Case Studies
Apr 6, 2018

Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project

Publication: Journal of Construction Engineering and Management
Volume 144, Issue 6

Abstract

Design errors are one of the major risk factors causing rework and delay. Therefore, accurate cost analysis of potential economic losses attributable to design errors is crucial from a practical point of view. This paper proposes a basis for establishing building information modeling (BIM) investment strategies by quantifying the various costs associated with design errors for error prevention. The design errors were classified into three basic types: simple design (Type 1); rework-related (Type 2) that may lead to demolition and rework; and delay-related (Type 3) likely to prolong the construction period. To evaluate the effects of BIM application quantitatively, the performance potential of BIM-assisted identification of individual design errors was examined. A comparison of the influences of classified design errors on the project revealed that the total cost of the design errors leading to schedule delay was 194.69% higher than that of the simple design errors and the direct design error costs due to errors leading to demolition and rework.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated or analyzed during the study are available from the corresponding author by request. Information about the Journal’s data-sharing policy can be found here: http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001263.

References

Ahankoob, A., Khoshnava, S. M., Rostami, R., and Preece, C. (2012). “BIM perspectives on construction waste reduction.” Management in Construction Research Association (MiCRA) Postgraduate Conf., Kuala Lumpur, Malaysia, 195–199.
Akinci, B., and Fischer, M. (1998). “Factors affecting contractors’ risk of cost overburden.” J. Manage. Eng., 67–76.
Anumba, C., et al. (2010). The BIM project execution planning guide and templates: Version 2.0, Pennsylvania State Univ., University Park, PA.
Azhar, S. (2011). “Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry.” Leadersh. Manage. Eng., 241–252.
Azhar, S., Hein, M., and Sketo, B. (2008). “Building information modeling (BIM): Benefits, risks and challenges.” Int. Proc., 44th Annual Conf., T. Sulbaran, ed., Auburn Univ., Auburn, AL.
Barber, P., Sheath, D., Tomkins, C., and Graves, A. (2000). “The cost of quality failures in major civil engineering projects.” Int. J. Qual. Reliab. Manage., 17(4/5), 479–492.
BIMx Desktop Viewer [Computer software]. GRAPHISOFT, Waltham, MA.
Busby, J. S., and Hughes, E. J. (2004). “Projects, pathogens, and incubation periods.” Int. J. Project Manage., 22(5), 425–434.
Cheng, J., Won, J., and Das, M. (2015). “Construction and demolition waste management using BIM technology.” Int. Group Lean Construction Conf. (IGLC), Perth, Australia, 381–390.
Chin, S., and Choi, C. (2015). “BIM issues & value analysis on the new HQ construction project of Korea Land & Housing Company.” ⟨http://bimforum.org/2015/11/06/orlando-bimforum-fall-2015-presentations/#more-4841⟩ (Jan. 24, 2017).
Cooper, K. G. (1993). “The rework cycle: Benchmarking for the project manager.” Project Manage. J., 24(1), 17–22.
Cowie, G. (1987). “Enough scope yields better estimates.” J. Constr. Eng. Manage., 315–320.
Eastman, C., Teicholz, P., Sacks, R., and Liston, K. (2010). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers, and contractors, 2nd Ed., Wiley, Hoboken, NJ.
Giel, B. K., and Issa, R. R. A. (2013). “Return on investment analysis of using building information modeling in construction.” J. Comput. Civ. Eng., 511–521.
Giel, B. K., Issa, R. R. A., and Olbina, S. (2010). “Return on investment analysis of building information modeling in construction.” Int. Conf. on Computing in Civil and Building Engineering (ICCCBE), W. Tizani, ed., Nottingham University Press, Nottingham, U.K., 153–158.
Han, S. W., Lee, S. H., and Peña-Mora, F. (2012). “Identification and quantification of non-value adding effort due to errors and changes in design and construction projects.” J. Constr. Eng. Manage., 98–109.
Han, S. W., Love, P. E. D., and Peña-Mora, F. (2013). “A system dynamics model for assessing the impacts of design errors in construction projects.” Math. Comput. Model., 57(9–10), 2044–2053.
Hetland, P. W. (1994). “Toward ultimate control of megaprojects in the North Sea.” Global project management handbook, D. Cleland and R. Gareis, eds., McGraw-Hill, New York, 1–21.
Jernigan, F. E. (2008). BIG BIM little BIM: The practical approach to building information modeling: Integrated practice done the right way! 4Site Press, Salisbury, MD.
Kaner, I., Sacks, R., Kassian, W., and Quitt, T. (2008). “Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms.” J. Inf. Technol. Constr., 13, 303–323.
Khanzode, A., Fischer, M., and Reed, D. (2008). “Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project.” J. Inf. Technol. Constr., 13, 324–342.
Kim, S., Chin, S., Han, J., and Choi, C. (2017). “Measurement of construction BIM value based on a case study of a large-scale building project.” J. Manage. Eng., .
