The purpose of this paper is to capture the direct and indirect effects of COVID-19 emerging risks on construction projects’ success in developing countries from the contractors’ perspective. To achieve this, we collected data from Iraqi construction industry and conducted the following multistage research methodology: (1) preliminary investigation with four construction contractors to identify the success indicators of construction projects; (2) focus group session with 11 experts to identify the COVID-19 emerging risks for the construction industry; (3) semistructured interviews with seven construction experts to develop several hypotheses on the effect of COVID-19 emerging risks on project success; (4) survey data collection from 99 construction contractors; and (5) development of a structural equation model (SEM) to analyze the effects of COVID-19 emerging risks on project success. The results of the SEM analysis show that financial market (FM)–related risks, supply chain operations (SCO)–related risks, health and safety of construction workforce (HSCW)–related risks, organizational implications (OI)–related risks, and contractual implications (CI)–related risks have a significant impact on construction projects success. CI-related risks have the strongest total effects on project success, followed by OI-related risks, FM-related risks, HSCW-related risks, and SCO-related risks, respectively. The results also emphasis the significant mediation role of CI between COVID-19 emerging risks and project success. This study contributes to the body of knowledge and contracting companies by helping researchers and construction contractors to better understand how the key risk factors emerging from extreme conditions like the COVID-19 pandemic affect construction projects’ success and may serve as a guideline for developing effective response strategies.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

All data generated or analyzed during the study are included in the published paper.

Acknowledgments

This research is part of the first author’s Ph.D. thesis conducted at the University of Southampton, UK.

