Abstract

Worksite accidents in the construction and infrastructure industries result in cost overruns and schedule downtimes. Previous research has analyzed cost and schedule deviations caused by worksite accidents within these industries. However, a quantitative analysis of accidents at the subsector level and comparisons at the organizational level have yet to be undertaken. Toward this aim, worksite accident data are collected across different industry subsectors and organizations of different sizes, and an integrated risk register is constructed to capture cost and schedule deviations caused by worksite accidents. The findings indicate that structural and installation services are the main contributors to workplace accidents in terms of cost and time deviations. Moreover, organizational size is an important factor in the impact analysis of worksite accidents. Large organizations in the structural services were found to make a significant impact on cost overruns and schedule downtimes. They are followed by small organizations in the installation services subsector and medium/large organizations in the heavy and civil engineering subsector. The findings in this study reveal that improvements and investments in safety training and workplace communications are needed for efficient accident prevention.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request.

References

Alizadeh, S. S., S. B. Mortazavi, and M. Mehdi Sepehri. 2015. “Assessment of accident severity in the construction industry using the Bayesian theorem.” Int. J. Occup. Saf. Ergon. 21 (4): 551–557. https://doi.org/10.1080/10803548.2015.1095546.
Alkaissy, M., M. Arashpour, B. Ashuri, Y. Bai, and R. Hosseini. 2020. “Safety management in construction: 20 years of risk modeling.” Saf. Sci. 129 (Sep): 104805. https://doi.org/10.1016/j.ssci.2020.104805.
Alkaissy, M., M. Arashpour, H. Li, S. Alaghmand, and A. Nezamian. 2021a. “Quantitative analysis of safety risks and relationship with delayed project completion times.” Risk Anal. 12. https://doi.org/10.1111/risa.13778.
Alkaissy, M., M. Arashpour, A. Rashidi, S. R. Mohandes, and P. Farnood. 2021b. “Simulation-based analysis of occupational health and safety continuous improvement (OHSCI) in modern construction and infrastructure industries.” Autom. Constr. 189 (Feb): 104058. https://doi.org/10.1016/j.autcon.2021.104058.
Alkaissy, M., M. Arashpour, R. Wakefield, R. Hosseini, and P. Gill. 2021c. “The cost burden of safety risk incidents on construction: A probabilistic quantification method.” Risk Anal. 15. https://doi.org/10.1111/risa.13865.
Al-Kaissy, M., M. Arashpour, S. Fayezi, A. Nezhad, and B. Ashuri. 2019. “Process modelling in civil infrastructure projects: A review of construction simulation methods.” In Proc., Int. Symp. on Automation and Robotics in Construction, 368–375. Oulu, Finland: International Association for Automation and Robotics in Construction. https://doi.org/10.22260/isarc2019/0050.
Alruqi, W. M., and M. R. Hallowell. 2019. “Critical success factors for construction safety: Review and meta-analysis of safety leading indicators.” J. Constr. Eng. Manage. 145 (3): 04019005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001626.
Alzraiee, H., O. Moselhi, and T. Zayed. 2013. “A comparison of DES and SD for simulating construction operation.” In Proc., Annual Conf. of the Canadian Society for Civil Engineering 2013: Know-How-Savoir-Faire, CSCE 2013. New York: Association for Computing Machinery.
Anastasopoulos, P. C. 2016. “Random parameters multivariate tobit and zero-inflated count data models: Addressing unobserved and zero-state heterogeneity in accident injury-severity rate and frequency analysis.” Anal. Methods Accid. Res. 11 (Sep): 17–32. https://doi.org/10.1016/j.amar.2016.06.001.
Anastasopoulos, P. C., and F. L. Mannering. 2009. “A note on modeling vehicle accident frequencies with random-parameters count models.” Accid. Anal. Prev. 41 (1): 153–159. https://doi.org/10.1016/j.aap.2008.10.005.
