Developing an Interactive Model to Integrate Human Expertise with Building Information Modeling

Publication: Journal of Architectural Engineering
Volume 29, Issue 1

Abstract

Considering the significant amount of time and money wasted yearly in fixing errors caused by miscommunication and inadequate information on project sites, relaying the knowledge of field experts through design software may reduce communication-based conflicts in projects. This study aimed to create a model to integrate human field expertise in the construction process with building information modeling (BIM) software. This study is based on the premise of the significance of human involvement in construction. Basement construction in Fargo, North Dakota, was the construction scenario selected for scrutiny in this study. Surveys and in-person interviews were conducted with local contractors to ascertain valuable recommendations and views on basement construction in Fargo. Information from these contractors was coded into models to offer warnings and recommendations on the assessed basement construction activities to help architecture, engineering, and construction (AEC) professionals with design, planning, and other processes required before and during construction. Combining BIM (with all its proven strengths) with the human aspect of construction will significantly improve the construction process, especially in decision-making and risk mitigation.

Practical Applications

The models developed in this study can be a valuable asset to any construction personnel involved in planning, design, and other preconstruction processes. The models provide users with location-specific recommendations on building activities. Possession of this specialized knowledge can improve the decision-making process for risk mitigation. An in-depth knowledge of location-specific project risks and their associated remedies from the local field experts improves the chances of efficient project delivery. This study developed an innovative way of making field expertise available to architecture, engineering, and construction (AEC) personnel who may not be conversant with the intricacies of new project locations. The results from this study indicate the existence of valuable human expertise in construction and the positive effects on project delivery if this expertise is properly utilized with available computing systems. The practicality of the developed models lies in their integration and usability with existing BIM software; therefore, this added knowledge can help mitigate risks and improve project success.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or codes that support the findings of this study are available from the corresponding author upon reasonable request, including model equations, surveys, and interviews.

Acknowledgments

This work was supported by EPSCoR funding, a research program among many others at North Dakota State University (NDSU). The authors would like to thank them for their continuous support.