References

AbdulLateef, O., P. J. Anavhe, and H. C. Chu. 2022. “Disputes and claim management during the COVID-19 crisis: The lessons learned.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 15 (1): 04522054. https://doi.org/10.1061/JLADAH.LADR-843.
Ab Sani, J., and N. Othman. 2012. “Quality standard and specification for soft-scape construction in Malaysia.” Procedia-Social Behav. Sci. 35 (Jan): 260–266. https://doi.org/10.1016/j.sbspro.2012.02.087.
Adeleke, A. Q., W. A. Ajibike, G. N. Muuka, M. R. Darun, and T. D. Moshood. 2021. “Managing external risk factors on oil and gas project success: A dream for all firms.” ASCE-ASME J. Risk Uncertainty Eng. Syst., Part A: Civ. Eng. 7 (4): 04021063. https://doi.org/10.1061/AJRUA6.0001187.
Agyekum, K., A. S. Kukah, and J. Amudjie. 2021. “The impact of COVID-19 on the construction industry in Ghana: The case of some selected firms.” J. Eng. Des. Technol. 20 (1): 222–244. https://doi.org/10.1108/JEDT-11-2020-0476.
Akhtaruzzaman, M., S. Boubaker, M. Chiah, and A. Zhong. 2021. “COVID-19 and oil price risk exposure.” Finance Res. Lett. 42 (Oct): 101882. https://doi.org/10.1016/j.frl.2020.101882.
Alaloul, W. S., M. S. Liew, N. A. W. Zawawi, B. S. Mohammed, M. Adamu, and M. A. Musharat. 2020. “Structural equation modelling of construction project performance based on coordination factors.” Cogent Eng. 7 (1): 1726069. https://doi.org/10.1080/23311916.2020.1726069.
Ali, A. S., and I. Rahmat. 2010. “The performance measurement of construction projects managed by ISO-certified contractors in Malaysia.” J. Retail Leisure Property 9 (1): 25–35. https://doi.org/10.1057/rlp.2009.20.
Aljamee, H., S. Naeem, and A. Bell. 2020. “The causes of project delay in Iraqi petroleum industry: A case study in Basra Oil Company.” J. Transnational Manage. 25 (1): 57–70. https://doi.org/10.1080/15475778.2019.1698935.
Al-karawi, S. N. 2018. “Challenges facing construction contracts in Iraq.” J. Eng. Sustainable Dev. 2018 (4): 192–201. https://doi.org/10.31272/jeasd.2018.4.14.
Al Khayat, A. 2019. Assessment of the labour market and skills analysis Iraq and Kurdistan Region-Iraq. Paris: United Nations Educational, Scientific and Cultural Organization.
Al-Mhdawi, M. K. S. 2020. “Proposed risk management decision support methodology for oil and gas construction projects.” In Proc., 10th Int. Conf. on Engineering, Project, and Production Management, 407–420. Singapore: Springer.
Al-Mhdawi, M. K. S. 2022. “Risk management of construction projects under extreme conditions: A case study of Iraq.” Ph.D. thesis, Dept. of Decision Analytics and Risk, The Univ. of Southampton.
Al-Mhdawi, M. K. S., M. P. Brito, M. Abdul Nabi, I. H. El-adaway, and B. S. Onggo. 2022a. “Capturing the impact of COVID-19 on construction projects in developing countries: A case study of Iraq.” J. Manage. Eng. 38 (1): 05021015. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000991.
Al-Mhdawi, M. K. S., M. P. Brito, B. S. Onggo, and H. A. Rashid. 2022b. “Analyzing the impact of the COVID-19 pandemic risks on construction projects in developing countries: Case of Iraq.” In Proc., Construction Research Congress, 1013–1023. Berlin: Springer.
Al-Mhdawi, M. K. S., I. Motawa, and H. A. Rasheed. 2020. “Assessment of risk management practices in construction industry.” In Proc., 10th Int. Conf. on Engineering, Project, and Production Management, 421–433. Singapore: Springer.
Al-Mhdawi, M. K. S., A. O’Connor, M. Brito, A. Qazi, and H. A. Rashid. 2022c. Modeling the effects of construction risks on the performance of oil and gas projects in developing countries: Project managers’ perspective.” In Proc., Civil Engineering Research in Ireland Conf. (CERI 2022), Dublin, Ireland, 25-26 August 2022, Niall Holmes, Caitriona De Paor & Roger P. West, 2022, 486–491. Dublin, Ireland: Civil Engineering Research in Ireland and Irish Transport Research Network.
Al-Qaicy, S. T., and H. K. Breesam. 2021. “An analytical study to evaluate Iraqi construction sector readiness to manage post-disaster reconstruction.” In Proc., Int. Conf. of Modern Applications on Information and Communication Technology. Babylon, Iraq: IOPscience.
Alsamarraie, M. M., and F. Ghazali. 2021. “The impact of COVID-19 and control strategies adoption in the construction sector.” Ann. Rom. Soc. Cell Biol. 25 (6): 19524–19531.
Alsharef, A., S. Banerjee, S. M. Uddin, A. Albert, and E. Jaselskis. 2021. “Early impacts of the COVID-19 pandemic on the United States construction industry.” Int. J. Environ. Res. Public Health 18 (4): 1559. https://doi.org/10.3390/ijerph18041559.