Arashpour, M., A. Heidarpour, A. Akbar Nezhad, Z. Hosseinifard, N. Chileshe, and R. Hosseini. 2020. “Performance-based control of variability and tolerance in off-site manufacture and assembly: Optimization of penalty on poor production quality.” Construct. Manage. Econ. 38 (6): 502–514. https://doi.org/10.1080/01446193.2019.1616789.
Arashpour, M., V. Kamat, Y. Bai, R. Wakefield, and B. Abbasi. 2018. “Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction.” Autom. Constr. 95 (Nov): 1–9. https://doi.org/10.1016/j.autcon.2018.07.027.
Arashpour, M., T. Ngo, and H. Li. 2020. “Scene understanding in construction and buildings using image processing methods: A comprehensive review and a case study.” J. Build. Eng. 33 (Jan): 101672. https://doi.org/10.1016/j.jobe.2020.101672.
Arashpour, M., R. Wakefield, N. Blismas, and B. Abbasi. 2016. “Quantitative analysis of rate-driven and due date-driven construction: Production efficiency, supervision, and controllability in residential projects.” J. Constr. Eng. Manage. 142 (1): 05015012. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001032.
Arashpour, M., R. Wakefield, N. Blismas, and E. W. M. Lee. 2013. “A new approach for modelling variability in residential construction projects.” Australas. J. Construct. Econ. Build. 13 (2): 83–92. https://doi.org/10.5130/AJCEB.v13i2.3120.
Arashpour, M., R. Wakefield, N. Blismas, and E. W. M. Lee. 2014. “Framework for improving workflow stability: Deployment of optimized capacity buffers in a synchronized construction production.” Can. J. Civ. Eng. 41 (12): 995–1004. https://doi.org/10.1139/cjce-2014-0199.
Arslan, M., C. Cruz, A.-M. Roxin, and D. Ginhac. 2018. “Spatio-temporal analysis of trajectories for safer construction sites.” Smart Sustainable Built Environ. 68 (1): 106–116. https://doi.org/10.1016/j.aap.2013.10.007.
Asanka, W., and M. Ranasinghe. 2015. “Study on the impact of accidents on construction projects.” In Proc., 6th Int. Conf. on Structural Engineering and Construction Management. Gedung Inti Center, Indonesia: Collaborative Knowledge Network.
Baker, H., S. Smith, M. Hallowell, and D. Oswald. 2020. “Exploring the association among dimensions of safety climate and learning organization climate.” In Proc., Construction Research Congress 2020: Safety, Workforce, and Education. Reston, VA: ASCE.
Belil, S., N. Tchernev, and S. Kemmoé-Tchomté. 2019. “Simulation based optimization decision support tool for production planning.” IFAC-PapersOnLine 52 (13): 2402–2407. https://doi.org/10.1016/j.ifacol.2019.11.566.
Bhandari, S., M. R. Hallowell, L. Van Boven, M. Golparvar-Fard, J. Gruber, and K. M. Welker. 2018. “Using augmented virtuality to understand the situational awareness model.” In Proc., Construction Research Congress: Safety and Disaster Management. Reston, VA: ASCE.
Camarero, M. 2018. “Design and construction of an unintentional injury risk index (UIRI) to measure frequency and severity of accidental injuries in Europe.” Int. J. Inj. Control Saf. Promot. 25 (4): 458–464. https://doi.org/10.1080/17457300.2018.1473446.
Chan, A. P. C., Y. Yang, and A. Darko. 2018. “Construction accidents in a large-scale public infrastructure project: Severity and prevention.” J. Constr. Eng. Manage. 144 (10): 05018010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001545.
Chang, C. Y., and J. W. Ko. 2017. “New approach to estimating the standard deviations of lognormal cost variables in the Monte Carlo analysis of construction risks.” J. Constr. Eng. Manage. 143 (1): 06016006. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001207.
