Rework is a chronic problem in construction and engineering projects. A wide variety of studies examining the nature of rework have been undertaken since the seminal research of Burati in the early 1990s, which examined quality deviations. Initial studies focused on identifying the causal factors and costs of rework to quantify the severity of the problem. From these studies, it was recognized that rework causes were interdependent; so techniques such as cognitive mapping (CM) and system dynamics (SD) were subsequently introduced to model the complexity and dynamic of this phenomena. Although such results provided the essential building blocks to better understand and provide the much-needed stimulus for theory development, rework remains a pervasive issue. A number of factors have contributed to the causal ambiguity that presently prevails, which includes the epistemological underpinning used to construct the nature of causes and the subsequent use of tools and techniques that are used for analysis. Evidence of this is presented in recent studies that have failed to acknowledge the interdependency of rework causes as research regressed to identifying those causes of a singular nature. Consequently, such research continues to stymie progress toward reducing and containing rework, and a moratorium on such approaches is suggested. With this in mind, insights into the extant rework literature and causation philosophy are examined and recommendations to improve the understanding necessary to establish a theory for rework causality are proposed.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The authors would like to thank the Australian Research Council (DP130103018) for the funding that enabled the ideas and empirical research drawn upon to be presented in this paper.
References
Abdul-Rahman, H. (1995). “The cost of non-conformance during a highway project: A case study.” Constr. Manage. Econ., 13(1), 23–32.
Ackermann, F. (2012). “Problem structuring methods ‘in the Dock’: Arguing the case for soft OR.” Eur. J. Oper. Res., 219(3), 652–658.
Ackermann, F., and Eden, C. (2005). “Using causal mapping with group support systems to elicit an understanding of failure in complex projects: Some implications for organizational research.” Group Decis. Negotiation, 14(5), 355–376.
Ackermann, F., Eden, C., and Cropper, S. (1992). “Getting started with cognitive mapping.” Proc., 7th Young OR Conf., Univ. of Warwick, U.K.
Ackermann, F., Eden, C., and Williams, T. (1997). “Modeling for litigation: mixing qualitative and quantitative approaches.” Interfaces, 27(2), 48–65.
Aiyetan, A. O. (2013). “Causes of rework on building construction projects in Nigeria.” J. Constr. Proj. Manage. Innov., 12(3), 1–15.
Aljassmi, H., and Han, S. (2013). “Analysis of causes of construction defects using fault trees and risk importance measures.” J. Constr. Eng. Manage., 870–880.
Balke, A. A. (1995). “Probabilistic counterfactuals: Semantics, computation, and applications.” Ph.D. thesis, Univ. of California, Los Angeles.
Barber, P., Sheath, D., Tomkins, C., and Graves, A. (2000). “The cost of quality failures in major civil engineering projects.” Int. J. Qual. Reliab. Manage., 17(4–5), 479–492.
Bell, J. (2004). “Causation and causal conditions.” Proc., 9th Int. Conf. on the Principles of Knowledge Representation and Reasoning, D. Dubios, et al., eds., AAAI Press, Palo Alto, CA, 2–11.
Bell, J. (2007). “Natural events.” J. Artif. Intell. Res., 30, 361–412.
Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). “Causes of quality deviations in design and construction.” J. Constr. Eng. Manage., 34–49.
Busby, J. S. (2001). “Error and distributed cognition in design.” Des. Stud., 22(3), 233–254.
Byrne, R. M. J. (2005). The rational imagination: How people create counterfactual alternatives to reality, MIT Press, Cambridge, MA.
Cavender, N. M., and Kahne, H. (2010). Logic and contemporary rhetoric: The use of reason in everyday life, 11th Ed., Wadsworth, Belmont, CA.
Construction Industry Development Agency. (1995). “Measuring up or muddling through: Best practice in the Australian non-residential construction industry.” Construction Industry Development Agency and Masters Builders Australia, Sydney, Australia, 59–63.
Cooper, K. G. (1993a). “The rework cycle: Benchmarks for the project manager.” Proj. Manage. J., 24(1), 17–21.
Cooper, K. G. (1993b). “The rework cycle: Why projects are mismanaged.” PM Network Magazine, 5–7.
Damer, T. E. (1995). Attacking faulty reasoning: A practical guide to fallacy-free arguments, 3rd Ed., Wadsworth Publishing, Belmont, CA, 131.