Amoah, C., E. Bamfo-Agyei, and F. Simpeh. 2021. “The COVID-19 pandemic: The woes of small construction firms in Ghana.” Smart Sustainable Built Environ. 11 (4): 1099–1115. https://doi.org/10.1108/SASBE-02-2021-0025.
Araya, F. 2021. “Modeling the spread of COVID-19 on construction workers: An agent-based approach.” Saf. Sci. 133 (Jan): 105022. https://doi.org/10.1016/j.ssci.2020.105022.
Ashmawi, K., L. A. Hadidi, S. Assaf, F. M. Tuffaha, and K. Al-Ofi. 2018. “Risk assessment and allocation in the contract for public works used in Saudi Arabia construction industry.” Cogent Eng. 5 (1): 1490148. https://doi.org/10.1080/23311916.2018.1490148.
Assaad, R., I. H. El-Adaway, and I. S. Abotaleb. 2020. “Predicting project performance in the construction industry.” J. Constr. Eng. Manage. 146 (5): 04020030. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001797.
Bagozzi, R. P., Y. Yi, and L. W. Phillips. 1991. “Assessing construct validity in organizational research.” Admin. Sci. Q. 36 (3): 421–458. https://doi.org/10.2307/2393203.
Bancalari, A., and O. Molina. 2020. Has COVID-19 ‘infected’ infrastructure development in Peru? Accessed July 10, 2020. https://blogs.lse.ac.uk/latamcaribbean/.
Bekr, G. A. 2015. “Causes of delay in public construction projects in Iraq.” Jordan J. Civ. Eng. 9 (2): 149–162.
Boadu, E. F., C. C. Wang, and R. Y. Sunindijo. 2020. “Characteristics of the construction industry in developing countries and its implications for health and safety: An exploratory study in Ghana.” Int. J. Environ. Res. Public Health 17 (11): 4110. https://doi.org/10.3390/ijerph17114110.
Breen, R. L. 2006. “A practical guide to focus-group research.” J. Geogr. Higher Educ. 30 (3): 463–475. https://doi.org/10.1080/03098260600927575.
Buniya, M. K., I. Othman, R. Y. Sunindijo, A. F. Kineber, E. Mussi, and H. Ahmad. 2021. “Barriers to safety program implementation in the construction industry.” Ain Shams Eng. J. 12 (1): 65–72. https://doi.org/10.1016/j.asej.2020.08.002.
Butt, A. S. 2021. “Understanding the implications of pandemic outbreaks on supply chains: An exploratory study of the effects caused by the COVID-19 across four South Asian countries and steps taken by firms to address the disruptions.” Int. J. Phys. Distrib. Logist. Manage. 52 (4): 370–392. https://doi.org/10.1108/IJPDLM-08-2020-0281.
BW (Business Wire). 2022. “Iraq construction market trends and opportunities report, H1 2021—ResearchAndMarkets.com.” Accessed September 1, 2022. https://www.businesswire.com/news/home/20210817005520/en/Iraq-Construction-Market-Trends-and-Opportunities-Report-H1-2021---ResearchAndMarkets.com.
Cachia, M., and L. Millward. 2011. “The telephone medium and semi-structured interviews: A complementary fit.” Qual. Res. Organ. Manage.: Int. J. 6 (3): 265–277. https://doi.org/10.1108/17465641111188420.
Chan, A. P., D. Scott, and E. W. Lam. 2002. “Framework of success criteria for design/build projects.” J. Manage. Eng. 18 (3): 120–128. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(120).
Chan, A. P. C., and A. P. Chan. 2004. “Key performance indicators for measuring construction success.” Benchmarking: Int. J. 11 (2): 203–221. https://doi.org/10.1108/14635770410532624.
Chigara, B., and T. Moyo. 2021. “Factors affecting the delivery of optimum health and safety on construction projects during the covid-19 pandemic in Zimbabwe.” J. Eng. Des. Technol. 20 (1): 24–46. https://doi.org/10.1108/JEDT-01-2021-0053.
Cho, E. 2016. “Making reliability reliable: A systematic approach to reliability coefficients.” Organ. Res. Methods 19 (4): 651–682. https://doi.org/10.1177/1094428116656239.
Creswell, J. W., and V. L. P. Clark. 2017. Designing and conducting mixed methods research. Thousand Oaks, CA: Sage Publications.
Creswell, J. W., and J. D. Creswell. 2017. Research design: Qualitative, quantitative, and mixed methods approaches. Thousand Oaks, CA: Sage Publications.
Czarnigowska, A., and A. Sobotka. 2013. “Time–cost relationship for predicting construction duration.” Arch. Civ. Mech. Eng. 13 (4): 518–526. https://doi.org/10.1016/j.acme.2013.05.004.
Darvas, P., and R. Palmer. 2014. Demand and supply of skills in Ghana: How can training programs improve employment and productivity? Washington, DC: World Bank Publications.
Dash, G., and J. Paul. 2021. “CB-SEM vs PLS-SEM methods for research in social sciences and technology forecasting.” Technol. Forecasting Soc. Change 173 (Dec): 121092. https://doi.org/10.1016/j.techfore.2021.121092.