Lee, G., Park, K., and Won, J. (2012). “D3 City project: Economic impact of BIM-assisted design validation.” Autom. Constr., 22, 577–586.
Liu, Z., Osmani, M., Demian, P., and Baldwin, A. N. (2011). “The potential use of BIM to aid construction waste minimalisation.” Proc. CIB W78–W102 2011, Sophia Antipolis, France.
Lopez, R., and Love, P. E. D. (2012). “Design error costs in construction projects.” J. Constr. Eng. Manage., 585–593.
Lopez, R., Love, P. E. D., Edwards, D. J., and Davis, P. R. (2010). “Design error classification, causation, and prevention in construction engineering.” J. Perform. Constr. Facil., 399–408.
Love, P. E. D., and Edwards, D. (2004). “Forensic project management: the underlying causes of rework in construction projects.” Civ. Environ. Eng. Syst., 21(3), 207–228.
Love, P. E. D., Irani, Z., and Edwards, D. (2003). “Learning to reduce rework in projects: analysis of firms learning and quality practices.” Proj. Manag. J., 34(3), 13–25.
Love, P. E. D., Edwards, D. J., Smith, J., and Walker, D. H. T. (2009). “Divergence or congruence? A path model of rework for building and civil engineering projects.” J. Perform. Constr. Facil., 480–488.
McGraw-Hill Construction. (2012). The business value of BIM in North America: Multi-year trend analysis and user ratings (2007–2012), Bedford, MA.
Moon, S., Forlani, J., Wang, X., and Tam, V. (2016a). “Productivity study of the scaffolding operations in liquefied natural gas plant construction: Ichthys project in Darwin, Northern Territory, Australia.” J. Prof. Issues Eng. Educ. Pract., .
Moon, S., Han, S., Zekavat, P. R., Bernold, L. E., and Wang, X. (2016b). “Process-waste reduction in the construction supply chain using proactive information network.” Concurrent Eng., 25(2), 123–135.
Moon, S., Zekavat, P. R., and Bernold, L. E. (2015). “Dynamic control of construction supply chain to improve labor performance.” J. Constr. Eng. Manage., 1–12.
Moon, S., Zekavat, P. R., and Bernold, L. E. (2017). “Dynamic quality control of process resource to improve concrete supply chain.” J. Constr. Eng. Manage., .
Neelamkavil, J., and Ahamed, S. (2012). “The return on investment from BIM-driven projects in construction.”, National Research Council, Ottawa.
Park, K. (2011). A study on the effect of pre-detecting errors using BIM in the preconstruction phase, Yonsei Univ., Seoul.
Peansupap, V., and Ly, R. (2015). “Evaluating the impact level of design errors in structural and other building components in building construction projects in Cambodia.” Procedia Eng., 123, 370–378.
Rajendran, P., and Gomez, C. P. (2012). “Implementing BIM for waste minimization in the construction industry: A literature review.” Proc., 2nd Int. Conf. on Management, Malaysia, 557–570.
Rodrigues, A., and Bowers, J. (1996). “The role of system dynamics in project management.” Int. J. Project Manage., 14(4), 213–220.
Rounce, G. (1998). “Quality, waste, and cost consideration in architectural building design management.” Int. J. Project Manage., 16(2), 123–127.
Sacks, R., Eastman, C. M., and Lee, G. (2003). “Process improvements in precast concrete construction using top-down parametric 3-D computer-modeling.” PCI J., 48(3), 46–55.
Santoso, D. S., Ogunlana, S. O., and Minato, T. (2003). “Assessment of risks in high rise building construction in Jakarta.” Eng. Constr. Archit. Manage., 10(1), 43–55.
Sun, M., and Meng, X. (2009). “Taxonomy for change causes and effects in construction projects.” Int. J. Project Manage., 27(6), 560–572.
Walasek, D., and Barszcz, A. (2017). “Analysis of the adoption rate of building information modeling [BIM] and its return on investment [ROI].” Procedia Eng., 172, 1227–1234.
Williams, M. (2011). “Building-information modeling improves efficiency, reduces need for changes.” ⟨http://www.bizjournals.com/louisville/print-edition/2011/07/08/building-information-modeling-improves.html⟩ (Mar. 17, 2017).
Won, J., Cheng, J., and Lee, G. (2016). “Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea.” Waste Manage., 49, 170–180.
Young, N. W., Jones, S. A., and Bernstein, H. M. (2008). “Building information modeling (BIM): Transforming design and construction to achieve greater industry productivity.”, McGraw-Hill Construction, Bedford, MA, 48.
Young, N. W., Jones, S. A., Bernstein, H. M., and Gudgel, J. E. (2009). “The business value of BIM.”, McGraw-Hill Construction, Bedford, MA.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 144Issue 6June 2018

History

Received: Aug 14, 2017
Accepted: Dec 5, 2017
Published online: Apr 6, 2018
Published in print: Jun 1, 2018
Discussion open until: Sep 6, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

Namhyuk Ham
Ph.D. Candidate, Dept. of Architectural Engineering, Hanyang Univ., Seoul 04763, Korea.
Sungkon Moon, Ph.D.
Lecturer, Dept. of Civil and Construction Engineering, Centre for Sustainable Infrastructure, Swinburne Univ. of Technology, Melbourne, VIC 3122, Australia.
Ju-Hyung Kim, Ph.D.
Professor, Dept. of Architectural Engineering, Hanyang Univ., Seoul 04763, Korea.
Jae-Jun Kim, Ph.D., A.M.ASCE [email protected]
Professor, Dept. of Architectural Engineering, Hanyang Univ., Seoul 04763, Korea (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share