Chen, C., G. Zhang, Z. Qian, R. A. Tarefder, and Z. Tian. 2016. “Investigating driver injury severity patterns in rollover crashes using support vector machine models.” Accid. Anal. Prev. 90 (May): 128–139. https://doi.org/10.1016/j.aap.2016.02.011.
Chen, Y., B. McCabe, and D. Hyatt. 2017. “Impact of individual resilience and safety climate on safety performance and psychological stress of construction workers: A case study of the Ontario construction industry.” J. Saf. Res. 61 (Jun): 167–176. https://doi.org/10.1016/j.jsr.2017.02.014.
Cheng, C.-W., S.-S. Leu, Y.-M. Cheng, T.-C. Wu, and C.-C. Lin. 2012. “Applying data mining techniques to explore factors contributing to occupational injuries in Taiwan’s construction industry.” Accid. Anal. Prev. 48 (Sep): 214–222. https://doi.org/10.1016/j.aap.2011.04.014.
Cheng, C.-W., S.-S. Leu, C.-C. Lin, and C. Fan. 2010. “Characteristic analysis of occupational accidents at small construction enterprises.” Saf. Sci. 48 (6): 698–707. https://doi.org/10.1016/j.ssci.2010.02.001.
Chou, J.-S. 2011. “Cost simulation in an item-based project involving construction engineering and management.” Int. J. Project Manage. 29 (6): 706–717. https://doi.org/10.1016/j.ijproman.2010.07.010.
Committees, I. R. 2020. Civil infrastructure overview. Canberra, Australia: Australian Industry and Skills Committee.
Daniel, P. A., and C. Daniel. 2018. “Complexity, uncertainty and mental models: From a paradigm of regulation to a paradigm of emergence in project management.” Int. J. Project Manage. 36 (1): 184–197. https://doi.org/10.1016/j.ijproman.2017.07.004.
Deloitte, I. D. 2019. “GPoC 2018 global powers of construction.” Accessed May 19, 2021. https://www2.deloitte.com/content/dam/Deloitte/at/Documents/real-estate/at-global-powers-of-construction-2018.pdf.
Dumrak, J., S. Mostafa, I. Kamardeen, and R. Rameezdeen. 2013. “Factors associated with the severity of construction accidents: The case of South Australia.” Constr. Econ. Build. 13 (4): 32–49. https://doi.org/10.5130/AJCEB.v13i4.3620.
Ead, R., H. Elkholosy, A. Eltahan, S. Hague, and S. Abourizk. 2019. “Using combined discrete-event/ continuous modeling for simulation of safety incidents on project networks.” In Proc., 2019 Winter Simulation Conf., WSC 2019. New York: Association for Computing Machinery.
Enya, A., S. Dempsey, and M. Pillay. 2019. “High reliability organisation (HRO) principles of collective mindfulness: An opportunity to improve construction safety management.” In Vol. 791 of Proc., AHFE Int. Conf. on Safety Management and Human Factors, 2018, 3–13. Cham, Switzerland: Springer.
Fang, D., Y. Chen, and L. Wong. 2006. “Safety climate in construction industry: A case study in Hong Kong.” J. Constr. Eng. Manage. 132 (6): 573–584. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:6(573).
Feng, Y., S. Zhang, and P. Wu. 2015. “Factors influencing workplace accident costs of building projects.” Saf. Sci. 72 (Feb): 97–104. https://doi.org/10.1016/j.ssci.2014.08.008.
Furci, J., and R. Y. Sunindijo. 2020. “Impacts of the WHS Act 2011 on safety management in small and medium construction companies.” Int. J. Construct. Manage. 20 (3): 196–206. https://doi.org/10.1080/15623599.2018.1484844.
Gao, R., A. P. Chan, W. P. Utama, and H. Zahoor. 2017. “Workers’ perceptions of safety climate in international construction projects: Effects of nationality, religious belief, and employment mode.” J. Constr. Eng. Manage. 143 (4): 04016117. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001226.
