Technical Papers
Nov 22, 2020

Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model

Publication: Journal of Construction Engineering and Management
Volume 147, Issue 2

Abstract

Quality and safety are important and are the leading concerns in a construction project. Planning a project without properly incorporating these two performance parameters propagates multifarious defects and accidents in construction projects and this ultimately leads to cost overrun and time delay. In order to deal with quality and safety at the planning stage (along with time and cost), a decision-making model considering time, cost, quality, and safety (TCQS) is developed on the basis of a many-objective evolutionary algorithm (nondominated sorting genetic algorithm III) and presented in this study. An example is illustrated to demonstrate the capabilities of the proposed model for generating and visualizing the optimal trade-off among TCQS. The proposed model shows better results compared to earlier reported scheduling models. Additionally, the study has also conducted a correlation analysis to identify the interrelationship, if any, among the TCQS components. Furthermore, the solution obtained from the model was put through sensitivity analysis. The developed model was also checked for two large-scale scheduling cases and found to work efficiently. The inclusion of objectives like quality and safety will provide a holistic scheduling model for the construction professionals. This study is expected to provide an alternative planning strategy and assist project managers in selecting optimal TCQS trade-offs while constructing a facility.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Some or all data, models, or code generated or used during the study are available from the corresponding author by request.

References

Afshar, A., and H. R. Z. Dolabi. 2014. “Multi-objective optimization of time-cost-safety using genetic algorithm.” Int. J. Optim. Civ. Eng. 4 (4): 433–450.
Afshar, A., A. Kaveh, and O. R. Shoghli. 2007. “Multi-objective optimization of time-cost-quality using multi-colony ant algorithm.” Fuzzy Sets Syst. 8 (2): 113–124.
Agdas, D., D. J. Warne, J. Osio-Norgaard, and F. J. Masters. 2018. “Utility of genetic algorithms for solving large-scale construction time-cost trade-off problems.” J. Comput. Civ. Eng. 32 (1): 04017072. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000718.
Alavipour, S. M. R., and D. Arditi. 2019. “Time-cost tradeoff analysis with minimized project financing cost.” Autom. Constr. 98 (Feb): 110–121. https://doi.org/10.1016/j.autcon.2018.09.009.
Anderson, S. D., and J. S. Russell. 2001. Guidelines for warranty, multi-parameter, and best value contracting. Washington, DC: National Academy Press.
Babu, A. J. G., and N. Suresh. 1996. “Project management with time, cost, and quality considerations.” Eur. J. Oper. Res. 88 (2): 320–327. https://doi.org/10.1016/0377-2217(94)00202-9.
Bader, J., and E. Zitzler. 2011. “HypE : An algorithm for fast optimization.” Evol. Comput. 19 (1): 45–76. https://doi.org/10.1162/EVCO_a_00009.
Chand, S., and M. Wagner. 2015. “Evolutionary many-objective optimization: A quick-start guide.” Surv. Oper. Res. Manage. Sci. 20 (2): 35–42. https://doi.org/10.1016/j.sorms.2015.08.001.
Deb, K., and D. Deb. 2014. “Analysing mutation schemes for real-parameter genetic algorithms.” Int. J. Artif. Intell. Soft Comput. 4 (1): 1. https://doi.org/10.1504/IJAISC.2014.059280.
Deb, K., and M. Goyal. 1996. “A combined genetic adaptive search (GeneAS) for engineering design.” Comput. Sci. Inf. 26 (4): 30–45.
Doloi, H., A. Sawhney, K. C. Iyer, and S. Rentala. 2012. “Analysing factors affecting delays in Indian construction projects.” Int. J. Project Manage. 30 (4): 479–489. https://doi.org/10.1016/j.ijproman.2011.10.004.
DSR (Delhi Schedule of Rates). 2016. “Schedule of rates.” Accessed July 20, 2017. http://mohua.gov.in/upload/uploadfiles/files/DSR%202016_New%20Tech_CPWD.pdf.
