Technical Papers
Sep 28, 2019

Scheduling Infrastructure Renewal for Railway Networks

Publication: Journal of Infrastructure Systems
Volume 25, Issue 4

Abstract

The pressing necessity to renew infrastructure assets in developed railway systems leads to an increased number of activities to be scheduled annually. Scheduling of renewal activities for a railway network is a critical task because these activities often require a significant amount of time and create a capacity conflict in operation scheduling. This paper discusses economic and technological aspects, opportunities, and constraints in the renewals of multiple rail infrastructure components at several locations in a railway network. We addressed and modeled a challenging situation in which there were interrelationships between different track lines, and thus, possession of a track line could affect the other track lines and prevent renewal works on them. A mathematical formulation for the railway infrastructure renewal scheduling problem in the network context was presented to minimize the total renewal and unavailability costs. A method based on a triple-prioritization rule and an optimal sharing of renewal times allocated for different types of rail infrastructure components in a possession is proposed to solve the problem. The method was applied to a real case of a regional railway network in Northern Netherlands and it was shown that up to 13% of total costs can be saved compared with the current scheduling practice.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The work presented in this paper was funded by the Explorail Research Programme, a collaboration of the Netherlands Organization for Scientific Research (NWO), ProRail (the Dutch Railway Agency), and Technology Foundation STW.