Dekker, S. W. A. (2002). “Reconstructing the human contribution to accidents: The new view of human error and performance.” J. Saf. Res., 33(3), 371–385.
Dekker, S. W. A. (2006). The field guide to understanding human error, Ashgate, Farnham, U.K.
Di Tillio, A., Gilboa, I., and Samuelson, L. (2012). “The predictive role of counterfactuals.” Theory Decis., 73(1), 167–182.
Ford, D. N., and Sterman, J. D. (2003). “The lair’s club: Concealing rework in concurrent development.” Concurrent Eng. Res. Appl., 11(3), 211–219.
Frege, G. (1879). “Concept notation, the formal language of the pure thought like that of arithmetics.” Begriffsschrift: Eine der arithmetischen nachgebildete Formelsprache des reinen Denkens, Halle, Germany.
Goodman, N. D., Ullman, T., and Tenebaum, J. B. (2011). “Learning a theory of causality.” Psychol. Rev., 118(1), 110–119.
Han, S., Love, P. E. D., and Pena-Mora, F. (2013). “A system dynamics model for assessing the impacts of design errors in construction projects.” Math. Comput. Modell., 57(9–10), 2044–2053.
Hausmann, D. M. (2010). “Proabilistic causality and causal generalizations.” The place of proability in science, E. Eells and J. H. Fetzer, eds., Springer, Berlin.
Hitchcock, C. (2001). “The intransitivity of causation revealed in equations and graphs.” J. Philos., 98(6), 273–299.
Hitchcock, C. (2012). “Probabilistic causation.” 〈http://www.plato.stanford.edu/archives/win2012/entries/causation-probabilistic/〉 (Feb. 28, 2015).
Hollnagel, E. (2004). Barriers and accident prevention, Ashgate, Farnham, U.K.
Hwang, B-G., Zhao, X., and Goh, K. J. (2014). “Investigating the client-related rework in building projects: The case of Singapore.” Int. J. Proj. Manage., 32(4), 698–708.
Hwang, B.-G., Thomas, S. R., Haas, C. T., and Caldas, C. H. (2009). “Measuring the impact of rework on construction cost performance.” J. Constr. Eng. Manage., 187–198.
Janis, I. L., and Mann, L. (1977). Decision-making: A psychological analysis of conflict, choice, and commitment, Free Press, New York.
Jingmond, M., and Ågren, R. (2015). “Unravelling causes of defects in construction.” Constr. Innov., 15, 198–218.
Josephson, P.-E., Larrson, B., and Li, H. (2002). “Illustrative benchmarking rework and rework costs in the Swedish construction industry.” J. Manage. Eng., 76–83.
Kahneman, D., and Tversky, A. (1974). “Judgment under uncertainty: Heuristics and biases.” Science, 185, 1124–1131.
Kahneman, D., and Tversky, A. (1982). “Judgments of and by representativeness.” Judgment under uncertainty: Heuristics and biases, D. Kahneman, P. Slovic, and A. Tversky, eds., Cambridge University Press, Cambridge, U.K.
Kahneman, D., and Tversky, A. (1983). “Extension versus intuitive reasoning: The conjunction fallacy in probability judgment.” Psychol. Rev., 90(4), 293–315.
Kakitahi, J. M., Alinaitwe, H. M., Landin, A., and Rodrigues, M. J. A. (2014). “Comparison of construction-related rework in Uganda and Mozambique.” J. Constr. Proj. Manage. Innov., 4(1), 770–781.
Kelly, G. A. (1955). The psychology of personal constructs, Norton, New York.
Lewis, D. (1973). “Causation.” J. Philos., 60, 17–25.
Lewis, D. (2000). “Causation as influence.” J. Philos., 97(4), 182–197.
Li, Y., and Taylor, T. (2014). “Modeling the impact of design rework on transportation infrastructure construction project performance.” J. Constr. Eng. Manage., 04014044.
Love, P. E. D. (2002a). “Auditing the indirect consequences of rework in construction: A case based approach.” Manage. Audit. J., 17(3), 138–146.
Love, P. E. D. (2002b). “Influence of project type and procurement method on rework costs in building construction projects.” J. Constr. Eng. Manage., 18–29.