Elarbi, M., S. Bechikh, A. Gupta, L. Ben Said, and Y. S. Ong. 2018. “A new decomposition-based NSGA-II for many-objective optimization.” IEEE Trans. Syst. Man Cybern Syst. 48 (7): 1191–1210. https://doi.org/10.1109/TSMC.2017.2654301.
Elbeltagi, E., M. Ammar, H. Sanad, and M. Kassab. 2016. “Overall multiobjective optimization of construction projects scheduling using particle swarm.” Eng. Constr. Archit. Manage. 23 (3): 265–282. https://doi.org/10.1108/ECAM-11-2014-0135.
El-Rayes, K., and A. Kandil. 2005. “Time-cost-quality trade-off analysis for highway construction.” J. Constr. Eng. Manage. 131 (4): 477–486. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:4(477).
El-Rayes, K., and A. Khalafallah. 2005. “Trade-off between safety and cost in planning construction site layouts.” J. Constr. Eng. Manage. 131 (11): 1186–1195. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:11(1186).
Feng, H., L. Liu, and S. A. Burns. 1997. “Using genetic algorithms to solve construction time-cost trade-off.” J. Comput. Civ. Eng. 11 (3): 184–189. https://doi.org/10.1061/(ASCE)0887-3801(1997)11:3(184).
Fu, F., and T. Zhang. 2016. “A new model for solving time-cost-quality trade-off problems in construction.” PLoS One 11 (12): e0167142. https://doi.org/10.1371/journal.pone.0167142.
Garcia, S., and C. T. Trinh. 2019. “Comparison of multi-objective evolutionary algorithms to solve the modular cell design problem for novel biocatalysis.” Processes 7 (6): 361–373. https://doi.org/10.3390/pr7060361.
Ghodsi, R., and M. Skandari. 2009. “A new practical model to trade-off time, cost, and quality of a project.” Aust. J. Basic Appl. Sci. 3 (4): 3741–3756.
Hallowell, M. R., and J. A. Gambatese. 2009. “Construction safety risk mitigation.” J. Constr. Eng. Manage. 135 (12): 1316–1323. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000107.
Jain, H., and K. Deb. 2014. “An evolutionary many-objective optimization algorithm using reference-point based nondominated sorting approach. Part II: Handling constraints and extending to an adaptive approach.” IEEE Trans. Evol. Comput. 18 (4): 602–622. https://doi.org/10.1109/TEVC.2013.2281534.
Kandil, A., and K. El-Rayes. 2006. “MACROS: Multiobjective automated construction resource optimization system.” J. Manage. Eng. 22 (3): 126–134. https://doi.org/10.1061/(ASCE)0742-597X(2006)22:3(126).
Khalili-Damghani, K., M. Tavana, A. R. Abtahi, and F. J. Santos Arteaga. 2015. “Solving multi-mode time-cost-quality trade-off problems under generalized precedence relations.” Optim. Methods Software 30 (5): 965–1001. https://doi.org/10.1080/10556788.2015.1005838.
Khang, D. B., and Y. M. Myint. 1999. “Time, cost and quality trade-off in project management: A case study.” Int. J. Project Manage. 17 (4): 249–256. https://doi.org/10.1016/S0263-7863(98)00043-X.
Köppen, M., and K. Yoshida. 2007. “Substitute distance assignments in NSGA-II for handling many-objective optimization problems.” In Proc., Int. Conf. on Evolutionary Multi-Criterion Optimization, 727–741. Berlin: Springer.
Li, B., and K. Tang. 2016. “Stochastic ranking algorithm for many-objective optimization based on multiple indicators.” IEEE Trans. Evol. Comput. 20 (6): 924–938. https://doi.org/10.1109/TEVC.2016.2549267.
Li, H., G. Chan, and M. Skitmore. 2012. “Multiuser virtual safety training system for tower crane dismantlement.” J. Comput. Civ. Eng. 26 (5): 638–647. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000170.
Liberatore, M. J., and B. Pollack-Johnson. 2013. “Improving project management decision making by modeling quality, time, and cost continuously.” IEEE Trans. Eng. Manage. 60 (3): 518–528. https://doi.org/10.1109/TEM.2012.2219586.
Lim, S. M., A. B. M. Sultan, M. N. Sulaiman, A. Mustapha, and K. Y. Leong. 2017. “Crossover and mutation operators of genetic algorithms.” Int. J. Mach. Learn. Comput. 7 (1): 9–12. https://doi.org/10.18178/ijmlc.2017.7.1.611.