Durdyev, S., S. Ismail, and N. A. Bakar. 2012. “Factors causing cost overruns in construction of residential projects: Case study of Turkey.” Int. J. Sci. Manage. 1 (1): 3–12.
Elliott, A. C., and W. Woodward. 2007. Statistical analysis quick reference guidebook: With SPSS example. Thousand Oaks, CA: SAGE.
Elnaggar, S. M., and H. Elhegazy. 2022. “Study the impact of the COVID-19 pandemic on the construction industry in Egypt.” Structures 35 (Jan): 1270–1277. https://doi.org/10.1016/j.istruc.2021.09.028.
Falk, R. F., and N. B. Miller. 1992. A primer for soft modeling. Akron, OH: Univ. of Akron Press.
Fellows, R. F., and A. M. Liu. 2021. Research methods for construction. New York: Wiley.
Ferrett, E. 2015. Health and safety in construction revision guide: For the NEBOSH national certificate in construction health and safety. London: Routledge.
Fornell, C., and D. F. Larcker. 1981. “Structural equation models with unobservable variables and measurement error: Algebra and statistics.” J. Mark. Res. 18 (3): 382–388. https://doi.org/10.1177/002224378101800313.
Freson, T. S. 2015. Invariance, convergent and discriminant validity across occasions for the male body image disturbance scale. Washington, DC: Washington State Univ.
Gefen, D., and D. Straub. 2005. “A practical guide to factorial validity using PLS-Graph: Tutorial and annotated example.” Commun. Assoc. Inf. Syst. 16 (1): 91–109. https://doi.org/10.17705/1CAIS.01605.
Gill, I., and P. Schellekens. 2021. “COVID-19 is a developing country pandemic.” Accessed January 20, 2021. https://www.brookings.edu/blog/future-development/2021/05/27/covid-19-is-a-developing-country-pandemic/.
Goh, C. S., and H. Abdul-Rahman. 2013. “The identification and management of major risks in the Malaysian construction industry.” J. Constr. Dev. Countries 18 (1): 19.
Guerlain, C., S. Renault, and F. Ferrero. 2019. “Understanding construction logistics in urban areas and lowering its environmental impact: A focus on construction consolidation centres.” Sustainability 11 (21): 6118. https://doi.org/10.3390/su11216118.
Hair, J. F. 2014. A primer on partial least squares structural equations modeling (PLS-SEM). Newcastle upon Tyne, UK: SAGE.
Hair, J. F., W. C. Black, B. J. Babin, and R. E. Anderson. 2010. Mutilvariate data analysis. 7th ed. Upper Saddle River, NJ: Pearson Prentice Hall.
Hair, J. F., G. T. M. Hult, C. M. Ringle, and M. Sarstedt. 2017. A primer on partial least squares structural equation modeling (PLS-SEM). 2nd ed. Thousand Oakes, CA: SAGE.
Hair, J. F., Jr., G. T. M. Hult, C. M. Ringle, and M. Sarstedt. 2021. A primer on partial least squares structural equation modeling (PLS-SEM). Thousand Oaks, CA: SAGE.
Hair, J. F., C. M. Ringle, and M. Sarstedt. 2011. “PLS-SEM: Indeed a silver bullet.” J. Mark. Theory Pract. 19 (2): 139–152. https://doi.org/10.2753/MTP1069-6679190202.
Hair, J. F., C. M. Ringle, and M. Sarstedt. 2013. “Partial least squares structural equation modeling: Rigorous applications, better results and higher acceptance.” Long Range Plann. 46 (1–2): 1–12. https://doi.org/10.1016/j.lrp.2013.01.001.
Hair, J. F., Jr., M. Sarstedt, L. Hopkins, and V. G. Kuppelwieser. 2014. “Partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research.” Eur. Bus. Rev. 26 (2): 106–121. https://doi.org/10.1108/EBR-10-2013-0128.
Hamie, J. M., and M. A. U. Abdul-Malak. 2018. “Model language for specifying the construction contract’s order-of-precedence clause.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 10 (3): 04518011. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000260.
Harthi, B. A. A. 2015. “Risk management in fast-track projects: A study of UAE construction projects.” Ph.D. thesis, School of Architecture and Built Environment, Univ. of Wolverhampton.
Hasanzadeh, S., J. M. de la Garza, and E. S. Geller. 2020. “How sensation-seeking propensity determines individuals’ risk-taking behaviors: Implication of risk compensation in a simulated roofing task.” J. Manage. Eng. 36 (5): 04020047. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000813.
Hennink, M., and B. N. Kaiser. 2021. “Sample sizes for saturation in qualitative research: A systematic review of empirical tests.” Social Sci. Med. 292 (Jan): 114523. https://doi.org/10.1016/j.socscimed.2021.114523.
Henseler, J., T. K. Dijkstra, M. Sarstedt, C. M. Ringle, A. Diamantopoulos, D. W. Straub, D. J. Ketchen, J. F. Hair, G. T. M. Hult, and R. J. Calantone. 2014. “Common beliefs and reality about PLS: Comments on Rönkkö and Evermann (2013).” Organ. Res. Methods 17 (2): 182–209. https://doi.org/10.1177/1094428114526928.