Love, P. E. D., Ackermann, F., Smith, J., Irani, Z., and Edwards, D. J. (2015b). “Making sense of rework causation in hydrocarbon projects.” Project Manage. J., in press.
Love, P. E. D., Cheung, S. O., Irani, Z., and Davis, P. R. (2011a). “Causal discovery and inference of project disputes.” IEEE Trans. Eng. Manage., 58(3), 400–411.
Love, P. E. D., and Edwards, D. (2004). “Determinants of rework in construction projects.” Eng. Constr. Archit. Manage., 11(4), 259–274.
Love, P. E. D., Edwards, D. J., Han, S., and Goh, Y. M. (2011c). “Design error reduction: Toward the effective utilization of building information modelling.” Res. Eng. Des., 22(3), 173–187.
Love, P. E. D., Edwards, D. J., and Irani, Z. (2012a). “Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns.” IEEE Trans. Eng. Manage., 59(4), 560–571.
Love, P. E. D., Edwards, D. J., Irani, Z., and Walker, D. H. T. (2009a). “Project pathogens: The anatomy of omission errors in construction and resource engineering projects.” IEEE Trans. Eng. Manage., 56(3), 425–435.
Love, P. E. D., Edwards, D. J., Smith, J., and Walker, D. H. T. (2009b). “Congruence or divergence? A path model of rework in building and civil engineering projects.” J. Perform. Constr. Facil., 480–488.
Love, P. E. D., Irani, Z., and Edwards, D. J. (2004). “A rework reduction model for construction projects.” IEEE Trans. Eng. Manage., 51(4), 426–440.
Love, P. E. D., and Josephson, P-E. (2004). “Role of the error-recovery process in projects.” J. Manage. Eng., 70–79.
Love, P. E. D., and Li, H. (2000). “Quantifying the causes and costs of rework in construction.” Constr. Manage. Econ., 18(4), 479–490.
Love, P. E. D., Li, H., and Mandal, P. (1999). “Rework: A symptom of a dysfunctional supply-chain.” Eur. J. Purchas. Supply Manage., 5(1), 1–11.
Love, P. E. D., Lopez, R., Edwards, D. J., and Goh, Y. (2012d). “Systemic modelling of design errors in social infrastructure projects.” Accid. Anal. Prev., 48, 100–110.
Love, P. E. D., and Sing, C-P. (2013). “Determining the probability distribution of rework costs in construction and engineering projects.” Struct. Infrastruct. Eng., 9(11), 1136–1148.
Love, P. E. D., Toe, P., Ackermann, F., and Morrison, J. (2015a). “From individual to collective learning: Enacting rework prevention in a program water infrastructure alliance.” J. Constr. Eng. Manage., 05015009.
Lyneis, J. M., and Ford, D. N. (2007). “System dynamics applied to project management: A survey, assessment, and directions for future research.” Syst. Dyn. Rev., 23(2–3), 157–189.
Menzies, P. (1989). “Probabilistic causation and causal processes: A critique of Lewis.” Philos. Sci., 56(4), 642–663.
Menzies, P. (1996). “Probabilistic causation and the pre-emption problem.” Mind, 105(417), 85–117.
Menzies, P. (1999). “Intrinsic versus extrinsic conceptions of causation.” Causation and laws of nature, H. Sankey, ed., Kluwer Academic Publishers, Dordrecht, the Netherlands, 313–329.
Menzies, P. (2014). “Counterfactual theories of causation.” 〈www.stanford.edu/archives/spr2014/entries/causation-counterfactual〉 (Feb. 28, 2015).
Miller, G., and Johnson-Laird, P. N. (1976). Language and perception, Cambridge University Press, Cambridge, U.K.
Noordhof, P. (1999). “Probabilistic causation, preemption and counterfactuals.” Mind, 108(429), 95–125.
Paul, L. A. (2009). “Counterfactual theories of causation.” Handbook of causation, H. Beebee, C. Hitchcock, and P. Peter Menzies, eds., Oxford University Press, Oxford, U.K.
Pearl, J. (2000). Causality: Models, reasoning, and inference, Cambridge University Press, Cambridge, U.K.
Robinson-Fayek, A., Dissanayake, M., and Campero, O. (2003). “Measuring and classifying construction field rework: A pilot study.” 〈http://coaa.ab.ca/portals/Library/Measuring%20and%20Classifying%20Construction%20Rework%20-%20Final%20Report.pdf〉 (Mar. 10, 2015).