Minchin, R. E., and G. R. Smith. 2001. Quality-based performance rating of contractors for prequalification and bidding purposes. Wingate, PA: Pennsylvania Transportation Institute.
Mkaouer, M. W., M. Kessentini, S. Bechikh, K. Deb, and M. Ó Cinnéide. 2014. “High dimensional search-based software engineering.” In Proc., 2014 Conf. on Genetic and Evolutionary Computation—GECCO’14, 1263–1270. New York: Association for Computing Machinery. https://doi.org/10.1145/2576768.2598366.
Monghasemi, S., M. R. Nikoo, M. A. Khaksar Fasaee, and J. Adamowski. 2015. “A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects.” Expert Syst. Appl. 42 (6): 3089–3104. https://doi.org/10.1016/j.eswa.2014.11.032.
Mrad, M., K. S. Al-Gahtani, R. Hulchafo, N. Souayah, and K. Bamatraf. 2019. “Risk assessment for discrete stochastic time-cost-quality trade-off problem using simulation-based integer linear programming approach.” IEEE Access 7 (Mar): 32453–32463. https://doi.org/10.1109/ACCESS.2019.2903229.
Ning, X., and K. C. Lam. 2013. “Cost-safety trade-off in unequal-area construction site layout planning.” Autom. Constr. 32 (Jul): 96–103. https://doi.org/10.1016/j.autcon.2013.01.011.
Ogwueleka, A. C. 2013. “A review of safety and quality issues in the construction industry.” J. Constr. Eng. Project Manage. 3 (3): 42–48. https://doi.org/10.6106/JCEPM.2013.3.3.042.
Panwar, A., and K. N. Jha. 2019. “A many-objective optimisation model for construction scheduling.” Constr. Manage. Econ. 37 (12): 727–739. https://doi.org/10.1080/01446193.2019.1590615.
Panwar, A., K. K. Tripathi, and K. N. Jha. 2019. “A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects.” Eng. Constr. Archit. Manage. 26 (9): 1924–1945. https://doi.org/10.1108/ECAM-06-2018-0246.
Patel, D. A., K. D. Kikani, and K. N. Jha. 2016. “Hazard assessment using consistent fuzzy preference relations approach.” J. Constr. Eng. Manage. 142 (12): 04016067. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001192.
Ramaswamy, S. K., and G. A. Mosher. 2017. “Using workers’ compensation claims data to characterize occupational injuries in the commercial grain elevator industry.” J. Agric. Saf. Health 23 (3): 203–217. https://doi.org/10.13031/jash.12196.
Ramírez, A., J. R. Romero, and S. Ventura. 2015. “A comparative study of many-objective evolutionary algorithms for the discovery of software architectures.” Empirical Software Eng. 21 (6): 2546–2600. https://doi.org/10.1007/s10664-015-9399-z.
Razavi Hajiagha, S. H., H. Akrami, S. S. Hashemi, and H. Amoozad Mahdiraji. 2015. “An integer grey goal programming for project time, cost and quality trade-off.” Eng. Econ. 26 (1): 93–100. https://doi.org/10.5755/j01.ee.26.1.9930.
Taheri Amiri, M. J., F. R. Haghighi, E. Eshtehardian, and O. Abessi. 2017. “Optimization of time, cost and quality in critical chain method using simulated annealing.” Int. J. Eng. 30 (5): 627–635. https://doi.org/10.5829/idosi.ije.2017.30.05b.01.
Tareghian, H. R., and S. H. Taheri. 2006. “On the discrete time, cost and quality trade-off problem.” Appl. Math. Comput. 181 (2): 1305–1312. https://doi.org/10.1016/j.amc.2006.02.029.
Tareghian, H. R., and S. H. Taheri. 2007. “A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search.” Appl. Math. Comput. 190 (2): 1136–1145. https://doi.org/10.1016/j.amc.2007.01.100.
Tavana, M., A. R. Abtahi, and K. Khalili-Damghani. 2014. “A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems.” Expert Syst. Appl. 41 (4): 1830–1846. https://doi.org/10.1016/j.eswa.2013.08.081.
Tiwari, S., and S. Johari. 2015. “Project scheduling by integration of time cost trade-off and constrained resource scheduling.” J. Inst. Eng. (India) Ser. A 96 (1): 37–46. https://doi.org/10.1007/s40030-014-0099-2.
Toğan, V., and M. A. Eirgash. 2019. “Time-cost trade-off optimization of construction projects using teaching learning based optimization.” KSCE J. Civ. Eng. 23 (1): 10–20. https://doi.org/10.1007/s12205-018-1670-6.
