Technical Papers
Apr 28, 2022

Linking BIM Definition, BIM Capability Maturity, and Integrated Project Delivery in the AECO Industry: The Influences of BIM Diffusion and Moral Hazard

Publication: Journal of Urban Planning and Development
Volume 148, Issue 3

Abstract

Based on an increasing amount of attention paid to explore why building information modeling (BIM) application levels are so low and what are the obstacles that hinder the further application of BIM, a range of existing studies began to explore BIM from different research perspectives. However, these studies only focus on a single perspective to explore this issue in isolation, ignoring the correlation between them. Therefore, by reviewing the hot perspectives of in-depth discussion on this issue in the existing literature, the present study focuses on exploring the quantitative relationships between BIM definition, BIM capability maturity, integrated project delivery (IPD), BIM diffusion, and moral hazard. Structural equation modeling (SEM) was conducted using data from 295 questionnaires to empirically verify our research model. The results show that the perfection of BIM technology, BIM process, and BIM policy have a positive association with BIM capability maturity. In addition, these three factors can be used as mediating variables to affect the relationship between the other two factors and BIM capability maturity. Moreover, BIM capability maturity has a positive impact on the realization of IPD. Specifically, BIM diffusion was found to positively moderate the relationship between BIM capability maturity and the realization of IPD, while moral hazard plays a negatively moderating role. The findings of this research contribute to lay a theoretical foundation for discussing how to improve BIM capability maturity from the perspective of BIM definition, as well as the influence of BIM capability maturity and BIM-related promotion and hindrance factors on IPD, an ideal project transaction model. Understanding these in-depth underlying interrelations can contribute to fully realizing the real implementation of BIM and improve the acceptance of IPD, and ultimately realize the transformation and upgrading of the Architecture, Engineering, Construction, and Operations industry and the construction of smart cities.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This research study was supported by the National Social Science Fund (Grant No. 17BGL156): research on the socialized supervision mechanism of market subjects in the engineering construction.