Gholami, A., and A. Mirzazadeh. 2018. “An inventory model with controllable lead time and ordering cost, log-normal-distributed demand, and gamma-distributed available capacity.” Cogent Bus. Manage. 5 (1): 1469182. https://doi.org/10.1080/23311975.2018.1469182.
Goh, Y. M., and M. J. A. Ali. 2016. “A hybrid simulation approach for integrating safety behavior into construction planning: An earthmoving case study.” Accid. Anal. Prev. 93 (Aug): 310–318. https://doi.org/10.1016/j.aap.2015.09.015.
Goh, Y. M., C. U. Ubeynarayana, K. L. X. Wong, and B. H. Guo. 2018. “Factors influencing unsafe behaviors: A supervised learning approach.” Accid. Anal. Prev. 118 (Sep): 77–85. https://doi.org/10.1016/j.aap.2018.06.002.
Guo, B. H. W., T. W. Yiu, and V. A. González. 2018. “Does company size matter? Validation of an integrative model of safety behavior across small and large construction companies.” J. Saf. Res. 64 (Feb): 73–81. https://doi.org/10.1016/j.jsr.2017.12.003.
Han, S., F. Saba, S. Lee, Y. Mohamed, and F. Peña-Mora. 2014. “Toward an understanding of the impact of production pressure on safety performance in construction operations.” Accid. Anal. Prev. 68 (Jul): 106–116. https://doi.org/10.1016/j.aap.2013.10.007.
Heravi, G., and S. Faeghi. 2014. “Group decision making for stochastic optimization of time, cost, and quality in construction projects.” J. Comput. Civ. Eng. 28 (2): 275–283. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000264.
Hollnagel, E. 2018. Safety-I and safety-II: The past and future of safety management. Boca Raton, FL: CRC Press.
Holte, K. A., K. Kjestveit, and H. J. Lipscomb. 2015. “Company size and differences in injury prevalence among apprentices in building and construction in Norway.” Saf. Sci. 71 (Part C): 205–212. https://doi.org/10.1016/j.ssci.2014.01.007.
Kang, K., and H. Ryu. 2019. “Predicting types of occupational accidents at construction sites in Korea using random forest model.” Saf. Sci. 120 (Dec): 226–236. https://doi.org/10.1016/j.ssci.2019.06.034.
Kang, P. S., and R. S. Bhatti. 2019. “Continuous process improvement implementation framework using multi-objective genetic algorithms and discrete event simulation.” Bus. Process Manage. J. 25 (5): 1020–1039.
Kermanshachi, S., B. Dao, B. Rouhanizadeh, J. Shane, and S. Anderson. 2020. “Development of the project complexity assessment and management framework for heavy industrial projects.” Int. J. Construct. Educ. Res. 16 (1): 24–42. https://doi.org/10.1080/15578771.2018.1499568.
Khodakarami, V., and A. Abdi. 2014. “Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items.” Int. J. Project Manage. 32 (7): 1233–1245. https://doi.org/10.1016/j.ijproman.2014.01.001.
Koc, K., Ö. Ekmekcioğlu, and A. P. Gurgun. 2021. “Integrating feature engineering, genetic algorithm and tree-based machine learning methods to predict the post-accident disability status of construction workers.” Autom. Constr. 131 (Nov): 103896. https://doi.org/10.1016/j.autcon.2021.103896.
Kurowicka, D., and R. M. Cooke. 2006. Uncertainty analysis with high dimensional dependence modeling. Hoboken, NJ: Wiley.
Leung, M. Y., I. Y. S. Chan, and J. Yu. 2012. “Preventing construction worker injury incidents through the management of personal stress and organizational stressors.” Accid. Anal. Prev. 48 (Sep): 156–166. https://doi.org/10.1016/j.aap.2011.03.017.
