Risk Assessment of Bridge Construction Safety Considering Multi-Information Fusion
Publication: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
Volume 8, Issue 4
Abstract
Due to the rapid development in the number of bridges worldwide, risk assessment has gradually been an important step to evaluate the safety of bridge construction. However, the assessment results are usually affected by the subjectivity and individual preference of the bridge experts. In this paper, an innovative bridge construction risk assessment algorithm considering multi-information fusion is proposed based on cluster analysis, set-valued statistic, and entropy method. First, the weight of each individual expert is obtained by adopting cluster analysis to reduce the influence of individual bias from experts. Second, the index weight considering importance-based and condition-based information fusion is achieved based on the minimum cross-entropy principle. The importance-based weight of each index is achieved by the fall-shadow method based on the set-valued statistic. The condition-based weight of each index is computed using the entropy method with respect to the evaluation results of the indexes. Finally, the fuzzy comprehensive evaluation process is utilized to conduct the assessment from the bottom layer to the target layer inside the hierarchical risk index system; the risk level of the target bridge construction safety and corresponding control principle are achieved based on the risk evaluation criteria. An example risk assessment of the construction stage for a long-span suspension bridge is applied to illustrate the validity of the proposed approach.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
All data, models, or code that support the findings of this study are available from the corresponding author upon reasonable request.
Acknowledgments
The research work was supported in part by the National Natural Science Foundation of China (Grant Nos. 51908503 and 51909236), the Natural Science Foundation of Jiangsu Province (Grant No. BK20200793) and the Natural Science Foundation of Zhejiang Province (Grant No. LGF22E080018). Opinions and findings presented are those of the authors and do not necessarily reflect the views of the sponsors.
References
An, M., C. Baker, and J. Zeng. 2005. “A fuzzy-logic-based approach to qualitative risk modeling in the construction process.” World J. Eng. 2 (1): 1–12. https://doi.org/10.1109/TFUZZ.1993.390281.
Chen, Q., K. Hu, Y. Y. Liu, and B. Chen. 2004. “Appliance of the normal distribution function in the building of the judgment matrix of AHP.” [In Chinese.] Supplement, J. Jilin Univ. (Earth Sci. Ed.) 20 (S1): 152–154. https://doi.org/10.13278/j.cnki.jjuese.2004.s1.031.
Cho, T., J. B. Lee, and S. S. Kim. 2011. “Probabilistic risk assessment for the construction phases of a PSC box girder railway bridge system with six sigma methodology.” KSCE J. Civ. Eng. 15 (1): 119–130. https://doi.org/10.1007/s12205-011-0675-1.
Deng, L., W. Wang, and Y. Yu. 2016. “State-of-the-art review on the causes and mechanisms of bridge collapse.” J. Perform. Constr. Facil. 30 (2): 04015005. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000731.
Diaz, E. E. M., F. N. Moreno, and J. Mohammadi. 2009. “Investigation of common causes of bridge collapse in Colombia.” Pract. Period. Struct. Des. Constr. 14 (4): 194–200. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000006.
Drösler, J. 2000. “An n-dimensional Weber law and the corresponding Fechner law.” J. Math. Psychol. 44 (2): 330–335. https://doi.org/10.1006/jmps.1999.1242.
Faber, M. H., and M. G. Stewart. 2003. “Risk assessment for civil engineering facilities: Critical overview and discussion.” Reliab. Eng. Syst. Saf. 80 (2):173–184. https://doi.org/10.1016/S0951-8320(03)00027-9.
Gao, J., R. He, and D. Wang. 2010. “Flood risk assessment on pipeline bridge based on the analytic hierarchy process (AHP).” Nat. Gas Ind. 30 (2): 106–109. https://doi.org/10.1016/S1876-3804(11)60008-6.
Hashemi, H., S. M. Mousavi, and S. M. H. Mojtahedi. 2011. “Bootstrap technique for risk analysis with interval numbers in bridge construction projects.” J. Constr. Eng. Manage. 137 (8): 600–608. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000344.
Huang, R., K. Peng, and W. Zhou. 2018. “Study on risk assessment of bridge construction based on AHP-GST method.” IOP Conf. Ser.: Earth Environ. Sci. 189 (4): 042017. https://doi.org/10.1088/1755-1315/189/4/042017.
