Fuzzy Cognitive Map Approach to Analyze Causes of Change Orders in Construction Projects

Publication: Journal of Construction Engineering and Management
Volume 144, Issue 2

Abstract

The negative impacts of change orders on construction projects are well documented in the literature. Effective management of change orders requires a comprehensive approach to identify and analyze their causes. A change order in construction projects is usually an outcome of combining several interrelated causes, rather than a single cause. Most of the previous studies have considered the causes of change orders as independent causes. However, the causes of change orders have a complicated causal structure, which makes it difficult to independently analyze and prioritize them. Therefore, this study contributes to the body of knowledge in change order management by proposing a fuzzy cognitive map (FCM) approach, which has the capability to analyze the causes of change orders considering their entire causal interactions. The root causes of change orders, as well as the direct ones, can be identified and prioritized by the proposed approach. The manageability of the causes can also be analyzed by the FCM approach. The performance of the proposed approach is evaluated by implementing it in a real construction project. A modeling-validating approach is used to construct and validate the FCM model. It is believed that the proposed FCM approach presents a powerful tool for analyzing the causes of change orders. In addition, this research contributes to knowledge in the area of FCMs by proposing a new inference law.

Get full access to this article

View all available purchase options and get full access to this article.

Data Availability Statement

Data generated and analyzed during the study are available from the corresponding author by request. Information about the Journal’s data sharing policy can be found here: http://ascelibrary.org/doi/10.1061/%28ASCE%29CO.1943-7862.0001263.