References

Ahiable, C., and A. A. Banawi. 2021. “Progression of human experience integration in the construction industry.” In Proc., Int. Conf. on Applied Human Factors and Ergonomics, 45–50. Cham, Switzerland: Springer.
Alone, M. S. S. D. 2020. “Clash detection and elimination using BIM.” Int. Res. J. Eng. Technol. 7 (5): 6231–6236.
Alshebani, M. N., and G. Wedawatta. 2014. “Making the construction industry resilient to extreme weather: Lessons from construction in hot weather conditions.” Procedia Econ. Finance 18: 635–642. https://doi.org/10.1016/S2212-5671(14)00985-X.
Andrić, J. M., A. M. Mahamadu, J. Wang, P. X. Zou, and R. Zhong. 2019. “The cost performance and causes of overruns in infrastructure development projects in Asia.” J. Civ. Eng. Manage. 25 (3): 203–214. https://doi.org/10.3846/jcem.2019.8646.
Apipattanavis, S., K. Sabol, K. R. Molenaar, B. Rajagopalan, Y. Xi, B. Blackard, and S. Patil. 2010. “Integrated framework for quantifying and predicting weather-related highway construction delays.” J. Constr. Eng. Manage. 136 (11): 1160–1168. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000199.
Asl, M. R., S. Zarrinmehr, M. Bergin, and W. Yan. 2015. “BPOpt: A framework for BIM-based performance optimization.” Energy Build. 108: 401–412. https://doi.org/10.1016/j.enbuild.2015.09.011.
Azhar, S. 2011. “Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry.” Leadersh. Manage. Eng. 11 (3): 241–252. https://doi.org/10.1061/(ASCE)LM.1943-5630.0000127.
Azhar, S., M. Khalfan, and T. Maqsood. 2015. “Building information modeling (BIM): Now and beyond.” Constr. Econ. Build. 12 (4): 15–28. https://doi.org/10.5130/AJCEB.v12i4.3032.
Banawi, A. A., C. Ahiable, Z. Gao, and B. Bin. 2020. “Identifying best practices for the construction of residential basements in Fargo, North Dakota, USA using building information modeling (BIM).” In Proc., Int. Conf. on Applied Human Factors and Ergonomics, 161–167. Cham, Switzerland: Springer.
Borgheipour, H., G. Tehrani, S. Madadi, and I. Mohammadfam. 2020. “Identification and assessment of human errors among tower crane operators using SHERPA and CREAM techniques.” J. Health Saf. Work 10 (1): 5–8.
Ching, F. D. 2020. Building construction illustrated. Hoboken, NJ: Wiley.
Cox III, R. W., M. L. Hill, and S. Pyakuryal. 2008. “Tacit knowledge and discretionary judgment.” Public Integr. 10 (2): 151–164. https://doi.org/10.2753/PIN1099-9922100204.
Department of Commerce Division of Community Services. 2020. “North Dakota State Building Code.” Bismark, ND.
Dixit, S., S. N. Mandal, J. V. Thanikal, and K. Saurabh. 2019. “Evolution of studies in construction productivity: A systematic literature review (2006–2017).” Ain Shams Eng. J. 10 (3): 555–564. https://doi.org/10.1016/j.asej.2018.10.010.
Dixon, S. R., C. D. Wickens, and D. Chang. 2005. “Mission control of multiple unmanned aerial vehicles: A workload analysis.” Hum. Factors 47 (3): 479–487. https://doi.org/10.1518/001872005774860005.
Dreyfus, H., and S. Dreyfus. 2005. “Expertise in real world contexts.” Organ. Stud. 26 (5): 779–92. https://doi.org/10.1177/0170840605053102.
Eastman, C. M., C. Eastman, P. Teicholz, R. Sacks, and K. Liston. 2011. BIM handbook: A guide to building information modeling for owners, managers, designers, engineers, and contractors. Hoboken, NJ: Wiley.
El-Sayegh, S. M., and M. H. Mansour. 2015. “Risk assessment and allocation in highway construction projects in the UAE.” J. Manage. Eng. 31 (6): 04015004. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000365.
Eyal, G. 2013. “For a sociology of expertise: The social origins of the autism epidemic.” Am. J. Sociol. 118 (4): 863–907. https://doi.org/10.1086/668448.
Farmer, M. 2016. Modernize or die. London: Construction Leadership Council.
Farnsworth, C. B., S. Beveridge, K. R. Miller, and J. P. Christofferson. 2015. “Application, advantages, and methods 43 associated with using BIM in commercial construction.” Int. J. Constr. Educ. Res. 11 (3): 218–236. https://doi.org/10.1080/15578771.2013.865683.
Flanagan, R., A. Kendell, G. Norman, and G. D. Robinson. 1987. “Life cycle costing and risk management.” Constr. Manage. Econ. 5 (4): S53–S71. https://doi.org/10.1080/01446193.1987.10462093.
Friedson, E. 2001. Professionalism: The third logic. Cambridge, UK: Polity Press.
