Technical Papers
Jul 5, 2022

Normalizing White-Collar Wrongdoing in Professional Service Firms

Publication: Journal of Management in Engineering
Volume 38, Issue 5

Abstract

There is extensive literature on top managers committing wrongdoing, but few studies examine white-collar wrongdoing. Drawing on the experiences of a professional service firm, we examine why and how engineering consultants normalize wrongdoing. Leveraging bounded rationality theory, we find that organizational myopia promotes inadequate administrative systems that hold consultants prisoner to their rules and procedures, leading to normalized wrongdoing. Our theoretical contributions are threefold: (1) we contribute to the literature on wrongdoing, presenting the relation between organizational myopia and normalized wrongdoing, (2) we contribute to the administrative systems literature, showing their link with poor project performance, and (3) we show how administrative systems and normalized wrongdoing play a role in project scope creep. We introduce an iceberg model to show that the failed project (the tip of the iceberg) is due to organizational myopia and inefficient administrative systems that need to be addressed before starting any project.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code generated or used during the study are proprietary or confidential in nature and may only be provided with restrictions. Descriptive data referring to project performance are available from the corresponding author upon request.

Acknowledgments

We would like to thank Yazan Alzubi, Professor Peter Love, and Dr. Tristano Sainati for their generous time reviewing earlier versions of this paper. We also thank the members of EURAM and the Bartlett School of Sustainable Construction for their feedback. We are thankful to the PSF and its staff for providing us data access. Finally, we are grateful to editor Dr. Kwak, the associate editor, and two anonymous reviewers for their constructive feedback.