Tran, D. H., M. Y. Cheng, and M. T. Cao. 2015. “Hybrid multiple objective artificial bee colony with differential evolution for the time-cost-quality tradeoff problem.” Knowledge Based Syst. 74 (1): 176–186. https://doi.org/10.1016/j.knosys.2014.11.018.
Tran, D. H., M. Y. Cheng, and D. Prayogo. 2016. “A novel multiple objective symbiotic organisms search (MOSOS) for time-cost-labor utilization tradeoff problem.” Knowledge Based Syst. 94: 132–145. https://doi.org/10.1016/j.knosys.2015.11.016.
Tran, D. H., L. Luong-Duc, M. T. Duong, T. N. Le, and A. D. Pham. 2018. “Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects.” J. Comput. Des. Eng. 5 (2): 160–172. https://doi.org/10.1016/j.jcde.2017.11.008.
Von Lücken, C., B. Barán, and C. Brizuela. 2014. “A survey on multi-objective evolutionary algorithms for many-objective problems.” Comput. Optim. Appl. 58 (3): 707–756. https://doi.org/10.1007/s10589-014-9644-1.
Wanberg, J., C. Harper, M. R. Hallowell, and S. Rajendran. 2013. “Relationship between construction safety and quality performance.” J. Constr. Eng. Manage. 139 (10): 04013003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000732.
Wang, H., L. Jiao, and X. Yao. 2015. “Two_arch2: An improved two-archive algorithm for many-objective optimization.” IEEE Trans. Evol. Comput. 19 (4): 524–541. https://doi.org/10.1109/TEVC.2014.2350987.
Wood, D. A. 2017. “Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm.” J. Nat. Gas Sci. Eng. 45: 143–164. https://doi.org/10.1016/j.jngse.2017.04.033.
Yang, I.-T. 2007. “Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis.” J. Constr. Eng. Manage. 133 (7): 498–505. https://doi.org/10.1061/(ASCE)0733-9364(2007)133:7(498).
Zhang, H., and H. Li. 2010. “Multi-objective particle swarm optimization for construction time-cost tradeoff problems.” Constr. Manage. Econ. 28 (1): 75–88. https://doi.org/10.1080/01446190903406170.
Zhang, H., and F. Xing. 2010. “Fuzzy-multi-objective particle swarm optimization for time-cost-quality tradeoff in construction.” Autom. Constr. 19 (8): 1067–1075. https://doi.org/10.1016/j.autcon.2010.07.014.
Zhang, L., J. Du, and S. Zhang. 2014. “Solution to the time-cost-quality trade-off problem in construction projects based on immune genetic particle swarm optimization.” J. Manage. Eng. 30 (2): 163–172. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000189.
Zheng, D. X. M., S. T. Ng, and M. M. Kumaraswamy. 2005. “Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time–cost optimization.” J. Constr. Eng. Manage. 131 (1): 81–91. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:1(81).
Zheng, H. 2017. “The Bi-level optimization research for time-cost-quality-environment trade-off scheduling problem and its application to a construction project.” In Vol. 502 of Proc., 10th Int. Conf. on Management Science and Engineering Management, edited by J. Xu, A. Hajiyev, S. Nickel, and M. Gen, 745–753. Singapore: Springer. https://doi.org/10.1007/978-981-10-1837-4_62.
Zitzler, E., and L. Thiele. 1999. “Multiobjective evolutionary algorithms: A comparative case study and the strength Pareto approach.” IEEE Trans. Evol. Comput. 3 (4): 257–271. https://doi.org/10.1109/4235.797969.
Zou, J., L. Fu, J. Zheng, S. Yang, G. Yu, and Y. Hu. 2018. “A many-objective evolutionary algorithm based on rotated grid.” Appl. Soft Comput. J. 67 (Jun): 596–609. https://doi.org/10.1016/j.asoc.2018.02.031.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 147Issue 2February 2021

History

Received: Mar 11, 2020
Accepted: Aug 28, 2020
Published online: Nov 22, 2020
Published in print: Feb 1, 2021
Discussion open until: Apr 22, 2021

Permissions

Request permissions for this article.

Authors

Affiliations

Formerly, Ph.D. Student, Dept. of Civil Engineering, Indian Institute of Technology Delhi, Delhi 110016, India (corresponding author). ORCID: https://orcid.org/0000-0002-4293-5061. Email: [email protected]
Kumar Neeraj Jha [email protected]
Professor, Dept. of Civil Engineering, Indian Institute of Technology Delhi, Delhi 110016, India. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share