Gao, F., H. Zhou, H. Liang, S. Weng, and H. Zhu. 2020. “Structural deformation monitoring and numerical simulation of a supertall building during construction stage.” Eng. Struct. 209: 110033. https://doi.org/10.1016/j.engstruct.2019.110033.
Ghaffarianhoseini, A., J. Tookey, A. Ghaffarianhoseini, N. Naismith, S. Azhar, O. Efimova, and K. Raahemifar. 2017. “Building information modeling (BIM) uptake: Clear benefits, understanding its implementation, risks, and challenges.” Renewable Sustainable Energy Rev. 75: 1046–1053. https://doi.org/10.1016/j.rser.2016.11.083.
Ghassemi, R., and B. Becerik-Gerber. 2011. “Transitioning to integrated project delivery: Potential barriers and lessons learned.” Lean Constr. J. 1: 32–52.
Glick, S., and A. Guggemos. 2009. “IPD and BIM: Benefits and opportunities for regulatory agencies.” In Proc., 45th Associated Schools of Construction National Conf. Gainesville, FL: University of Florida.
Huang, S., Q. Liu, Y. Liu, Y. Kang, A. Cheng, and Z. Ye. 2018. “Frost heaving and frost cracking of elliptical cavities (fractures) in low-permeability rock.” Eng. Geol. 234: 1–10. https://doi.org/10.1016/j.enggeo.2017.12.024.
Jaeger, M., and D. Adair. 2010. “Human factors simulation in construction management education.” Eur. J. Eng. Educ. 35 (3): 299–309. https://doi.org/10.1080/03043797.2010.483607.
Jaillon, L., and C. S. Poon. 2008. “Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study.” Constr. Manage. Econ. 26 (9): 953–966. https://doi.org/10.1080/01446190802259043.
Juran, J. M. 1988. Juran’s quality control handbook. 4th ed. New York: McGraw-Hill.
Kadry, M., H. Osman, and M. Georgy. 2017. “Causes of construction delays in countries with high geopolitical risks.” J. Constr. Eng. Manage. 143 (2): 04016095. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001222.
Kandel, H. J., J. A. Brodshaug, D. D. Steele, J. K. Ransom, T. M. DeSutter, and G. R. Sands. 2013. Subsurface drainage effects on soil penetration resistance and water table depth on a clay soil in the Red River of the North Valley, USA. Agric. Eng. Int. CIGR J. 15 (1): 1–10.
Kandregula, S. K. 2020. “Investigating the perceived human errors in 4D-BIM construction scheduling.” Master thesis, Dept. of Civil Engineering, Clemson Univ.
Koscheyev, V., V. Rapgof, and V. Vinogradova. 2019. “Digital transformation of construction organizations.” In Vol. 497 of Proc., IOP Conf. Series: Materials Science and Engineering. Bristol, UK: IOP Publishing.
KPMG (Klynveld Peat Marwick Goerdeler) International. 2015. The 2015 global construction project owners survey. New York: KPMG.
Kuzminykh, A., A. Kukina, and G. Bardina. 2022. “4D and 5D design processes automation using databases, classification and applied programming.” In Robotics, machinery and engineering technology for precision agriculture, edited by M. Shamtsyan, M. Pasetti, and A. Beskopylny, 667–675. Singapore: Springer.
Liao, T. W., P. J. Egbelu, B. R. Sarker, and S. S. Leu. 2011. “Metaheuristics for project and construction management—A state-of-the-art review.” Autom. Constr. 20 (5): 491–505. https://doi.org/10.1016/j.autcon.2010.12.006.
Livingston, C. 2008. “From CAD to BIM: Constructing opportunities in architectural education.” In AEI 2008: Building Integration Solutions, edited by M. Ettouney, 1–9. Reston, VA: ASCE.
Lstiburek, J. W. 2019. “Keeping the water out of basements.” ASHRAE J. 61 (3): 62–68.
Masood, R., M. K. N. Kharal, and A. R. Nasir. 2014. “Is BIM adoption advantageous for the construction industry of Pakistan.” Procedia Eng. 77: 229–238. https://doi.org/10.1016/j.proeng.2014.07.021.
McBride, S. E., W. A. Rogers, and A. D. Fisk. 2014. “Understanding human management of automation errors.” Theor. Issues Ergon. Sci. 15 (6): 545–577. https://doi.org/10.1080/1463922X.2013.817625.
Moray, N., T. Inagaki, and M. Itoh. 2000. “Adaptive automation, trust, and self-confidence in fault management of time-critical tasks.” J. Exp. Psychol. Appl. 6 (1): 44–58. https://doi.org/10.1037//0278-7393.6.1.44.
Morton, P. J., and E. M. Thompson. 2011. “Uptake of BIM and IPD within the UK AEC industry: The evolving role of the architectural technologist.” Built Nat. Environ. Res. Pap. 4 (2): 275–286.
Nguyen, S. H., T. T. Do, and J. Ambre. 2020. “Study on INTOC waterproofing technology for basement of high-rise buildings.” In Proc., 5th Int. Conf. on Green Technology and Sustainable Development, 516–522. New York: IEEE.