Li, R. Y. M., D. C. W. Ho, and B. Tang. 2017. “Factors which affect construction safety in different types of construction work.” In Proc., Int. Conf. on Applied Human Factors and Ergonomics. New York: Applied Human Factors and Ergonomics.
Lingard, H. 2013. “Occupational health and safety in the construction industry.” Construct. Manage. Econ. 31 (6): 505–514. https://doi.org/10.1080/01446193.2013.816435.
Lingard, H., T. Cooke, and N. Blismas. 2012. “Do perceptions of supervisors’ safety responses mediate the relationship between perceptions of the organizational safety climate and incident rates in the construction supply chain?” J. Constr. Eng. Manage. 138 (2): 234–241. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000372.
Lingard, H., P. Pirzadeh, and D. Oswald. 2019. “Talking safety: Health and safety communication and safety climate in subcontracted construction workgroups.” J. Constr. Eng. Manage. 145 (5): 04019029. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001651.
Lingard, H. C., T. Cooke, and N. Blismas. 2009. “Group-level safety climate in the Australian construction industry: Within-group homogeneity and between-group differences in road construction and maintenance.” Construct. Manage. Econ. 27 (4): 419–432. https://doi.org/10.1080/01446190902822971.
Lingard, H. C., T. Cooke, and N. Blismas. 2010. “Safety climate in conditions of construction subcontracting: A multi-level analysis.” Construct. Manage. Econ. 28 (8): 813–825. https://doi.org/10.1080/01446190903480035.
Lipscomb, H. J., A. L. Schoenfisch, W. Cameron, K. L. Kucera, D. Adams, and B. A. Silverstein. 2014. “Twenty years of workers’ compensation costs due to falls from height among union carpenters, Washington State.” Am. J. Ind. Med. 57 (9): 984–991. https://doi.org/10.1002/ajim.22339.
Liu, W., T. Zhao, W. Zhou, and J. Tang. 2018. “Safety risk factors of metro tunnel construction in China: An integrated study with EFA and SEM.” Saf. Sci. 105 (Jun): 98–113. https://doi.org/10.1016/j.ssci.2018.01.009.
Loosemore, M., and N. Andonakis. 2007. “Barriers to implementing OHS reforms—The experiences of small subcontractors in the Australian Construction Industry.” Int. J. Project Manage. 25 (6): 579–588. https://doi.org/10.1016/j.ijproman.2007.01.015.
Lopez Del Puerto, C., C. M. Clevenger, K. Boremann, and D. P. Gilkey. 2014. “Exploratory study to identify perceptions of safety and risk among residential Latino construction workers as distinct from commercial and heavy civil construction workers.” J. Constr. Eng. Manage. 140 (2): 04013048. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000794.
Mani, N., K. P. Kisi, E. M. Rojas, and E. T. Foster. 2017. “Estimating construction labor productivity frontier: Pilot study.” J. Constr. Eng. Manage. 143 (10): 04017077. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001390.
Martinez, J. C. 2010. “Methodology for conducting discrete-event simulation studies in construction engineering and management.” J. Constr. Eng. Manage. 136 (1): 3–16. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000087.
Merna, T., and P. Jobling. 2006. Managing risk in construction projects. Chichester, UK: Blackwell Pub.
Moret, Y., and H. H. Einstein. 2012. “Modeling correlations in rail line construction.” J. Constr. Eng. Manage. 138 (9): 1075–1084. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000507.
Ning, X., J. Qi, and C. Wu. 2018. “A quantitative safety risk assessment model for construction site layout planning.” Saf. Sci. 104 (Apr): 246–259. https://doi.org/10.1016/j.ssci.2018.01.016.
Ogunseiju, O. R., J. Olayiwola, A. A. Akanmu, and C. Nnaji. 2021. “Digital twin-driven framework for improving self-management of ergonomic risks.” Smart Sustainable Built Environ. 10 (3): 17. https://doi.org/10.1108/SASBE-03-2021-0035.