References

Aljassmi, H., and Han, S. (2013). “Analysis of causes of construction defects using fault trees and risk importance measures.” J. Constr. Eng. Manage., 870–880.
Alnuaimi, A. S., Taha, R. A., Al Mohsin, M., and Al-Harthi, A. S. (2010). “Causes, effects, benefits, and remedies of change orders on public construction projects in Oman.” J. Constr. Eng. Manage., 615–622.
Alsulami, B., and Mohamed, S. (2012). “Hybrid fuzzy sustainability assessment model: A case study of a regional infrastructure transport project.” Int. Conf. on Sustainable Design, Engineering, and Construction, ASCE, Reston, VA, 400–408.
Anastasopoulos, P. C., Labi, S., Bhargava, A., Bordat, C. B., and Mannering, F. L. (2010). “Frequency of change orders in highway construction using alternate count-data modeling methods.” J. Constr. Eng. Manage., 886–893.
Arain, F. M., and Pheng, L. S. (2005). “How design consultants perceive potential causes of variation orders for institutional buildings in Singapore.” Archit. Eng. Des. Manage., 1(3), 181–196.
Arditi, D., Akan, G. T., and Gurdamar, S. (1985). “Reasons for delays in public projects in Turkey.” Constr. Manage. Econ., 3(2), 171–181.
Assaf, S. A., and Al-Hejji, S. (2006). “Causes of delay in large construction projects.” Int. J. Project Manage., 24(4), 349–357.
Axelrod, R. (1976). Structure of decision: The cognitive maps of political elites, Princeton University Press, Princeton, NJ.
Borenstein, D., and Betencourt, P. R. B. (2005). “A multi-criteria model for the justification of it investments.” Inf. Syst. Oper. Res., 43(1), 1–21.
Bröchner, J., and Badenfelt, U. (2011). “Changes and change management in construction and IT projects.” Autom. Constr., 20(7), 767–775.
Bueno, S., and Salmeron, J. L. (2009). “Benchmarking main activation functions in fuzzy cognitive maps.” Expert Syst. Appl., 36(3), 5221–5229.
Chan, D. W. M., and Kumaraswamy, M. M. (1997). “A comparative study of causes of time overruns in Hong Kong construction projects.” Int. J. Project Manage., 15(1), 55–63.
Chen, J., and Hsu, S. C. (2007). “Hybrid ANN-CBR model for disputed change orders in construction projects.” Autom. Constr., 17(1), 56–64.
Cox, I. D., Morris, J. P., Rogerson, J. H., and Jared, G. E. (1999). “A quantitative study of post contract award design changes in construction.” Constr. Manage. Econ., 17(4), 427–439.
Dickerson, J. A., and Kosko, B. (1993). “Virtual worlds as fuzzy cognitive maps.” Proc., IEEE Virtual Reality Annual Int. Symp., IEEE, Seattle, 471–477.
Diekmann, E., and Nelson, M. C. (1985). “Construction claims: Frequency and severity.” J. Constr. Eng. Manage., 74–81.
Dissanayake, M., and AbouRizk, S. M. (2007). “Qualitative simulation of construction performance using fuzzy cognitive maps.” Proc., 39th Conf. on Winter Simulation, IEEE, Piscataway, NJ, 2134–2140.
Du, J., El-Gafy, M., and Zhao, D. (2016). “Optimization of change order management process with object-oriented discrete event simulation: Case study.” J. Constr. Eng. Manage., 05015018.
Fallahnejad, M. H. (2013). “Delay causes in Iran gas pipeline projects.” Int. J. Project Manage., 31(1), 136–146.
Giabbanelli, P. J., Torsney-Weir, T., and Mago, V. K. (2012). “A fuzzy cognitive map of the psychosocial determinants of obesity.” Appl. Soft Comput. J., 12(12), 3711–3724.
Glykas, M. (2010). Fuzzy cognitive maps, Springer, Berlin.
Groumpos, P. P. (2010). “Fuzzy cognitive maps: Basic theories and their application to complex systems.” Fuzzy cognitive maps, Vol. 247, Springer, Berlin, 1–22.
Günhan, S., Arditi, D., and Doyle, J. (2007). “Avoiding change orders in public school construction.” J. Prof. Issues Eng. Educ. Pract., 67–73.
Han, S., Lee, S., and Peña-Mora, F. (2012). “Identification and quantification of non-value-adding effort from errors and changes in design and construction projects.” J. Constr. Eng. Manage., 98–109.
Hanna, A. S., Russell, J. S., Nordheim, E. V, and Bruggink, M. J. (1999). “Impact of change orders on labor efficiency for electrical construction.” J. Constr. Eng. Manage., 224–232.
Heravi, G., and Charkhakan, M. H. (2014). “Predicting and tracing change-formation scenarios in construction projects using the DEMATEL technique.” J. Manage. Eng., 04014028.