Ning, X., K. C. Lam, and M. C. K. Lam. 2011. “A decision-making system for construction site layout planning.” Autom. Constr. 20 (4): 459–473. https://doi.org/10.1016/j.autcon.2010.11.014.
Nistal-Nuño, B. 2019. “The application of formal axiology to medical education through the Hartman value profile: A prospective cohort study.” J. Adv. Med. Educ. Prof. 7 (4): 213.
Olawumi, T. O., D. W. Chan, and J. K. Wong. 2017. “Evolution in the intellectual structure of BIM research: A bibliometric analysis.” J. Civ. Eng. Manage. 23 (8): 1060–1081. https://doi.org/10.3846/13923730.2017.1374301.
Pagano, T. C., F. Pappenberger, A. W. Wood, M. H. Ramos, A. Persson, and B. Anderson. 2016. “Automation and human expertise in operational river forecasting.” Wiley Interdiscip. Rev.: Water 3 (5): 692–705. https://doi.org/10.1002/wat2.1163.
Parasuraman, R., T. B. Sheridan, and C. D. Wickens. 2000. “A model for types and levels of human interaction with automation.” IEEE Trans. Syst. Man Cybern. Part A Syst. Humans 30 (3): 286–297. https://doi.org/10.1109/3468.844354.
Pradier, M. F., J. Zazo, S. Parbhoo, R. H. Perlis, M. Zazzi, and F. Doshi-Velez. 2021. “Preferential mixture-of-experts: Interpretable models that rely on human expertise as much as possible.” Preprint, submitted January 13, 2021. https://doi.org/10.48550/arXiv.2101.05360.
Pyke, C., S. McMahon, T. Dietsche, and US Green Building Council. 2010. Green building & human experience. USGBC Research Program White Paper. Washington, DC: USGBC.
Qin, Z., Y. Lai, Y. Tian, and F. Yu. 2019. “Frost-heaving mechanical model for concrete face slabs of earthen dams in cold regions.” Cold Reg. Sci. Technol. 161: 91–98. https://doi.org/10.1016/j.coldregions.2019.03.009.
Shaikh, S. A. 2017. “A comparative study of views and the role of labor in Marxian, mainstream, and Islamic economics.” In Labor in an Islamic setting, edited by N. Kizilkaya and T. Azid, 131–141. London: Routledge.
Tan, Y. C., and C. M. Chow. 2008. “Design of retaining wall and support systems for deep basement construction—A Malaysian experience.” In Vol. 24 of Seminar on “Deep Excavation and Retaining Walls.” Singapore: Springer.
Thurairajah, N., and D. Goucher. 2013. “Advantages and challenges of using BIM: A cost consultant’s perspective.” In Proc., 49th ASC Annual Int. Conf. San Luis Obispo, CA: California Polytechnic State University.
Tornincasa, S., and F. Di Monaco. 2010. “The future and the evolution of CAD.” In Vol. 1 of Proc., 14th Int. Research/Expert Conf.: Trends in the Development of Machinery and Associated Technology, 11–18.
Trevor, C. O., and R. Piyanontalee. 2019. “Discharges, poor performing quits, and layoffs as ‘valued exits’: Is it really addition by subtraction?” Annu. Rev. Organ. Psychol. Organ. Behav. 7: 181–211.
Tylek, I., K. Kuchta, and A. Rawska-Skotniczny. 2017. “Human errors in the design and execution of steel structures—A case study.” Struct. Eng. Int. 27 (3): 370–379. https://doi.org/10.2749/101686617X14881937385287.
Zhang, G., H. Yu, H. Li, and Y. Yang. 2019. “Experimental study of deformation of early age concrete suffering from frost damage.” Constr. Build. Mater. 215: 410–421. https://doi.org/10.1016/j.conbuildmat.2019.04.187.

Information & Authors

Information

Published In

Go to Journal of Architectural Engineering
Journal of Architectural Engineering
Volume 29Issue 1March 2023

History

Received: Apr 22, 2021
Accepted: Oct 3, 2022
Published online: Nov 25, 2022
Published in print: Mar 1, 2023
Discussion open until: Apr 25, 2023

Permissions

Request permissions for this article.

Authors

Affiliations

Cyril Ahiable [email protected]
Graduate Student, Dept. Construction Management and Engineering, North Dakota State Univ., Fargo, ND 58108. Email: [email protected]
Abdulaziz Banawi [email protected]
Assistant Professor, Dept. of Construction Management and Engineering, North Dakota State Univ., Fargo, ND 58108 (corresponding author). Email: [email protected]
Zhili Gao, M.ASCE [email protected]
Associate Professor, Dept. of Construction Management and Engineering, North Dakota State Univ., Fargo, ND 58108. Email: [email protected]
Simon Boateng [email protected]
Graduate Student, Dept. of Construction Management and Engineering, North Dakota State Univ., Fargo, ND 58108. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share