Ishizaka, A., and A. Labib. 2011. “Review of the main developments in the analytic hierarchy process.” Expert Syst. Appl. 38 (11): 14336–14345. https://doi.org/10.1016/j.eswa.2011.04.143.
Koulinas, G. K., O. E. Demesouka, K. A. Sidas, and D. E. Koulouriotis. 2021. “A TOPSIS—risk matrix and Monte Carlo expert system for risk assessment in engineering projects.” Sustainability 13 (20): 11277. https://doi.org/10.3390/su132011277.
Lebeau, K. H., and S. J. Wadia-Fascetti. 2007. “Fault tree analysis of Schoharie creek bridge collapse.” J. Perform. Constr. Facil. 21 (4): 320–326. https://doi.org/10.1061/(ASCE)0887-3828(2007)21:4(320).
Lu, M., J. Guan, C. Xiong, and J. Z. Zhao. 2020. “Evaluation of black-start scheme based on risk utility function.” Int. J. Electr. Power Energy Syst. 121 (Oct): 106082. https://doi.org/10.1016/j.ijepes.2020.106082.
Maeda, H., and S. Murakami. 1993. “The use of fuzzy decision-making method in a large-scale computer system choice problem.” Fuzzy Sets Syst. 54 (3): 235–249. https://doi.org/10.1016/0165-0114(93)90369-S.
MOT (Ministry of Transport of the People’s Republic of China). 2021. “Transportation development report in 2020.” [In Chinese.] Jilin Sci. Technol. Commun. 2 (000019713O04/2021-00094): 40–46.
Pan, N. F. 2008. “Fuzzy AHP approach for selecting the suitable bridge construction method.” Autom. Constr. 17 (8): 958–965. https://doi.org/10.1016/j.autcon.2008.03.005.
Pan, X. D., W. Jiang, and B. Qian. 2012. “Construction risk assessment research of continual rigid frame bridge with concrete-filled steel high piers.” Appl. Mech. Mater. 193–194 (Aug): 1174–1178. https://doi.org/10.4028/www.scientific.net/AMM.193-194.1174.
Pang, Q. 2009. “A model of risk assessment of software project based on grey theory.” In Proc., Int. Conf. on Computer Science & Education. New York: IEEE. https://doi.org/10.1109/ICCSE.2009.5228371.
Peris-Sayol, G., I. Paya-Zaforteza, S. Balasch-Parisi, and J. Alós-Moya. 2017. “Detailed analysis of the causes of bridge fires and their associated damage levels.” J. Perform. Constr. Facil. 31 (3): 04016108. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000977.
Puckett, J., and R. M. Barker. 1997. Design of highway bridges: Based on AASHTO LRFD, bridge design specifications. New York: Wiley.
Shin, D. W., Y. Shin, and G. H. Kim. 2016. “Comparison of risk assessment for a nuclear power plant construction project based on analytic hierarchy process and fuzzy analytic hierarchy process.” J. Build. Constr. Plann. Res. 4 (3): 157–171. https://doi.org/10.4236/jbcpr.2016.43010.
Sun, B., and R. C. Xiao. 2015. “Bridge fire risk assessment system based on analysis hierarchy process-fuzzy comprehensive evaluation method.” [In Chinese.] J. Tongji Univ. (Nat. Sci.) 43 (11): 1619–1625. https://doi.org/10.11908/j.issn.0253-374x.2015.11.002.
Wang, F., H. X. Wu, and R. X. Zhao. 2020a. “Causes and lessons of bridge collapse accidents in recent three years at home and abroad.” [In Chinese.] Urban Road Bridge Flood Control 7: 73–76.
Wang, J., Z. He, and W. Weng. 2020b. “A review of the research into the relations between hazards in multi-hazard risk analysis.” Nat. Hazards 104 (3): 2003–2026. https://doi.org/10.1007/s11069-020-04259-3.
Wang, W. D., J. Guo, L. G. Fang, and X. S. Chang. 2012. “A subjective and objective integrated weighting method for landslides susceptibility mapping based on GIS.” Environ. Earth Sci. 65 (6): 1705–1714. https://doi.org/10.1007/s12665-011-1148-z.