Hsieh, T., Lu, S., and Wu, C. (2004). “Statistical analysis of causes for change orders in metropolitan public works.” Int. J. Project Manage., 22(8), 679–686.
Hwang, B., Zhao, X., and Goh, K. J. (2014). “Investigating the client-related rework in building projects: The case of Singapore.” Int. J. Project Manage., 32(4), 698–708.
Ibbs, C. W., Wong, C. K., and Kwak, Y. H. (2001). “Project change management system.” J. Manage. Eng., 159–165.
Ibbs, W. (2012). “Construction change: Likelihood, severity, and impact on productivity.” J. Legal Affairs Dispute Resolut. Eng. Constr., 67–73.
Ibbs, W., Nguyen, L. D., and Lee, S. (2007). “Quantified impacts of project change.” J. Prof. Issues Eng. Educ. Pract., 45–52.
Jingmond, M., and Ågren, R. (2015). “Unravelling causes of defects in construction.” Constr. Innovation, 15(2), 198–218.
Keane, P., Sertyesilisik, B., and Ross, A. D. (2010). “Variations and change orders on construction projects.” J. Legal Affairs Dispute Resolut. Eng. Constr., 89–96.
Kosko, B. (1986). “Fuzzy cognitive maps.” Int. J. Man-Mach. Stud., 24(1), 65–75.
Kosko, B. (1988). “Hidden patterns in combined and adaptive knowledge networks.” Int. J. Approximate Reasoning, 2(4), 377–393.
Koushki, P. A., Al-Rashid, K., and Kartam, N. (2005). “Delays and cost increases in the construction of private residential projects in Kuwait.” Constr. Manage. Econ., 23(3), 285–294.
Landry, M., Malouin, J. L., and Oral, M. (1983). “Model validation in operational research.” Eur. J. Oper. Res., 14(3), 207–220.
Lee, S. M., Peña-Mora, F., and Park, M. (2005). “Quality and change management model for large scale concurrent design and construction projects.” J. Constr. Eng. Manage., 890–902.
Leonard, C. A. (1988). “The effects of change orders on productivity.” Ph.D. dissertation, Concordia Univ., Montreal.
Lopez, C., and Salmeron, J. L. (2014). “Dynamic risks modelling in ERP maintenance projects with FCM.” Inf. Sci., 256, 25–45.
Love, P. E. D., Holt, G. D., Shen, L. Y., Li, H., and Irani, Z. (2002). “Using systems dynamics to better understand change and rework in construction project management systems.” Int. J. Project Manage., 20(6), 425–436.
Mago, V. K., et al. (2013). “Analyzing the impact of social factors on homelessness: A fuzzy cognitive map approach.” BMC Med. Inf. Decis. Making, 13(1), 94.
Mago, V. K., Bakker, L., Papageorgiou, E. I., Alimadad, A., Borwein, P., and Dabbaghian, V. (2012). “Fuzzy cognitive maps and cellular automata: An evolutionary approach for social systems modelling.” Appl. Soft Comput., 12(12), 3771–3784.
Malouin, J. L., and Landry, M. (1983). “The mirage of universal methods in systems design.” J. Appl. Syst. Anal., 10, 47–62.
Moselhi, O., Assem, I., and El-Rayes, K. (2005). “Change orders impact on labor productivity.” J. Constr. Eng. Manage., 354–359.
Moselhi, O., Leonard, C., and Fazio, P. (1991). “Impact of change orders on construction productivity.” Can. J. Civ. Eng., 18(3), 484–492.
Motawa, I. A. (2005). “A systematic approach to modelling change processes in construction projects.” Aust. J. Constr. Econ. Build., 5(1), 23–31.
Motawa, I. A., Anumba, C. J., and El-Hamalawi, A. (2006). “A fuzzy system for evaluating the risk of change in construction projects.” Adv. Eng. Software, 37(9), 583–591.
Papageorgiou, E. I., et al. (2008). “Brain tumor characterization using the soft computing technique of fuzzy cognitive maps.” Appl. Soft Comput., 8(1), 820–828.
Papageorgiou, E. I., Markinos, A. T., and Gemtos, T. A. (2010). “Soft computing technique of fuzzy cognitive maps to connect yield defining parameters with yield in cotton crop production in central Greece as a basis for a decision support system for precision agriculture application.” Fuzzy cognitive maps: Advances in theory, methodologies, tools and applications, Springer, Berlin.
Papageorgiou, E. I., and Salmeron, J. L. (2013). “A review of fuzzy cognitive maps research during the last decade.” IEEE Trans. Fuzzy Syst., 21(1), 66–79.
Papageorgiou, E. I., and Salmeron, J. L. (2014). “Methods and algorithms for fuzzy cognitive map-based modeling.” Fuzzy cognitive maps for applied sciences and engineering, Vol. 54, Springer, Berlin, 1–28.
Papakostas, G. A., and Koulouriotis, D. E. (2010). “Classifying patterns using fuzzy cognitive maps.” Fuzzy cognitive maps, Vol. 247, Springer, Berlin, 291–306.
