Employing Data Warehousing for Contract Administration: e-Dispute Resolution Prototype
Publication: Journal of Construction Engineering and Management
Volume 139, Issue 6
Abstract
Although data warehouse is very practical for decision making, its application in contract administration is rather limited because of the complicated legal issues and the voluminous data involved. This research attempts to bridge this gap in two ways. First, conceptual models of data warehouse are developed to explain the contents and overall features of the system that were verified by 12 experts in Malaysia. Second, an electronic dispute resolution template, known as e-Dispute Resolution (e-DR), is prototyped by using a database tool based on the guidelines of contractual variations agreed by the experts. Subsequently, the prototype is evaluated by 16 professional quantity surveyors from an established consulting firm. The prototype was organized based on a systematic breakdown of issues and incorporated a Boolean keyword search feature. The results show that the concept of data warehouse is applicable to contract administration and is well received by practitioners. Overall, this article renders significant theoretical and practical contributions in which the resulting e-DR does not only lead toward more informed decision making but is also able to mitigate or prevent contractual disputes in the construction industry, where such a phenomenon seems to be inevitable.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This research is supported and funded by Construction Research Institute of Malaysia (CREAM) for Vote Number 4405/C01, under the Construction Industry and Development Board, Malaysia.
References
Ajam, M., Alshawi, M., and Mezher, T. (2010). “Augmented process model for e-tendering: Towards integrating object models with document management systems.” Autom. Constr., 19(6), 762–778.
Al-Sabah, S. S. J. A., Fereig, S. M., and Hoare, D. J. (2003). “A database management system to document and analyse construction claims.” Adv. Eng. Softw., 34(8), 477–491.
Anastasopoulos, P. C., Labi, S., Bhargava, A., Bordat, C., and Mannering, F. L. (2010). “Frequency of change orders in highway construction using alternate count-data modeling methods.” J. Constr. Eng. Manage., 136(8), 886–893.
Broome, J. C., and Hayes, R. W. (1997). “A comparison of the clarity of traditional construction contracts and of the new engineering contract.” Int. J. Project Manage., 15(4), 255–261.
Charles, J., and Bruce, F. D. (1990). “Investigation into construction disputes.” J. Manage. Eng., 6(1), 39–46.
Chau, K. W. (2007). “Application of a PSO-based neural network in analysis of outcomes of construction claims.” Autom. Constr., 16(5), 642–646.
Chau, K. W., Cao, Y., Anson, M., and Zhang, J. (2003). “Application of data warehouse and Decision Support System in construction management.” Autom. Constr., 12(2), 213–224.
Chen, D.-N., Liang, T.-P., and Lin, B. (2010). “An ecological model for organizational knowledge management.” J. Comp. Info. Syst., 50(3), 11–22.
Chen, J.-H. (2008). “KNN based knowledge-sharing model for severe change order disputes in construction.” Autom. Constr., 17(6), 773–779.
Chen, P.-H., Wan, C., Tiong, R. L. K., Ting, S. K., and Yang, Q. (2004). “Augmented IDEF1-based process oriented information modeling.” Autom. Constr., 13(6), 735–750.
Cheng, M. Y., Tsai, H. C., and Chiu, Y. H. (2009). “Fuzzy case-based reasoning for coping with construction disputes.” Expert Syst. Appl., 36(2), 4106–4113.
Cheung, S. O., Kenneth, T. W. Y., and Henry, S. (2004). “Construction negotiation online.” J. Constr. Eng. Manage., 130(6), 844–852.
Cheung, S. O., and Yiu, T. W. (2007). “A study of construction mediator tactics—part I: taxonomies of dispute sources, mediator tactics and mediation outcomes.” Build. Environ., 42(2), 752–761.
Chong, H. Y., Balamuralithara, B., and Chong, S. C. (2011). “Construction Contract Administration in Malaysia Using DFD: A Conceptual Model.” Ind. Manage. Data Syst., 111(9), 1449–1461.
Chong, H. Y., and Zin, R. M. (2010). “A case study into the language structure of construction standard form in Malaysia.” Int. J. Proj. Manage., 28(6), 601–608.
Gupta, H., and Mumick, I. S. (2005). “Selection of views to materialize in a data warehouse.” IEEE Trans. Knowl. Data Eng., 17(1), 24–43.
Hsu, Y. L., Lee, C. H., and Kreng, V. B. (2010). “The application of Fuzzy Delphi Method and Fuzzy AHP in lubricant regenerative technology selection.” Expert Syst. Appl., 37(1), 419–425.