References

Aboushal, E. A. 2021. “Regenerative design of a defined urban space using CityGML model.” J. Urban Plann. Dev. 147 (3): 04021035. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000723.
Anderson, J. C., and D. W. Gerbing. 1988. “Structural equation modeling in practice: A review and recommended two-step approach.” Psychol. Bull. 103 (3): 411–423. https://doi.org/10.1037/00332909.103.3.411.
Bagozzi, R. P., and Y. Yi. 1988. “On the evaluation of structural equation models.” J. Acad. Mark. Sci. 16: 74–94. https://doi.org/10.1007/BF02723327.
Bagozzi, R. P., and Y. Yi. 1989. “On the use of structural equation models in experimental designs.” J. Mark. Res. 26 (3): 271–284. https://doi.org/10.2307/3172900.
Battarra, R., C. Gargiulo, and F. Zucaro. 2020. “Future possibility of smart and sustainable cities in the Mediterranean basin.” J. Urban Plann. Dev. 146 (4): 04020036. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000610.
Baumgartner, H., and C. Homburg. 1996. “Applications of structural equation modeling in marketing and consumer research: A review.” Int. J. Res. Mark. 13 (2): 139–161. https://doi.org/10.1016/0167-8116(95)00038-0.
Bryde, D., M. Broquetas, and J. M. Volm. 2013. “The project benefits of Building Information Modelling (BIM).” Int. J. Project Manage. 31 (7): 971–980. https://doi.org/10.1016/j.ijproman.2012.12.001.
Camerer, C. 2003. Behavioral game theory: Experiments in strategic interaction. Princeton, NJ: Princeton University Press.
Cerovsek, T. 2011. “A review and outlook for a “Building Information Model” (BIM): A multi-standpoint framework for technological development.” Adv. Eng. Inf. 25 (2): 224–244. https://doi.org/10.1016/j.aei.2010.06.003.
Chang, C. Y. 2014. “Principal-agent model of risk allocation in construction contracts and its critique.” J. Constr. Eng. Manage. 140 (1): 04013032. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000779.
Chang, C.-Y., W. Pan, and R. Howard. 2017. “Impact of building information modeling implementation on the acceptance of integrated delivery systems: Structural equation modeling analysis.” J. Constr. Eng. Manage. 143 (8): 4017044. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001335.
Chen, Y., Y. Yin, G. J. Browne, and D. Li. 2019. “Adoption of building information modeling in Chinese construction industry: The technology-organization-environment framework.” Eng. Constr. Archit. Manag. 26 (9): 1878–1898. https://doi.org/10.1108/ECAM-11-2017-0246.
Cheng, J. C., and Q. Lu. 2015. “A review of the efforts and roles of the public sector for BIM adoption worldwide.” Electron. J. Inf. Technol. Constr. 20 (27): 442–478.
Chin, W. W., B. L. Marcolin, and P. R. Newsted. 2003. “A partial least squares latent variable modeling approach for measuring interaction effects: Results from a monte carlo simulation study and an electronic-mail emotion/adoption study. Inf. Syst. Res. 14 (2): 189–217. https://doi.org/10.1287/isre.14.2.189.16018.
Chin, W. W., and P. A. Todd. 1995. “On the use, usefulness, and ease of use of structural equation modeling in MIS research: A note of caution.” MIS Q. 19 (2): 237–246. https://doi.org/10.2307/249690.
Chong, H.-Y., S.-L. Fan, M. Sutrisna, S.-H. Hsieh, and C.-M. Tsai. 2017. “Preliminary contractual framework for BIM-enabled projects.” J. Constr. Eng. Manage. 143 (7): 04017025. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001278.
Du, Y., H. Zhou, Y. Yuan, and H. Xue. 2019. “Exploring the moral hazard evolutionary mechanism for BIM implementation in an integrated project team.” Sustainability 11 (20): 5719. https://doi.org/10.3390/su11205719.
Fornell, C., and D. F. Larcker. 1981. “Evaluating structural equation models with unobservable variables and measurement error.” J. Mark. Res. 18 (1): 39–50. https://doi.org/10.2307/3151312.
Gintis, H. 2009. The bounds of reason: Game theory and the unification of the behavioral sciences. Princeton, NJ: Princeton University Press.