Robinson-Fayek, A., Dissanayake, M., and Campero, O. (2004). “Developing a standard methodology for measuring and classifying construction fieldwork.” Can. J. Civ. Eng., 31(6), 1077–1089.
Rodigues, A., and Bowers, J. (1996). “The role of system dynamics in project management.” Int. J. Proj. Manage., 14(4), 213–220.
Rodrigues, A. G., and Williams, T. M. (1998). “System dynamics in project management: Assessing the impacts of client behaviour on project performance.” J. Oper. Res. Soc., 49(1), 2–15.
Roese, N. (1997). “Counterfactual thinking.” Psychol. Bull., 121(1), 133–148.
Roese, N. J., and Olson, J. M. (1995). What might have been: The social psychology of counterfactual thinking, Erlbaum, NJ.
Rogge, D. F., Cogliser, C., Alaman, H., and McCormack, S. (2001). “An investigation into field rework in industrial construction.”, Construction Industry Institute, Austin, TX.
Roth, G., and Kliener, A. (1996). “The learning initiative at AutoCo epiloson program. 1991–1994.” Center for Organizational Learning, Sloan School of Management, Massachusetts Institute of Technology, Cambridge, MA.
Russell, B. (1913). “On the notion of cause.” Proc. Aristotelian Soc., 13, 1–26.
Salmon, W. C. (1998). Causality and explanation, Oxford University Press, Oxford, U.K.
Schacter, D. L., Benoit, R. G., De Brigard, F., and Szpunar, K. K. (2013). “Episodic future thinking and episodic counterfactual thinking: Intersections between memory and decisions.” Neurobiol. Learn. Memory, 117, 14–21.
Schaffer, J. (2000). “Trumping preemption.” J. Philos., 97(4), 165–181.
Shaw, B. M. (1981). “The escalation of commitment to a course of action.” Acad. Manage. Rev., 6, 274–297.
Taggart, M., Koskeal, L., and O’Rourke, J. (2014). “The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach.” Constr. Manage. Econ., 32(7–8), 829–842.
Taylor, T., and Ford, D. N. (2006). “Tipping point failure and robustness in single development projects.” Syst. Dyn. Rev., 22(1), 51–71.
Tenenbaum, J. B., and Griffiths, T. L. (2003). “Theory-based causal induction.” Advances in neural information processing systems, S. Becker, S. Thrun, and K. Obermayer, eds., Vol. 15, MIT Press, Cambridge, MA, 35–42.
Tombesi, P. (2000). “Modelling the dynamics of design error induced rework in construction: Comment.” Constr. Manage. Econ., 18(7), 727–732.
Tversky, B. (1993). “Cognitive maps, cognitive collages, and spatial mental models in spatial information theory: A theoretical basis for GIS.” Lect. Notes Comput. Sci., 716, 14–24.
Weick, K. E. (2001). Making sense of the organization, Blackwell Publishing, Malden, MA.
Williams, T. M., Ackermann, F., and Eden, C. (2003). “Structuring a delay and disruption claim: An application of cause-mapping and system dynamics.” Eur. J. Oper. Res., 148(1), 192–204.
Williamson, J. (2006a). “Causal pluralism versus epistemic causality.” Philosohica, 77, 259–276.
Williamson, J. (2006b). “Dispositional versus epistemic causality.” Minds Mach., 16(3), 259–276.
Williamson, J. (2009). “Probabilistic theories of causality.” Handbook of causation, H. Beebee, C. Hitchcock, and P. Peter Menzies, eds., Oxford University Press, Oxford, U.K., 185–212.
Wold, H. (1954). “Causality and econometrics.” Econometrica, 22(2), 162–177.
Ye, G., Jin, Z., Xia, B., and Skitmore, M. (2014). “Analyzing causes for reworks in construction projects in China.” J. Manage. Eng., 04014097.
Information & Authors
Information
Published In
Copyright
© 2016 American Society of Civil Engineers.
History
Received: Mar 13, 2015
Accepted: Oct 27, 2015
Published online: Jan 19, 2016
Published in print: Jun 1, 2016
Discussion open until: Jun 19, 2016
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.