eng. 32 (1): 04015018. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000375.
Statista. 2020. “Productivity and industrial relations in the Australian construction industry.” Accessed April 7, 2021. https://www.statista.com/statistics/1078127/australia-construction-labor-productivity-index/#statisticContainer.
Tsehayae, A. A., and A. Robinson Fayek. 2014. “Identification and comparative analysis of key parameters influencing construction labour productivity in building and industrial projects.” Can. J. Civ. Eng. 41 (10): 878–891. https://doi.org/10.1139/cjce-2014-0031.
Vittinghoff, E., and C. E. Mcculloch. 2007. “Relaxing the rule of ten events per variable in logistic and Cox regression.” Am. J. Epidemiol. 165 (6): 710–718. https://doi.org/10.1093/aje/kwk052.
Wang, Z., H. Hu, and J. Gong. 2018. “Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components.” Autom. Constr. 86 (6): 69–80. https://doi.org/10.1016/j.autcon.2017.10.026.
Watt, A. 2014. Project management. Victoria, BC, Canada: BCcampus.
Zakeri, M., P. O. Olomolaiye, G. D. Holt, and F. C. Harris. 1996. “A survey of constraints on Iranian construction operatives’ productivity.” Construct. Manage. Econ. 14 (5): 417–426. https://doi.org/10.1080/014461996373287.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 149Issue 6June 2023

History

Received: Sep 14, 2022
Accepted: Jan 30, 2023
Published online: Mar 28, 2023
Published in print: Jun 1, 2023
Discussion open until: Aug 28, 2023

Permissions

Request permissions for this article.

Authors

Affiliations

Senior Lecturer in Construction Management, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia. ORCID: https://orcid.org/0000-0003-0750-4191. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share