Henseler, J., C. M. Ringle, and M. Sarstedt. 2015. “A new criterion for assessing discriminant validity in variance-based structural equation modeling.” J. Acad. Mark. Sci. 43 (1): 115–135. https://doi.org/10.1007/s11747-014-0403-8.
Hsieh, H. F., and S. E. Shannon. 2005. “Three approaches to qualitative content analysis.” Qual. Health Res. 15 (9): 1277–1288. https://doi.org/10.1177/1049732305276687.
Hu, L. T., and P. M. Bentler. 1999. “Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives.” Struct. Equation Modell. Multidiscip. J. 6 (1): 1–55. https://doi.org/10.1080/10705519909540118.
Hughes, S. W., D. D. Tippett, and W. K. Thomas. 2004. “Measuring project success in the construction industry.” Eng. Manage. J. 16 (3): 31–37. https://doi.org/10.1080/10429247.2004.11415255.
Ibn-Mohammed, T., et al. 2021. “A critical analysis of the impacts of COVID-19 on the global economy and ecosystems and opportunities for circular economy strategies.” Resour. Conserv. Recycl. 164 (Jan): 105169. https://doi.org/10.1016/j.resconrec.2020.105169.
ILO (International Labour of Organization). 2021. Impact of COVID-19 on the construction sector. Geneva: ILO Sectoral Brief.
Jahanger, Q. K. 2013. “Important causes of delay in construction projects in Baghdad city.” Aust. J. Basic Appl. Sci. 7 (4): 14–23.
Jallow, H., S. Renukappa, and S. Suresh. 2020. “The impact of COVID-19 outbreak on United Kingdom infrastructure sector.” Smart Sustainable Built Environ. 10 (4): 581–593. https://doi.org/10.1108/SASBE-05-2020-0068.
Jiang, W., Y. Lu, and Y. Le. 2016. “Trust and project success: A twofold perspective between owners and contractors.” J. Manage. Eng. 32 (6): 04016022. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000469.
Karna, S., J. M. Junnonen, and J. Kankainen. 2004. “Customer satisfaction in construction.” In Proc., 12th Annual Conf. on Lean Construction, 476–488. Helsingør, Denmark: International Group for Lean Construction.
Khalfan, M., and M. Ismail. 2020. “Engineering projects and crisis management: A descriptive study on the impact of COVID-19 on engineering projects in Bahrain.” In Proc., 2020 Second Int. Sustainability and Resilience Conf.: Technology and Innovation in Building Designs (51154), 1–5. New York: IEEE.
King, S. S., R. A. Rahman, M. A. Fauzi, and A. T. Haron. 2021. “Critical analysis of pandemic impact on AEC organizations: The COVID-19 case.” J. Eng. Des. Technol. 20 (1): 358–383. https://doi.org/10.1108/JEDT-04-2021-0225.
Kish, L. 1995. “Methods for design effects.” J. Off. Stat. 11 (1): 55.
Krajangsri, T., and J. Pongpeng. 2017. “Effect of sustainable infrastructure assessments on construction project success using structural equation modeling.” J. Manage. Eng. 33 (3): 04016056. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000509.
Krippendorff, K. 2018. Content analysis: An introduction to its methodology. Thousand Oaks, CA: Sage Publications.
Kukoyi, P. O., F. Simpeh, O. J. Adebowale, and J. N. Agumba. 2021. “Managing the risk and challenges of COVID-19 on construction sites in Lagos, Nigeria.” J. Eng. Des. Technol. 20 (1): 99–144. https://doi.org/10.1108/JEDT-01-2021-0058.
Le, A. T. H., N. Domingo, E. Rasheed, and K. Park. 2022. “Maturity model of building maintenance management for New Zealand’s state schools.” Build. Res. Inf. 50 (4): 438–451. https://doi.org/10.1080/09613218.2021.1961573.
Li, B., Y. Gao, S. Zhang, and C. Wang. 2021. “Understanding the effects of trust and conflict event criticality on conflict resolution behavior in construction projects: Mediating role of social motives.” J. Manage. Eng. 37 (6): 04021066. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000962.
Liu, J., X. Zhao, and P. Yan. 2016. “Risk paths in international construction projects: Case study from Chinese contractors.” J. Constr. Eng. Manage. 142 (6): 05016002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001116.
Mahmoud, A. H. 2020. “Factors affecting performance at the Iraqi Construction Projects, Ministry of Construction, and Housing and Municipalities and Public Works of Iraq as a case study.” Asian J. Civ. Eng. 21 (1): 105–118. https://doi.org/10.1007/s42107-019-00195-1.
Majer, R., H. Ellingerová, and J. Gašparík. 2020. “Methods for the calculation of the lost profit in construction contracts.” Buildings 10 (4): 74. https://doi.org/10.3390/buildings10040074.
Markogiannaki, O. 2019. “Climate change and natural hazard risk assessment framework for coastal cable-stayed bridges.” Front. Built Environ. 5 (Oct): 116. https://doi.org/10.3389/fbuil.2019.00116.