Gu, N., and K. London. 2010. “Understanding and facilitating BIM adoption in the AEC industry.” Autom. Constr. 19 (8): 988–999. https://doi.org/10.1016/j.autcon.2010.09.002.
Guan, J., and W. You. 2019. “Research on project management maturity model of construction enterprise.” Project Manage. Technol. 17 (5): 62–70.
Guo, S. Y., and Y. F. Chen. 2018. “Simplification method of information modeling in the building project operation and maintenance stage.” J. Graph. 39 (1): 123–128.
Hair, J., W. Black, B. Babin, R. Anderson, and R. Tatham. 2006. Multivariate data analysis. 6th ed. Upper Saddle River, NJ: Prentice Hall.
Hair, J. F., R. E. Anderson, R. L. Thatam, and W. C. Black. 1998. Multivariate data analysis. 5th ed. Upper Saddle River, NJ: Prentice Hall.
Hair, J. F., M. Sarstedt, C. M. Ringle, and J. A. Mena. 2012. “An assessment of the use of partial least squares structural equation modeling in marketing research.” J. Acad. Mark. Sci. 40 (3): 414–433. https://doi.org/10.1007/s11747-011-0261-6.
Hess, C., and E. Ostrom. 2003. “Ideas, artifacts, and facilities: Information as a common-pool resource.” Law Contemp. Probl. 66 (1): 111–145. https://doi.org/10.2307/20059174.
Holmstrom, B. 1979. “Moral hazard and observability.” Bell. J. Econ. 10 (1): 74–91.
Hossain, M. A., and D. K. H. Chua. 2013. “Overlapping design and construction activities and an optimization approach to minimize rework.” Int. J. Project Manage. 32 (6): 983–994. https://doi.org/10.1016/j.ijproman.2013.10.019.
Howard, R., L. Restrepo, and C. Y. Chang. 2017. “Addressing individual perceptions: An application of the unified theory of acceptance and use of technology to building information modelling.” Int. J. Project Manage. 35 (2): 107–120. https://doi.org/ 10.1016/j.ijproman.2016.10.012.
Iker, Z., S. Alessandro, and A. Saioa. 2016. “Smart city concept: What it is and what it should be.” J. Urban Plann. Dev. 142 (1): 04015005. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000282.
Jiang, L., G. Yu, Y. Li, and F. Li. 2010. “Perceived colleagues’ safety knowledge/behavior and safety performance: Safety climate as a moderator in a multilevel study.” Accid. Anal. Prev. 42 (5): 1468–1476. https://doi.org/10.1016/j.aap.2009.08.017.
Kassem, M., and B. Succar. 2017. “Macro BIM adoption: Comparative market analysis.” Autom. Constr. 81: 286–299. https://doi.org/10.1016/j.autcon.2017.04.005.
Kent, D. C., and B. Becerik-Gerber. 2010. “Understanding construction industry experience and attitudes toward integrated project delivery.” J. Constr. Eng. Manage. 136 (8): 815–825. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000188.
Krosnick, J. A., and S. Presser. 2010. Handbook of survey research: Question and questionnaire design. 2nd ed. Bingley, UK: Emerald Group Publishing.
Liang, H., N. Saraf, and Q. Hu. 2007. “Assimilation of enterprise systems: The effect of institutional pressures and the mediating role of top management.” MIS Q. 31 (1): 59–87. https://doi.org/10.2307/25148781.
Lindell, M. K., and D. J. Whitney. 2001. “Accounting for common method variance in cross-sectional research design.” J. Appl. Psychol. 86 (1): 114–121. https://doi.org/10.1037//0021-9010.86.1.114.
Liu, Y. P., H. Wang, and G.-H. Tzeng. 2018. “From measure to guidance: Galactic model and sustainable development planning toward the best smart city.” J. Urban Plann. Dev. 144 (4): 04018035. https://doi.org/10.1061/(ASCE)UP.1943-5444.0000478.
Ma, J. K., Z. L. Ma, and J. L. Li. 2017. “An IPD-based incentive mechanism to eliminate change orders in construction projects in China.” KSCE. J. Civ. Eng. 21 (7): 2538–2550. https://doi.org/10.1007/s12205-017-0957-3.
Ma, Z. L., D. D. Zhang, and J. K. Ma. 2014. “BIM-based collaborative work model and information utilization framework for IPD projects.” J. Tongji Univ. 42 (9): 1325–1332.
Marsh, H. W., J. R. Balla, and R. P. McDonald. 1988. “Goodness-of-fit indexes in confirmatory factor analysis: The effect of sample size.” Psychol. Bull. 103 (3): 391–410. https://doi.org/10.1037/0033-2909.103.3.391.