Prasetio, R., R. Arifuddin, and F. Maricar. 2020. “Performance evaluation indicators for implementing occupational safety and health management policy in small qualified construction services business entities.” IOP Conf. Ser.: Earth Environ. Sci. 419 (1): 012149. https://doi.org/10.1088/1755-1315/419/1/012149.
Raczynski, S. 2020. “Discrete event simulation vs continuous system dynamics.” In Interacting complexities of herds and social organizations: Agent based modeling, 133–141. Singapore: Springer.
Ramli, M. Z., M. A. Malek, B. Hamid, N. T. Roslin, M. E. M. Roslan, S. Norhisham, and M. F. Mohd. 2018. “Influence of project type, location and area towards construction delay: A review on significance level of delay factors.” Int. J. Eng. Technol. 7 (4): 392–399. https://doi.org/10.14419/ijet.v7i4.35.22769.
Safe Work Australia. 2015. Work health and safety perceptions: Construction industry. Canberra, Australia: Safe Work Australia.
Safe Work Australia. 2017. “Guide to the occupational health and safety regulations.” Accessed May 2, 2021. https://www.worksafe.vic.gov.au/resources/guide-occupational-health-and-safety-regulations-2017.
Safe Work Australia. 2018a. Australian workers compensation statistics 2017-18. Canberra, Australia: Safe Work Australia.
Safe Work Australia. 2018b. Construction work: Code of practice. Canberra, Australia: Australian Government-Safe Work Australia.
Safe Work Australia. 2018c. Work-related traumatic injury fatalities. Canberra, Australia: Safe Work Australia.
Sakib, M. N., T. Chaspari, and A. H. Behzadan. 2021. “A feedforward neural network for drone accident prediction from physiological signals.” Smart Sustainable Built Environ. 10 (1): 25. https://doi.org/10.1108/sasbe-12-2020-0181.
Schexnayder, C., K. Knutson, and J. Fente. 2005. “Describing a beta probability distribution function for construction simulation.” J. Constr. Eng. Manage. 131 (2): 221–229. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:2(221).
Sousa, V., N. M. Almeida, and L. A. Dias. 2015. “Risk-based management of occupational safety and health in the construction industry—Part 2: Quantitative model.” Saf. Sci. 74 (Apr): 184–194. https://doi.org/10.1016/j.ssci.2015.01.003.
Sunindijo, R. Y. 2015. “Improving safety among small organisations in the construction industry: Key barriers and improvement strategies.” Procedia Eng. 125 (Jan): 109–116. https://doi.org/10.1016/j.proeng.2015.11.017.
Sunindijo, R. Y., and P. X. W. Zou. 2013. “Conceptualizing safety management in construction projects.” J. Constr. Eng. Manage. 139 (9): 1144–1153. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000711.
Tokdemir, O. B., H. Erol, and I. Dikmen. 2019. “Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation.” J. Constr. Eng. Manage. 145 (2): 04018132. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001595.
Touran, A., and L. Suphot. 1997. “Rank correlations in simulating construction costs.” J. Constr. Eng. Manage. 123 (3): 297–301. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:3(297).
Touran, A., and E. P. Wiser. 1992. “Monte Carlo technique with correlated random variables.” J. Constr. Eng. Manage. 118 (2): 258–272. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:2(258).
Toutounchian, S., M. Abbaspour, T. Dana, and Z. Abedi. 2018. “Design of a safety cost estimation parametric model in oil and gas engineering, procurement and construction contracts.” Saf. Sci. 106 (Jul): 35–46. https://doi.org/10.1016/j.ssci.2017.12.015.
Treasury and Finance, VSG (Victoria State Government). 2018. “Defining public construction (public construction—Guidance).” Accessed May 23, 2021. https://www.dtf.vic.gov.au/practitioners-toolkit/practitioners-toolkit-guidance-public-construction-procurement.