Martin, P. 2009. The recession and migration: Alternative scenarios. Oxford, UK: Univ. of Oxford.
Matli, W. 2020. “The changing work landscape as a result of the Covid-19 pandemic: Insights from remote workers life situations in South Africa.” Int. J. Sociol. Social Policy 40 (9–10): 1237–1256. https://doi.org/10.1108/IJSSP-08-2020-0386.
McFadden, P., E. Russ, P. Blakeman, G. Kirwin, J. Anand, S. Lähteinen, G. A. Baugerud, and P. Tham. 2020. “COVID-19 impact on social work admissions and education in seven international universities.” Social Work Educ. 39 (8): 1154–1163. https://doi.org/10.1080/02615479.2020.1829582.
Nabil, F. R., M. Namian, J. Shukes, D. Batie, and M. K. S. Al-Mhdawi. 2022. “COVID-19 vaccine acceptance among construction workers.” EPiC Ser. Built Environ. 3 (May): 56–64.
Nguyen, B. N., T. Q. Nguyen, H. T. Dinh, and A. T. Chu. 2021. “The impact of the COVID-19 on the construction industry in Vietnam.” Int. J. Built Environ. Sustainability 8 (3): 47–61. https://doi.org/10.11113/ijbes.v8.n3.745.
OECD (Organization for Economic Co-operation and Development). 2020. “The world economy on a tightrope.” Accessed January 4, 2021. http://www.oecd.org/OECD.
Ogunnusi, M., T. Omotayo, M. Hamma-Adama, B. O. Awuzie, and T. Egbelakin. 2021. “Lessons learned from the impact of COVID-19 on the global construction industry.” J. Eng. Des. Technol. 20 (1): 299–320. https://doi.org/10.1108/JEDT-05-2021-0286.
Olanrewaju, O. I., N. Chileshe, E. O. Adekunle, and C. Salihu. 2022. “Modelling the environmental, economic and social impacts of coronavirus pandemic on the construction industry.” Int. J. Construct. Manage. 1–14. https://doi.org/10.1080/15623599.2022.2120077.
Olatunde, N. A., I. A. Awodele, and B. O. Adebayo. 2021. “Impact of COVID-19 pandemic on indigenous contractors in a developing economy.” J. Eng. Des. Technol. 20 (1): 267–280. https://doi.org/10.1108/JEDT-11-2020-0480.
Oluka, P. N., and B. C. Basheka. 2014. “Determinants and constraints to effective procurement contract management in Uganda: A practitioner’s perspective.” Int. J. Logist. Syst. Manage. 17 (1): 104–124. https://doi.org/10.1504/IJLSM.2014.057983.
Olukolajo, M. A., A. K. Oyetunji, and I. B. Oluleye. 2021. “Covid-19 protocols: Assessing construction site workers compliance.” J. Eng. Des. Technol. 20 (1): 115–131. https://doi.org/10.1108/JEDT-03-2021-0131.
Onubi, H. O., and A. S. Hassan. 2020. “How environmental performance influence client satisfaction on projects that adopt green construction practices: The role of economic performance and client types.” J. Cleaner Prod. 272 (Nov): 122763. https://doi.org/10.1016/j.jclepro.2020.122763.
Pamidimukkala, A., and S. Kermanshachi. 2021. “Impact of Covid-19 on field and office workforce in construction industry.” Project Leadersh. Soc. 2 (Dec): 100018. https://doi.org/10.1016/j.plas.2021.100018.
Perry, C. M., J. C. Álvarez, and J. F. López. 2014. “Manufacturing and continuous improvement areas using partial least square path modeling with multiple regression comparison.” In Proc., CBU Int. Conf. Proc., 15–26. Freiburg, Germany: ISE Research Institute.
Prosper Bright, M., N. Terrence Kudzai, and C. Ngavaite. 2021. “The impact of COVID-19 on agricultural extension and food supply in Zimbabwe.” Cogent Food Agric. 7 (1): 1918428. https://doi.org/10.1080/23311932.2021.1918428.
Puil, J., and A. V. Weele. 2014. International contracting: Contract management in complex construction projects. London: World Scientific.
Quang, T. D., T. C. Tran, V. H. Tran, T. T. Nguyen, and T. T. Nguyen. 2022. “Is Vietnam ready to welcome tourists back? Assessing COVID-19’s economic impact and the Vietnamese tourism industry’s response to the pandemic.” Curr. Issues Tourism 25 (1): 115–133. https://doi.org/10.1080/13683500.2020.1860916.
Rani, H. A., A. M. Farouk, K. S. Anandh, S. Almutairi, and R. A. Rahman. 2022. “Impact of COVID-19 on construction projects: The case of India.” Buildings 12 (6): 762. https://doi.org/10.3390/buildings12060762.
Rehman, M. S. U., M. T. Shafiq, and M. Afzal. 2021. “Impact of COVID-19 on project performance in the UAE construction industry.” J. Eng. Des. Technol. 20 (1): 245–266. https://doi.org/10.1108/JEDT-12-2020-0481.
Ringle, C. M., M. Sarstedt, R. Mitchell, and S. P. Gudergan. 2020. “Partial least squares structural equation modeling in HRM research.” Int. J. Human Resour. Manage. 31 (12): 1617–1643. https://doi.org/10.1080/09585192.2017.1416655.