References

Aizaz, F., S. U. R. Khan, J. A. Khan, and A. Akhunzada. 2021. “An empirical investigation of factors causing scope creep in agile global software development context: A conceptual model for project managers.” IEEE Access 9 (Jul): 109166–109195. https://doi.org/10.1109/ACCESS.2021.3100779.
Ajmal, M., M. Khan, and H. Al-Yafei. 2020. “Exploring factors behind project scope creep—Stakeholders’ perspective.” Int. J. Managing Projects Bus. 13 (3): 483–504. https://doi.org/10.1108/IJMPB-10-2018-0228.
Alvehus, J. 2018. “Conflicting logics? The role of HRM in a professional service firm.” Hum. Resour. Manage. J. 28 (1): 31–44. https://doi.org/10.1111/1748-8583.12159.
Bos-De Vos, M., B. M. Lieftink, and K. Lauche. 2019a. “How to claim what is mine: Negotiating professional roles in inter-organizational projects.” J. Professions Organ. 6 (2): 128–155. https://doi.org/10.1093/jpo/joz004.
Bos-De Vos, M., L. Volker, and H. Wamelink. 2019b. “Enhancing value capture by managing risks of value slippage in and across projects.” Int. J. Project Manage. 37 (5): 767–783. https://doi.org/10.1016/j.ijproman.2018.12.007.
Bos-De Vos, M., J. W. F. H. Wamelink, and L. Volker. 2016. “Trade-offs in the value capture of architectural firms: The significance of professional value.” Construct. Manage. Econ. 34 (1): 21–34. https://doi.org/10.1080/01446193.2016.1177192.
Busby, J. S., and M. Iszatt-White. 2016. “Rationalizing violation: Ordered accounts of intentionality in the breaking of safety rules.” Organ. Stud. 37 (1): 35–53. https://doi.org/10.1177/0170840615593590.
Cheung, S. O., K. Li, and O. Y. Chow. 2020. “Reactive devaluation as a psychological impediment to construction dispute negotiation.” J. Manage. Eng. 36 (4): 04020025. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000787.
Chikudate, N. 2015. Collective myopia in Japanese organizations: A transcultural approach for identifying corporate meltdowns. New York: Springer.
Denicol, J., A. Davies, and I. Krystallis. 2020. “What are the causes and cures of poor megaproject performance? A systematic literature review and research agenda.” Project Manage. J. 51 (3): 328–345. https://doi.org/10.1177/8756972819896113.
Flyvbjerg, B. 2008. “Curbing optimism bias and strategic misrepresentation in planning: Reference class forecasting in practice.” Eur. Plann. Stud. 16 (1): 3–21. https://doi.org/10.1080/09654310701747936.
Flyvbjerg, B., M. Garbuio, and D. Lovallo. 2009. “Deception in large infrastructure projects: Two models for explaining and preventing executive disaster.” Calif. Manage. Rev. 51 (2): 170–194. https://doi.org/10.2307/41166485.
Gransberg, D. D. 2020. “Does low bid award facilitate wrongdoing? US implications of Quebec’s Charbonneau commission report.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 03719004. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000357.
Haaskjold, H., B. Andersen, and J. A. Langlo. 2021. “Dissecting the project anatomy: Understanding the cost of managing construction projects.” In Production planning & control, 1–22. Oxfordshire, UK: Taylor & Francis.
Kerzner, H. 2017. Project management: A systems approach to planning, scheduling, and controlling. New York: Wiley.
Komal, B., U. I. Janjua, F. Anwar, T. M. Madni, M. F. Cheema, M. N. Malik, and A. R. Shahid. 2020. “The impact of scope creep on project success: An empirical investigation.” IEEE Access 8 (Jul): 125755–125775. https://doi.org/10.1109/ACCESS.2020.3007098.
Krystallis, I., G. Locatelli, and N. Murtagh. 2020. “Talking about futureproofing: Real options reasoning in complex infrastructure projects.” IEEE Trans. Eng. Manage. (Oct): 1–14. https://doi.org/10.1109/TEM.2020.3026454.
Krystallis, I., G. Locatelli, and N. Murtagh. 2021. “Futureproofing complex infrastructure projects using real options.” IEEE Eng. Manage. Rev. 49 (1): 127–132. https://doi.org/10.1109/EMR.2020.3036446.
Lee, C. J., R. Wang, C. Y. Lee, C. C. Hung, and S. C. Hsu. 2018. “Board structure and directors’ role in preventing corporate misconduct in the construction industry.” J. Manage. Eng. 34 (2): 04017067. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000593.
Lehtinen, J., G. Locatelli, T. Sainati, K. Artto, and B. Evans. 2022. “The grand challenge: Effective anti-corruption measures in projects.” Int. J. Project Manage. 40 (4): 347–361. https://doi.org/10.1016/J.IJPROMAN.2022.04.003.
Lenfle, S., and C. Loch. 2010. “Lost roots: How project management came to emphasize control over flexibility and novelty.” Calif. Manage. Rev. 53 (1): 32–55. https://doi.org/10.1525/cmr.2010.53.1.32.
Locke, K., M. Feldman, and K. Golden-Biddle. 2020. “Coding practices and iterativity: Beyond templates for analyzing qualitative data.” In Organizational research methods. Los Angeles, CA: SAGE. https://doi.org/10.1177/1094428120948600.
Love, P. E. D., L. A. Ika, J. Matthews, and W. Fang. 2021. “Risk and uncertainty in the cost contingency of transport projects: Accommodating bias or heuristics, or both?” IEEE Trans. Eng. Manage. (Oct): 1–15. https://doi.org/10.1109/TEM.2021.3119064.
March, J. G., and H. A. Simon. 1958. Organizations. New York: Wiley.
McGrath, R., and A. Van Putten. 2017. How to set more-realistic growth targets, 1–8. Boston: Harvard Business Review.
Mellahi, K., and D. G. Collings. 2010. “The barriers to effective global talent management: The example of corporate élites in MNEs.” J. World Bus. 45 (2): 143–149. https://doi.org/10.1016/j.jwb.2009.09.018.
Mintzberg, H. 1989. “The structuring of organizations.” In Readings in strategic management, 322–352. New York: Springer.
Morris, P. W. G. 1994. The management of projects. London: T. Telford.
Müller, R., N. Drouin, and S. Sankaran. 2019. “Modeling organizational project management.” Project Manage. J. 50 (4): 499–513. https://doi.org/10.1177/8756972819847876.
Müller, R., J. R. Turner, E. S. Andersen, J. Shao, and Ø. Kvalnes. 2016. “Governance and ethics in temporary organizations: The mediating role of corporate governance.” Project Manage. J. 47 (6): 7–23. https://doi.org/10.1177/875697281604700602.