Trillo-Cabello, A. F., J. A. Carrillo-Castrillo, and J. C. Rubio-Romero. 2021. “Perception of risk in construction. Exploring the factors that influence experts in occupational health and safety.” Saf. Sci. 133 (Jan): 104990. https://doi.org/10.1016/j.ssci.2020.104990.
Visser, J. K. 2016. “Suitability of different probability distributions for performing schedule risk simulations in project management.” In Proc., 2016 Portland Int. Conf. on Management of Engineering and Technology (PICMET). New York: Portland International Center for Management Engineering and Technology.
Waehrer, G. M., X. S. Dong, T. Miller, E. Haile, and Y. Men. 2007. “Costs of occupational injuries in construction in the United States.” Accid. Anal. Prev. 39 (6): 1258–1266. https://doi.org/10.1016/j.aap.2007.03.012.
Winge, S., and E. Albrechtsen. 2018. “Accident types and barrier failures in the construction industry.” Saf. Sci. 105 (Jun): 158–166. https://doi.org/10.1016/j.ssci.2018.02.006.
Wu, C., X. Song, T. Wang, and D. Fang. 2015. “Core dimensions of the construction safety climate for a standardized safety-climate measurement.” J. Constr. Eng. Manage. 141 (8): 04015018. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000996.
Wu, T.-C., C.-W. Liu, and M.-C. Lu. 2007. “Safety climate in university and college laboratories: Impact of organizational and individual factors.” J. Saf. Res. 38 (1): 91–102. https://doi.org/10.1016/j.jsr.2007.01.003.
Yang, I.-T. 2011. “Stochastic time–cost tradeoff analysis: A distribution-free approach with focus on correlation and stochastic dominance.” Autom. Constr. 20 (7): 916–926. https://doi.org/10.1016/j.autcon.2011.03.008.
Zhang, H., H. Li, and C. M. Tam. 2004. “Fuzzy discrete-event simulation for modeling uncertain activity duration.” Eng. Constr. Archit. Manage. 11 (6): 426–437. https://doi.org/10.1108/09699980410570184.
Zhang, R. P., P. Pirzadeh, H. Lingard, and S. Nevin. 2018. “Safety climate as a relative concept: Exploring variability and change in a dynamic construction project environment.” Eng. Constr. Archit. Manage. 25 (3): 298–316. https://doi.org/10.1108/ECAM-09-2016-0207.
Zhang, S., F. Boukamp, and J. Teizer. 2015. “Ontology-based semantic modeling of construction safety knowledge: Towards automated safety planning for job hazard analysis (JHA).” Autom. Constr. 52 (Apr): 29–41. https://doi.org/10.1016/j.autcon.2015.02.005.
Zhu, R., X. Hu, J. Hou, and X. Li. 2020. “Application of machine learning techniques for predicting the consequences of construction accidents in China.” Process Saf. Environ. Prot. 145 (Jan): 293–302. https://doi.org/10.1016/j.psep.2020.08.006.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 148Issue 6June 2022

History

Received: Sep 3, 2021
Accepted: Jan 11, 2022
Published online: Mar 17, 2022
Published in print: Jun 1, 2022
Discussion open until: Aug 17, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Student, Dept. of Civil Engineering, Monash Univ., Melbourne, VIC 3800, Australia. ORCID: https://orcid.org/0000-0002-7812-827X. Email: [email protected]
Mehrdad Arashpour [email protected]
Associate Professor, Dept. of Civil Engineering, Monash Univ., Melbourne, VIC 3800, Australia (corresponding author). Email: [email protected]
Mehran Zeynalian [email protected]
Assistant Professor, Dept. of Civil Engineering, Univ. of Isfahan, Isfahan 81588, Iran. Email: [email protected]
Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hong Kong. ORCID: https://orcid.org/0000-0002-3187-9041. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

  • Enhancing construction safety: Machine learning-based classification of injury types, Safety Science, 10.1016/j.ssci.2023.106102, 162, (106102), (2023).

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share