Rokooei, S., A. Alvanchi, and M. Rahimi. 2022. “Perception of COVID-19 impacts on the construction industry over time.” Cogent Eng. 9 (1): 2044575. https://doi.org/10.1080/23311916.2022.2044575.
Salami, B. A., S. O. Ajayi, and A. S. Oyegoke. 2021. “Tackling the impacts of Covid-19 on construction projects: An exploration of contractual dispute avoidance measures adopted by construction firms.” Int. J. Construct. Manage. 1–9. https://doi.org/10.1080/15623599.2021.1963561.
Sarhan, J. G., B. Xia, S. Fawzia, and A. Karim. 2017. “Lean construction implementation in the Saudi Arabian construction industry.” Constr. Econ. Build. 17 (1): 46–69. https://doi.org/10.5130/AJCEB.v17i1.5098.
Sarstedt, M., C. M. Ringle, and J. F. Hair. 2017. “Partial least squares structural equation modeling.” In Handbook of market research, edited by C. Homburg, M. Klarmann, and A. Vomberg. Cham, Switzerland: Springer.
Saunders, L. W., A. P. McCoy, B. M. Kleiner, H. Lingard, T. Cooke, T. Mills, N. Blismas, and R. Wakefield. 2016. “International benchmarking for performance improvement in construction safety and health.” Benchmarking: Int. J. 23 (4): 916–936. https://doi.org/10.1108/BIJ-11-2013-0105.
Schilling, D. R. 2013. “Global construction expected to increase by $4.8 trillion by 2020.” Accessed February 27, 2023. https://www.industrytap.com/global-construction-expected-to-increase-by-4-8-trillion-by-2020/1483.
Shackman, J. D. 2013. “The use of partial least squares path modeling and generalized structured component analysis in international business research: A literature review.” Int. J. Manage. 30 (3): 78.
Shehu, Z., I. R. Endut, and A. Akintoye. 2014. “Factors contributing to project time and hence cost overrun in the Malaysian construction industry.” J. Financ. Manage. Property Constr. 19 (1): 55–75. https://doi.org/10.1108/JFMPC-04-2013-0009.
Sierra, F. 2021. “COVID-19: Main challenges during construction stage.” Eng. Constr. Archit. Manage. 29 (4): 1817–1834. https://doi.org/10.1108/ECAM-09-2020-0719.
Simpeh, F., and C. Amoah. 2021. “Assessment of measures instituted to curb the spread of COVID-19 on construction site.” Int. J. Construct. Manage. 23 (3): 383–391. https://doi.org/10.1080/15623599.2021.1874678.
Singhal, T. 2020. “A review of coronavirus disease-2019 (COVID-19).” Indian J. Pediatr. 87 (4): 281–286. https://doi.org/10.1007/s12098-020-03263-6.
Stiles, S., D. Golightly, and B. Ryan. 2021. “Impact of COVID-19 on health and safety in the construction sector.” Hum. Factors Ergon. Manuf. Serv. Ind. 31 (4): 425–437. https://doi.org/10.1002/hfm.20882.
Suzuki, K., and L. S. Pheng. 2019. Japanese contractors in overseas markets: Bridging cultural and communication gaps. Singapore: Springer.
Taber, K. S. 2018. “The use of Cronbach’s alpha when developing and reporting research instruments in science education.” Res. Sci. Educ. 48 (6): 1273–1296. https://doi.org/10.1007/s11165-016-9602-2.
Tan, Y., L. Shen, L. Craig, W. Lu, and M. C. H. Yam. 2014. Critical success factors for building maintenance business: A Hong Kong case study. Facilities 32 (5–6): 208–225.
Thorsen, S. V., and J. B. Bjorner. 2010. “Reliability of the Copenhagen psychosocial questionnaire.” Scand. J. Public Health 38 (3): 25–32. https://doi.org/10.1177/1403494809349859.
Umar, T. 2022. “The impact of COVID-19 on the GCC construction industry.” Int. J. Serv. Sci. Manage. Eng. Technol. 13 (2): 1–17. https://doi.org/10.4018/IJSSMET.20220301.oa1.
UNESCO. 2015. “UNESCO Iraq Office newsletter.” Accessed September 20, 2022. https://unesdoc.unesco.org/ark:/48223/pf0000245107.
Van Steenkiste, E., J. Schoofs, S. Gilis, and P. Messiaen. 2022. “Mental health impact of COVID-19 in frontline healthcare workers in a Belgian Tertiary care hospital: A prospective longitudinal study.” Acta Clin. Belg. 77 (3): 533–540. https://doi.org/10.1080/17843286.2021.1903660.
World Bank. 2020. Global recessions. Washington, DC: World Bank.
Wu, Z., T. Nisar, D. Kapletia, and G. Prabhakar. 2017. “Risk factors for project success in the Chinese construction industry.” J. Manuf. Technol. Manage. 28 (7): 850–866. https://doi.org/10.1108/JMTM-02-2017-0027.
Yang, R. J., and G. Q. Shen. 2015. “Framework for stakeholder management in construction projects.” J. Manage. Eng. 31 (4): 04014064. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000285.
Zhou, Z., Y. M. Goh, and Q. Li. 2015. “Overview and analysis of safety management studies in the construction industry.” Saf. Sci. 72 (Feb): 337–350. https://doi.org/10.1016/j.ssci.2014.10.006.