Hwang, M. I., and Xu, H. (2008). “A structural model of data warehousing success.” J. Comp. Info. Syst., 49(1), 48–56.
Inmon, B., and Valente, G. (2010). “A peek into the future: The next wave of data warehousing.” 〈http://tdwi.org/Articles/2010/02/03/Next-Wave-DW.aspx?Page=1〉 (Mar. 3, 2010).
Inmon, W. H. (2002). Building the data warehouse, 3rd Ed., Wiley, New York.
Kassab, M., Hipel, K., and Hegazy, T. (2006). “Conflict resolution in construction disputes using the graph model.” J. Constr. Eng. Manage., 132(10), 1043–1052.
Kim, H., Soibelman, L., and Grobler, F. (2008). “Factor selection for delay analysis using knowledge discovery in databases.” Autom. Constr., 17(5), 550–560.
Kraiem, Z. M. (1988). “DISCON: An Expert System for Construction.” Ph.D. thesis, Univ. of Colorado, Boulder, CO.
Kuo, Y. F., and Chen, P. C. (2008). “Constructing performance appraisal indicators of mobility of the service industries using fuzzy delphi method.” Expert Syst. Appl., 35(4), 1930–1939.
Liang, S.-K., Hsieh, S.-Y., and Ling, H.-C. (2006). “Determinants of the assignment of managers to foreign ranches by banks, using the fuzzy delphi method.” Int. J. Manage., 3(2), 261–271.
Luo, W. H., and Tung, Y. (1999). “A framework of selecting process modelling methods.” Ind. Manag. Data Syst., 99(7), 312–319.
Mitra, M., and Chaudhuri, B. B. (2000). “Information retrieval from documents: A survey.” Info. Retrieval, 2(2–3), 141–163.
Moselhi, O., Assem, I., and El-Rayes, K. (2005). “Change orders impact on labor productivity.” J. Constr. Eng. Manage., 131(3), 354–359.
Nitithamyong, P., and Skibniewski, M. J. (2004). “Web-based construction project management systems: how to make them successful.” Autom. Constr., 13(4), 491–506.
Perkins, R. A. (2009). “Sources of changes in design—Build contracts for a governmental owner.” J. Constr. Eng. Manage., 135(7), 588–593.
Rahman, N. (2007). “Refreshing data warehouses with near real-time updates.” J. Comp. Info. Syst., 47(3), 71–80.
Rameezdeen, R., and Rajapakse, C. (2007). “Contract interpretation: The impact of readability.” Constr. Manag. Econ., 25(7), 729–737.
Robinson, N., Betts, M., and Santhanam, J. (1991). “Expert systems for construction contract interpretation.” Proc. Mini-Conf. on Expert System Applications in Construction Contract Law, Asian Institute of Technology (AIT), Bangkok, Thailand, 50–67.
Rujirayanyong, T., and Shi, J. J. (2006). “A project-oriented data warehouse for construction.” Autom. Constr., 15(6), 800–807.
Russell, A. D., Chiu, C.-Y., and Korde, T. (2009). “Visual representation of construction management data.” Autom. Constr., 18(8), 1045–1062.
Semple, C., Hartman, F. T., and Jergeas, G. (1994). “Construction claims and disputes: Causes and cost/time overruns.” J. Constr. Eng. Manage., 120(4), 785–795.
Serag, E., Oloufa, A., Malone, L., and Radwan, E. (2010). “Model for quantifying the impact of change orders on project cost for U.S. roadwork construction.” J. Constr. Eng. Manage., 136(9), 1015–1027.
Shumway, R., Richard, A., and Ritti, J. (2004). “New trends and bad results in construction contracts.” Leadersh. Manage. Eng., 4(3), 93–104.
Sim, K. C., and Molnenaar, K. (2000). “Prediction of construction disputes in change issues.” Proc. Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World, ASCE, Reston, VA, 534–542.
Theodoratos, D., and Sellis, T. (1999). “Design data warehouse.” Data Knowl. Eng., 31(3), 279–301.
Thomas, H. R., Smith, G. R., and Mellott, R. E. (1994). “Interpretation of construction contracts.” J. Constr. Eng. Manage., 120(2), 321–336.
Zaneldin, E. K. (2006). “Construction claims in United Arab Emirates: Types, causes, and frequency.” Int. J. Project Manage., 24(5), 453–459.
Information & Authors
Information
Published In
Copyright
© 2013 American Society of Civil Engineers.
History
Received: Sep 26, 2011
Accepted: Sep 18, 2012
Published online: Sep 20, 2012
Published in print: Jun 1, 2013
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.