Marsh, H. W., and D. Hocevar. 1985. “Application of confirmatory factor analysis to the study of self-concept: First- and higher order factor models and their invariance across groups.” Psychol. Bull. 97 (3): 562–582. https://doi.org/10.1037/0033-2909.97.3.562.
Marzouk, M., and A. Othman. 2020. “Planning utility infrastructure requirements for smart cities using the integration between BIM and GIS.” Sustainable Cities Soc. 57: 102120. https://doi.org/10.1016/j.scs.2020.102120.
Mccuen, T. L., P. C. Suermann, and M. J. Krogulecki. 2012. “Evaluating award-winning BIM projects using the national building information model standard capability maturity model.” J. Manage. Eng. 28 (2): 224–230. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000062.
Mei, T. T., Q. K. Wang, Y. P. Xiao, and M. Yang. 2017. “Rent-seeking behavior of BIM & IPD-based construction project in China.” Eng. Constr. Archit. Manag. 24 (3): 514–536. https://doi.org/10.1108/ECAM-11-2015-0178.
Mesa, H. A., K. R. Molenaar, and L. F. Alarcón. 2019. “Comparative analysis between integrated project delivery and lean project delivery.” Int. J. Project Manage. 37 (3): 395–409. https://doi.org/10.1016/j.ijproman.2019.01.012.
Miettinen, R., and S. Paavola. 2014. “Beyond the BIM utopia: Approaches to the development and implementation of building information modeling.” Autom. Constr. 43: 84–91. https://doi.org/10.1016/j.autcon.2014.03.009.
Murphy, M. E. 2014. “Implementing innovation: A stakeholder competency-based approach for BIM.” Constr. Innov. 14 (4): 433–452. https://doi.org/10.1108/CI-01-2014-0011.
NBS (National Building Specification). 2017. National BIM report 2017. Newcastle upon Tyne, UK: NBS National BIM Library.
NIST (National Institute of Standards and Technology). 2007. National building information modeling standard. Washington, DC: US Dept. of Commerce.
Nunnally, J., and I. Bernstein. 1994. Psychological methods. New York: McGraw-Hill.
Olatunji, O. A. 2011. “Modelling the costs of corporate implementation of building information modelling.” J. Financ. Manage. Prop. Constr. 16 (3): 211–231. https://doi.org/10.1108/13664381111179206.
Peterson, F., T. Hartmann, R. Fruchter, and M. Fischer. 2011. “Teaching construction project management with BIM support: Experience and lessons learned.” Autom. Constr. 20 (2): 115–125. https://doi.org/10.1016/j.autcon.2010.09.009.
Piroozfar, P., E. R. P. Farr, A. H. M. Zadeh, S. T. Inacio, S. Kilgallon, and R. Jin. 2019. “Facilitating building information modelling (BIM) using integrated project delivery (IPD): A UK perspective.” J. Build. Eng. 26: 100907. https://doi.org/10.1016/j.jobe.2019.100907.
Podsakoff, P. M., S. B. MacKenzie, J.-Y. Lee, and N. P. Podsakoff. 2003. “Common method biases in behavioral research: A critical review of the literature and recommended remedies.” J. Appl. Psychol. 88 (5): 879–903. https://doi.org/10.1037/0021-9010.88.5.879.
Preacher, K. J., and A. F. Hayes. 2008. “Asymptotic and resampling strategies for assessing and comparing indirect effects in multiple mediator models.” Behav. Res. Methods 40: 879–891. https://doi.org/10.3758/BRM.40.3.879.
Qi, S. J., Y. B. Zhang, and J. J. Wu. 2015. “Study on the influent factors of multi-project management maturity for mega contracting construction enterprises.” J. Huaqiao Univ. 36 (5): 563–568.
Sacks, R., C. Eastman, G. Lee, and P. Teicholz. 2018. BIMHandbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. 3rd ed. Hoboken, NJ: Wiley.
Smith, D. K., and M. Tardif. 2009. Building information modeling: A strategic implementation guide for architects, engineers, constructors, and real estate asset managers. Hoboken, NJ: Wiley.
Succar, B. 2009. “Building information modelling framework: A research and delivery foundation for industry stakeholders.” Autom. Constr. 18 (3): 357–375. https://doi.org/10.1016/j.autcon.2008.10.003.