Müller, R., R. Turner, E. S. Andersen, J. Shao, and Ø. Kvalnes. 2014. “Ethics, trust, and governance in temporary organizations.” Project Manage. J. 45 (4): 39–54. https://doi.org/10.1002/pmj.21432.
Naji, K. K., M. Gunduz, and A. F. Naser. 2021. “An adaptive neurofuzzy inference system for the assessment of change order management performance in construction.” J. Manage. Eng., 38 (2): 04021098. https://doi.org/10.1061/(ASCE)ME.1943-5479.0001017.
Nanda, A., and D. Narayandas. 2021. “What professional service firms must do to thrive.” Harvard Bus. Rev. 99 (2): 98–108.
Neuman, L. W. 2014. Social research methods—Qualitative and quantitative approaches. Harlow, Essex: Pearson Education.
O’Reilly, C. A., and J. A. Chatman. 2020. “Transformational leader or narcissist? How grandiose narcissists can create and destroy organizations and institutions.” Calif. Manage. Rev. 62 (3): 5–27. https://doi.org/10.1177/0008125620914989.
Owusu, E. K., and A. P. C. Chan. 2019. “Barriers affecting effective application of anticorruption measures in infrastructure projects: Disparities between developed and developing countries.” J. Manage. Eng., 35 (1): 04018056. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000667.
Palazzo, G., F. Krings, and U. Hoffrage. 2012. “Ethical blindness.” J. Bus. Ethics 109 (3): 323–338. https://doi.org/10.1007/s10551-011-1130-4.
Palmer, D. 2012. Normal organizational wrongdoing: A critical analysis of theories of misconduct in and by organizations. New York: Oxford University Press.
Palmer, D. 2013. “The new perspective on organizational wrongdoing.” Calif. Manage. Rev. 56 (1): 5–23. https://doi.org/10.1525/cmr.2013.56.1.5.
Palmer, D., K. Smith-Crowe, and R. Greenwood. 2016. “The imbalances and limitations of theory and research on organizational wrongdoing.” In Organizational wrongdoing: Key perspectives and new directions, 1–16. New York: Cambridge University Press.
Perrow, C. 1972. Complex organizations: A critical essay. New York: McGraw-Hill.
Pinto, J. 2014. “Project management, governance, and the normalization of deviance.” Int. J. Project Manage. 32 (3): 376–387. https://doi.org/10.1016/j.ijproman.2013.06.004.
Saldaña, J. 2021. The coding manual for qualitative researchers. Thousand Oaks, CA: SAGE.
Seo, W.; H. Young, M. Kwak, and Y. Kang. 2021. “Relationship between consistency and performance in the claim management process for construction projects.” J. Manage. Eng., 37 (6): 04021068. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000973.
Signor, R., P. E. Love, A. Oliveira, A. O. Lopes, and P. S. Oliveira. 2020a. “Public infrastructure procurement: Detecting collusion in capped first-priced auctions.” J. Infrastruct. Syst. 26 (2): 05020002. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000543.
Signor, R., P. E. D. Love, A. T. N. Belarmino, and O. Alfred Olatunji. 2020b. “Detection of collusive tenders in infrastructure projects: Learning from operation car wash.” J. Constr. Eng. Manage. 146 (1): 05019015. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001737.
Simon, H. A. 1997. Administrative behavior. New York: The Free Press.
Simon, H. A. 2000. “Bounded rationality in social science: Today and tomorrow.” Mind Soc. 1 (1): 25–39. https://doi.org/10.1007/BF02512227.
Smyth, H. 2011. Managing the professional practice: In the built environment. New York: Wiley.
Vaughan, D. 1996. The challenger launch decision: Risky technology, culture, and deviance at NASA. Chicago: Univ. of Chicago Press.
Wang, R., C.-J. Lee, S.-C. Hsu, and C.-Y. Lee. 2018. “Corporate misconduct prediction with support vector machine in the construction industry.” J. Manage. Eng. 34 (4): 04018021. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000630.
Wang, R., C.-J. Lee, S.-C. Hsu, S. Zheng, and J.-H. Chen. 2020. “Effects of career horizon and corporate governance in China’s construction industry: Multilevel study of top management fraud.” J. Manage. Eng. 36 (5): 04020057. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000816.
Wang, X., K. Ye, M. Chen, and Z. Yao. 2021. “A conceptual framework for the inclusion of exogenous factors into collusive bidding price decisions.” J. Manage. Eng. 37 (6): 04021071. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000981.
Weick, K. E., K. M. Sutcliffe, and D. Obstfeld. 2005. “Organizing and the process of sensemaking.” Organ. Sci. 16 (4): 409–421. https://doi.org/10.1287/orsc.1050.0133.
Winch, G., and E. Schneider. 1993a. “Managing the knowledge-based organization: The case of architectural practice.” J. Manage. Stud. 30 (6): 923–937. https://doi.org/10.1111/j.1467-6486.1993.tb00472.x.
Winch, G., and E. Schneider. 1993b. “The strategic management of architectural practice.” Construct. Manage. Econ. 11 (6): 467–473. https://doi.org/10.1080/01446199300000052.
Winch, G. M. 2011. “Internationalisation strategies in business-to-business services: The case of architectural practice.” Serv. Ind. J. 28 (1): 1–13. https://doi.org/10.1080/02642060701725347.
Yin, R. K. 2017. Case study research and applications: Design and methods. Thousand Oaks, CA: SAGE.

Information & Authors

Information

Published In

Go to Journal of Management in Engineering
Journal of Management in Engineering
Volume 38Issue 5September 2022

History

Received: Oct 21, 2021
Accepted: May 7, 2022
Published online: Jul 5, 2022
Published in print: Sep 1, 2022
Discussion open until: Dec 5, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Assistant Professor, Member of the Association for Project Management, Bartlett School of Sustainable Construction, UCL, 1-19 Torrington Place, London WC1E 7HB, UK (corresponding author). ORCID: https://orcid.org/0000-0001-7687-831X. Email: [email protected]
Giorgio Locatelli, Ph.D. [email protected]
Professor, Fellow of the Higher Education Academy, School of Management, Politecnico di Milano, Via Labruschini 4/B, Milano 20156, Italy. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Flexible Infrastructure Design: A Real Options Reasoning Approach to Navigating Uncertainty in Large-Scale Projects, Journal of Management in Engineering, 10.1061/JMENEA.MEENG-5678, 40, 3, (2024).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share