Information & Authors

Information

Published In

Go to ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Volume 9Issue 3September 2023

History

Received: Sep 29, 2022
Accepted: Feb 9, 2023
Published online: May 23, 2023
Published in print: Sep 1, 2023
Discussion open until: Oct 23, 2023

Permissions

Request permissions for this article.

ASCE Technical Topics:

Authors

Affiliations

Ph.D. Candidate, Centre for Risk Research, Univ. of Southampton, University Rd., Highfield, Southampton SO17 1BJ (corresponding author). ORCID: https://orcid.org/0000-0001-5870-0323. Email: [email protected]
Mario Brito [email protected]
Professor and Chair, Centre for Risk Research, Univ. of Southampton, University Rd., Highfield, Southampton SO17 1BJ. Email: [email protected]
Professor and Director, Southampton Business School, Univ. of Southampton, University Rd., Highfield, Southampton SO17 1BJ. ORCID: https://orcid.org/0000-0001-5899-304X. Email: [email protected]
Associate Professor, School of Business Administration, American Univ. of Sharjah, University City–Sharjah, United Arab Emirates. ORCID: https://orcid.org/0000-0001-6648-3306. Email: [email protected]
Professor and Chair, Dept. of Civil, Structural and Environmental Engineering, Trinity College Dublin, Univ. of Dublin, College Green, Dublin D02 PN40, Ireland. ORCID: https://orcid.org/0000-0001-6391-5484. Email: [email protected]
P.E.
Professor and Director, Center for Technology and Systems Management, Dept. of Civil and Environmental Engineering, Univ. of Maryland, College Park, MD 20742. ORCID: https://orcid.org/0000-0003-2692-241X. Email: [email protected]
Albert P. C. Chan, Ph.D. [email protected]
Chair Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Block Z, 181 Chatham Rd. South, Hung Hom, Kowloon, Hong Kong. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Review of studies on risk factors in critical infrastructure projects from 2011 to 2023, Smart and Sustainable Built Environment, 10.1108/SASBE-09-2023-0285, (2024).
  • A Synthesis of Literature on the Effects of COVID-19 on Construction Industry, Practice Periodical on Structural Design and Construction, 10.1061/PPSCFX.SCENG-1466, 29, 3, (2024).
  • Construction Risk Management in Iraq during the COVID-19 Pandemic: Challenges to Implementation and Efficacy of Practices, Journal of Construction Engineering and Management, 10.1061/JCEMD4.COENG-13099, 149, 9, (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share