Perkins, R. A. (2009). “Sources of changes in design-build contracts for a governmental owner.” J. Constr. Eng. Manage., 588–593.
Pidd, M. (2010). “Why modelling and model use matter.” J. Oper. Res. Soc., 61(1), 14–24.
Robinson, S. (1999). “Simulation verification, validation and confidence: A tutorial.” J. Trans. Soc. Comput. Simul., 16(2), 63–69.
Rodrigues da Silva, A. N., Kuri, N. P., and Casale, A. (2012). “PBL and B-learning for civil engineering students in a transportation course.” J. Prof. Issues Eng. Educ. Pract., 305–313.
Sadiq, R., Kleiner, Y., and Rajani, B. (2008). “Simulation-based localized sensitivity analyses (SaLSA)—An example of water quality failures in distribution networks.” World Environmental and Water Resources Congress, ASCE, Reston, VA, 1–10.
Serag, E., Oloufa, A., Malone, L., and Radwan, E. (2010). “Model for quantifying the impact of change orders on project cost for U.S. roadwork construction.” J. Constr. Eng. Manage., 1015–1027.
Shipton, C., Hughes, W., and Tutt, D. (2014). “Change management in practice: An ethnographic study of changes to contract requirements on a hospital project.” Constr. Manage. Econ., 32(7–8), 787–803.
Stach, W., Kurgan, L., and Pedrycz, W. (2010). “Expert-based and computational methods for developing fuzzy cognitive maps.” Fuzzy cognitive maps, Vol. 247, Springer, Berlin, 23–41.
Stocks, S. N., and Singh, A. (1999). “Studies on the impact of functional analysis concept design on reduction in change orders.” Constr. Manage. Econ., 17(3), 251–267.
Subramanian, J., Karmegam, A., Papageorgiou, E., Papandrianos, N., and Vasukie, A. (2015). “An integrated breast cancer risk assessment and management model based on fuzzy cognitive maps.” Comput. Methods Programs Biomed., 118(3), 280–297.
Sun, M., and Meng, X. (2009). “Taxonomy for change causes and effects in construction projects.” Int. J. Project Manage., 27(6), 560–572.
Sweis, G., Sweis, R., Abu Hammad, A., and Shboul, A. (2008). “Delays in construction projects: The case of Jordan.” Int. J. Project Manage., 26(6), 665–674.
Tayfur, G., Erdem, T. K., and Önder, K. (2014). “Strength prediction of high-strength concrete by fuzzy logic and artificial neural networks.” J. Mater. Civ. Eng., 04014079.
Taylor, T. R. B., Uddin, M., Goodrum, P. M., Mccoy, A., and Shan, Y. (2012). “Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects.” J. Constr. Eng. Manage., 1360–1369.
Thomas, H. R., and Napolitan, C. L. (1995). “Quantitative effects of construction changes on labor productivity.” J. Constr. Eng. Manage., 290–296.
Tsadiras, A. K. (2008). “Comparing the inference capabilities of binary, trivalent and sigmoid fuzzy cognitive maps.” Inf. Sci., 178(20), 3880–3894.
Zakeri, M., Olomolaiye, P. O., Holt, G. D., and Harris, F. C. (1996). “A survey of constraints on Iranian construction operatives’ productivity.” Constr. Manage. Econ., 14(5), 417–426.
Zaneldin, E. K. (2006). “Construction claims in United Arab Emirates: Types, causes, and frequency.” Int. J. Project Manage., 24(5), 453–459.
Zhao, Z. Y., Lv, Q. L., Zuo, J., and Zillante, G. (2010). “Prediction system for change management in construction project.” J. Constr. Eng. Manage., 659–669.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 144Issue 2February 2018

History

Received: Feb 27, 2017
Accepted: Aug 3, 2017
Published online: Dec 6, 2017
Published in print: Feb 1, 2018
Discussion open until: May 6, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

Mostafa Khanzadi [email protected]
Associate Professor, School of Civil Engineering, Iran Univ. of Science and Technology, P.O. Box 16846-13114, Narmak, Tehran, Iran (corresponding author). E-mail: [email protected]
Farnad Nasirzadeh [email protected]
Associate Professor, School of Architecture and Built Environment, Deakin Univ., Geelong, VIC 3220, Australia; Dept. of Civil Engineering, Faculty of Engineering, Payame Noor Univ., P.O. Box 19395-3697, Tehran, Iran. E-mail: [email protected]
Mohammad Saleh Dashti [email protected]
Ph.D. Candidate, School of Civil Engineering, Iran Univ. of Science and Technology, P.O. Box 16846-13114, Narmak, Tehran, Iran. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share