References

Andrade, A., and P. F. Teixeira. 2011. “Biobjective optimization model for maintenance and renewal decisions related to rail track geometry.” Transp. Res. Rec. 2261 (1): 163–170. https://doi.org/10.3141/2261-19.
Argyropoulou, K., C. Iliopoulou, and K. Kepaptsoglou. 2019. “Model for corrective maintenance scheduling of rail transit networks: Application to Athens metro.” J. Infrastruct. Syst. 25 (1): 04018035. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000457.
ASCE. 2017. “2017 infrastructure report card: Rail.” Accessed April 16, 2018. https://www.infrastructurereportcard.org/cat-item/rail/.
Budai, G., D. Huisman, and R. Dekker. 2006. “Scheduling preventive railway maintenance activities.” J. Oper. Res. Soc. 57 (9): 1035–1044. https://doi.org/10.1057/palgrave.jors.2602085.
Burkhalter, M., C. Martani, and B. T. Adey. 2018. “Determination of risk-reducing intervention programs for railway lines and the significance of simplifications.” J. Infrastruct. Syst. 24 (1): 04017038. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000401.
Caetano, L. F., and P. F. Teixeira. 2013. “Availability approach to optimizing railway track renewal operations.” J. Transp. Eng. 139 (9): 941–948. https://doi.org/10.1061/(ASCE)TE.1943-5436.0000575.
Caetano, L. F., and P. F. Teixeira. 2015. “Optimisation model to schedule railway track renewal operations: A life-cycle cost approach.” Struct. Infrastruct. Eng. 11 (11): 1524–1536. https://doi.org/10.1080/15732479.2014.982133.
Caetano, L. F., and P. F. Teixeira. 2016. “Strategic model to optimize railway-track renewal operations at a network level.” J. Infrastruct. Syst. 22 (2): 04016002. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000292.
Dao, C. D., R. Basten, and A. Hartmann. 2018. “Maintenance scheduling for railway tracks under limited possession time.” J. Transp. Eng. 144 (8): 04018039. https://doi.org/10.1061/JTEPBS.0000163.
Durazo-Cardenas, I., et al. 2018. “An autonomous system for maintenance scheduling data-rich complex infrastructure: Fusing the railways’ condition, planning and cost.” Transp. Res. Part C: Emerging Technol. 89 (Apr): 234–253. https://doi.org/10.1016/j.trc.2018.02.010.
European Commission. 2016. “Commission Staff Working document accompanying the document report from the Commission to the European Parliament and the Council fifth report on monitoring developments of the rail market.” Accessed March 29, 2018. https://eur-lex.europa.eu/legal-content/EN/ALL/?uri=SWD:2016:427:FIN.
Gorman, M. F., and J. J. Kanet. 2010. “Formulation and solution approaches to the rail maintenance production gang scheduling problem.” J. Transp. Eng. 136 (8): 701–708. https://doi.org/10.1061/(ASCE)0733-947X(2010)136:8(701).
Higgins, A. 1998. “Scheduling of railway track maintenance activities and crews.” J. Oper. Res. Soc. 49 (10): 1026–1033. https://doi.org/10.1057/palgrave.jors.2600612.
Lake, M., L. Ferreira, and E. Kozan. 2002. “Heuristic techniques for scheduling railway track maintenance.” In Operations research/management science at work: International series in operations research & management science, 177–187. Boston: Springer.
Lidén, T. 2015. “Railway infrastructure maintenance: A survey of planning problems and conducted research.” Transp. Res. Procedia 10: 574–583. https://doi.org/10.1016/j.trpro.2015.09.011.
Pargar, F., O. Kauppila, and J. Kujala. 2017. “Integrated scheduling of preventive maintenance and renewal projects for multi-unit systems with grouping and balancing.”, Comput. Ind. Eng. 110 (Aug): 43–58. https://doi.org/10.1016/j.cie.2017.05.024.
Peng, F., S. Kang, X. Li, Y. Ouyang, K. Somani, and D. Acharya. 2011. “A heuristic approach to the railroad track maintenance scheduling problem.” Comput.-Aided Civ. Infrastruct. Eng. 26 (2): 129–145. https://doi.org/10.1111/j.1467-8667.2010.00670.x.
Peralta, D., C. Bergmeir, M. Krone, M. Galende, M. Menéndez, G. I. Sainz-Palmero, B. C. Martinez, F. Klawonn, and J. M. Benitez. 2018. “Multiobjective optimization for railway maintenance plans.” J. Comput. Civ. Eng. 32 (3): 04018014. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000757.
Pouryousef, H., P. F. Teixeira, and J. Sussman. 2010. “Track maintenance scheduling and its interactions with operations: Dedicated and mixed high-speed rail (HSR) scenarios.” In Proc., 2010 Joint Rail Conf., 317–326. New York: ASME.
ProRail. 2017. Spoorkaart Nederland, Mogelijkheden langdurige btd’s Niet-reizigersluwe perioden. Utrecht, Netherlands: PRORAIL Capaciteits Management.
Santos, R., and P. F. Teixeira. 2012. “Heuristic analysis of the effective range of a track tamping machine.” J. Infrastruct. Syst. 18 (4): 314–322. https://doi.org/10.1061/(ASCE)IS.1943-555X.0000081.
Sharma, S., Y. Cui, Q. He, R. Mohammadi, and Z. Li. 2018. “Data-driven optimization of railway maintenance for track geometry.” Transp. Res. Part C: Emerging Technol. 90 (May): 34–58. https://doi.org/10.1016/j.trc.2018.02.019.
Su, Z., A. Jamshidi, A. Núñez, S. Baldi, and B. De Schutter. 2017. “Multi-level condition-based maintenance planning for railway infrastructures: A scenario-based chance-constrained approach.” Transp. Res. Part C: Emerging Technol. 84 (Nov): 92–123. https://doi.org/10.1016/j.trc.2017.08.018.
Vale, C., I. Ribeiro, and R. Calçada. 2012. “Integer programming to optimize tamping in railway tracks as preventive maintenance.” J. Transp. Eng. 138 (1): 123–131. https://doi.org/10.1061/(ASCE)TE.1943-5436.0000296.
Zhang, T., J. Andrews, and R. Wang. 2013. “Optimal scheduling of track maintenance on a railway network.” Qual. Reliab. Eng. Int. 29 (2): 285–297. https://doi.org/10.1002/qre.1381.
Zhao, J., A. Chan, A. Stirling, and K. Madelin. 2006. “Optimizing policies of railway ballast tamping and renewal.” Transp. Res. Rec. 1943 (1): 50–56. https://doi.org/10.1177/0361198106194300107.
Zhao, J., A. H. C. Chan, and M. P. N. Burrow. 2007. “Reliability analysis and maintenance decision for railway sleepers using track condition information.” J. Oper. Res. Soc. 58 (8): 1047–1055. https://doi.org/10.1057/palgrave.jors.2602251.
Zhao, J., A. H. C. Chan, and M. P. N. Burrow. 2009. “A genetic-algorithm-based approach for scheduling the renewal of railway track components.” Proc. Inst. Mech. Eng. Part F: J Rail Rapid Transit 223 (6): 533–541. https://doi.org/10.1243/09544097JRRT273.
Zorita, A. L., O. Duque, M. A. Fernández, and L. A. García-Escudero. 2010. “Determination and optimization of the maintenance frequencies in the overhead contact line system.” J. Transp. Eng. 136 (11): 964–972. https://doi.org/10.1061/(ASCE)TE.1943-5436.0000166.

Information & Authors

Information

Published In

Go to Journal of Infrastructure Systems
Journal of Infrastructure Systems
Volume 25Issue 4December 2019

History

Received: Oct 5, 2018
Accepted: Jun 10, 2019
Published online: Sep 28, 2019
Published in print: Dec 1, 2019
Discussion open until: Feb 28, 2020

Permissions

Request permissions for this article.

Authors

Affiliations

Postdoctoral Research Associate, Dept. of Engineering, Durham Univ., Durham DH1 3LE, UK (corresponding author). ORCID: https://orcid.org/0000-0002-3322-1243. Email: [email protected]
Associate Professor, Dept. of Civil Engineering, Univ. of Twente, P.O. Box 217, Enschede 7500 AE, Netherlands. ORCID: https://orcid.org/0000-0003-3753-5378
Anton Lamper
Maintenance Specialist, Asset Management Dept., ProRail, Moreelsepark 3, Utrecht 3511 EP, Netherlands.
Peter Herbert
Planning Coordinator, Asset Management Dept., ProRail, Moreelsepark 3, Utrecht 3511 EP, Netherlands.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share