Succar, B. 2010. “Building information modelling maturity matrix.” In Handbook of Research on Building Information Modelling and Construction Informatics: Concepts and Technologies, edited by J. Underwood and U. Isikdag. Pennsylvania: IGI Publishing.
Succar, B., and M. Kassem. 2015. “Macro-BIM adoption: Conceptual structures.” Autom. Constr. 57: 64–79. https://doi.org/10.1016/j.autcon.2015.04.018.
Succar, B., W. Sher, and A. Williams. 2012. “Measuring BIM performance: Five metrics.” Archit. Eng. Des. Manage. 8 (2): 120–142. https://doi.org/10.1080/17452007.2012.659506.
Succar, B. 2013. “Building information modelling: Conceptual models and a facilitative framework.” Ph.D. thesis, School of Architecture and Built Environment, Univ. of Newcastle.
Succar, B., W. Sher, and A. Williams. 2013. “An integrated approach to BIM competency assessment, acquisition and application.” Autom. Constr. 35: 174–189. https://doi.org/10.1016/j.autcon.2013.05.016.
Tan, T., K. Chen, F. Xue, and W. Lu. 2019. “Barriers to Building Information Modeling (BIM) implementation in China’s prefabricated construction: An interpretive structural modeling (ISM) approach.” J. Cleaner Prod. 219: 949–959. https://doi.org/10.1016/j.jclepro.2019.02.141.
Taylor, A. B., D. P. MacKinnon, and J.-Y. Tein. 2008. “Tests of the three-path mediated effect.” Organ. Res. Methods 11 (2): 241–269. https://doi.org/10.1177/1094428107300344.
Travaglini, A., M. Radujković, and M. Mancini. 2014. “Building information modelling (BIM) and project management: A stakeholders perspective.” Organ. Technol. Manage. Constr. 6 (2): 1058–1065. https://doi.org/10.5592/otmcj.2014.2.8.
Walker, D. 2018. “Integrating project delivery.” Int. J. Manag. Project Bus. 11 (2): 548–554. https://doi.org/10.1108/IJMPB-05-2018-166.
Willians, L. J., and B. K. Brown. 1994. “Method variance in organizational behavior and human resources research: Effects on correlations, path coefficients, and hypothesis testing.” Organ. Behav. Hum. Decis. Process. 57 (2): 185–209. https://doi.org/10.1006/obhd.1994.1011.
Won, J. S., and G. Lee. 2016. “How to tell if a BIM project is successful: A goal-driven approach.” Autom. Constr. 69: 34–43. https://doi.org/10.1016/j.autcon.2016.05.022.
Yang, Q., B. L. Pasian, D. Y. Li, and Y. K. Li. 2013. “Review on project management maturity in construction management field.” J. Eng. Manage. 27 (6): 65–70.
Yilmaz, G., A. Akcamete, and O. Demirors. 2019. “A reference model for BIM capability assessments.” Autom. Constr. 101: 245–263. https://doi.org/10.1016/j.autcon.2018.10.022.
Zheng, L., W. S. Lu, K. Chen, K. W. Chau, and Y. Niu. 2017. “Benefit sharing for BIM implementation: Tackling the moral hazard dilemma in inter-firm cooperation.” Int. J. Project Manage. 35 (3): 393–405. https://doi.org/10.1016/j.ijproman.2017.01.006.

Information & Authors

Information

Published In

Go to Journal of Urban Planning and Development
Journal of Urban Planning and Development
Volume 148Issue 3September 2022

History

Received: Jun 29, 2021
Accepted: Jan 10, 2022
Published online: Apr 28, 2022
Published in print: Sep 1, 2022
Discussion open until: Sep 28, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Candidate, Business School, Hohai Univ., Nanjing, Jiangsu 211100, P.R. China (corresponding author). ORCID: https://orcid.org/0000-0002-4320-2249. Email: [email protected]
Jingchun Feng [email protected]
Professor, Business School, Hohai Univ., Nanjing, Jiangsu 211100, P.R. China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Applicability of Integrated Project Delivery Principles Based on a Measurement Model in China, Sustainability, 10.3390/su15021592, 15, 2, (1592), (2023).
  • Modeling and optimization of concurrent execution process of coupled design-construction tasks under design-build mode, Concurrent Engineering, 10.1177/1063293X221117865, 30, 4, (353-366), (2022).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share