Wardhana, K., and F. C. Hadipriono. 2003. “Analysis of recent bridge failures in the United States.” J. Perform. Constr. Facil. 17 (3): 124–135. https://doi.org/10.1061/(ASCE)0887-3828(2003)17:3(144).
Xiang, Y. Q., Q. Q. Wu, and T. T. Zhang. 2010. “The risk assessment of bridge design based on the AHP-FCE model.” [In Chinese.] Supplement, China Civ. Eng. J. 43 (S2): 275–280. https://doi.org/10.15951/j.tmgcxb.2010.s2.017.
Xu, F. Y., M. J. Zhang, L. Wang, and J. R. Zhang. 2016. “Recent highway bridge collapses in China: Review and discussion.” J. Perform. Constr. Facil. 30 (5): 04016030. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000884.
Yang, Y. L., H. X. Tai, and T. Shi. 2012. “Weighting indicators of building energy efficiency assessment taking account of experts’ priority.” J. Cent. South Univ. 19 (3): 803–808. https://doi.org/10.1007/s11771-012-1075-5.
Yin, Z. H., Y. F. Li, and Y. Li. 2011. “Probability analysis and risk assessment about vessel-bridge collision of Xihoumen bridge.” Adv. Mater. Res. 179–180 (Jan): 464–469. https://doi.org/10.4028/www.scientific.net/AMR.179-180.464.
Zadeh, L. A. 1965. “Fuzzy sets.” Inf. Control 8 (3): 338–353. https://doi.org/10.1016/S0019-9958(65)90241-X.
Zhang, H., C. L. Gu, L. W. Gu, and Y. Zhang. 2011. “The evaluation of tourism destination competitiveness by TOPSIS & information entropy—A case in the Yangtze river delta of China.” Tourism Manage. 32 (2): 443–451. https://doi.org/10.1016/j.tourman.2010.02.007.
Zhang, X. G. 2010. Guide for safety risk assessment of highway bridge and tunnel engineering design. [In Chinese.] Beijing: China Communications Press.
Zhang, Z., M. Na, and Z. Peng. 2012. “Based on the fuzzy set-valued statistics and the fuzzy mathematics theory in air traffic control system safety appraisal application.” Phys. Procedia 33 (Jan): 511–520. https://doi.org/10.1016/j.phpro.2012.05.097.
Zhou, X., F. M. Zhang, X. B. Hui, and K. W. Li. 2011. “Group decision-making method based on entropy and experts cluster analysis.” J. Syst. Eng. Electron. 22 (3): 468. https://doi.org/10.3969/j.issn.1004-4132.2011.03.015.
Zuo, S., G. Chen, D. Yong, and X. Wang. 2011. “A subjective trust model based on fuzzy neartude.” In Proc., Int. Conf. on Network Computing and Information Security, 369–373. New York: IEEE. https://doi.org/10.1109/NCIS.2011.81.
Information & Authors
Information
Published In
Copyright
© 2022 American Society of Civil Engineers.
History
Received: Jan 8, 2022
Accepted: May 27, 2022
Published online: Aug 5, 2022
Published in print: Dec 1, 2022
Discussion open until: Jan 5, 2023
ASCE Technical Topics:
- Bridge tests
- Buildings
- Business management
- Construction engineering
- Construction industry
- Construction management
- Construction methods
- Disaster risk management
- Engineering fundamentals
- Engineering mechanics
- Entropy methods
- Field tests
- High-rise buildings
- Infrastructure construction
- Mathematics
- Occupational safety
- Practice and Profession
- Public administration
- Public health and safety
- Risk management
- Safety
- Statistics
- Structural engineering
- Structures (by type)
- Tests (by type)
- Thermodynamics
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
- Xiantao Qin, Xianlai Zha, Zhongheng Wu, Lei Zhang, Grey Fuzzy Comprehensive Evaluation of Bridge Risk during Periods of Operation Based on a Combination Weighting Method, Applied Sciences, 10.3390/app13158964, 13, 15, (8964), (2023).
- Bo Sun, Hangkai Zhou, Wensen Cao, Weimin Chen, Bin Chen, Yizhou Zhuang, Vertical and Horizontal Combined Algorithm for Missing Data Imputation in Bridge Health Monitoring System, Journal of Bridge Engineering, 10.1061/JBENF2.BEENG-5996, 28, 6, (2023).