Abstract

Developing a reliable project cost estimate is a challenge for any state highway agency (SHA), especially at the conceptual stage. A conceptual estimate is defined in this paper as the estimate prepared at the point at which only 30% of the design is complete. This paper describes a statistical approach to producing a reliable conceptual cost estimate when few project design details have been finalized and many assumptions still form the basis of the estimate. This approach used an analysis similar to the program evaluation and review technique (PERT), which is more commonly used in project scheduling, to assign certainty factors to cost estimates. The approach uses a combination of historical bid data for major roadway items whose quantities can be estimated early in the development process and historical percentages for other major components of the project, called allowance and contingency factors. The paper focuses on (1) the methodology developed to analyze the historical bid data; (2) the analysis of 14 highway corridors with 77 projects whose as-bid construction costs were more than $830 million; and (3) a cross-validation of the approach used to validate the accuracy of the predictive model. By using a PERT-type technique, construction costs were accurately predicted at the conceptual stage within ±20%. However, approximately 85% of the corridor costs were accurately predicted within ±15% of the actual cost. The proposed methodology provides a structured and consistent estimating approach that can be used by any SHA that needs to develop total project delivery estimates at the conceptual design stage.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This research was funded by WisDOTWIDOT. The authors thank the WisDOT Regions for their contributions to this research project, both for providing data and for suggesting the initial breakdown structure that was adapted for this study. Many thanks are also extended to the several graduate students at University of Wisconsin, Madison, who contributed to the editing and improvement of this paper.

References

AASHTO Trns*port [Computer software]. AASHTO. Washington, DC.
An, S., Park, U., Kang, K., and Cho, M. (2007). “Application of support vector machines in assessing conceptual cost estimates.” J. Comput. Civ. Eng., 21(4), 259–264.
Anderson, S., Molenaar, K., and Schexnayder, C. (2006). “Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction.” Final Rep. 574, National Cooperative Highway Research Program (NCHRP), Washington, DC.
Byrnes, J. E. (2002). “Best practices for highways project cost estimating.” M.S. thesis, Arizona State Univ., Phoenix.
Chou, J., and O’Connor, J. T. (2007). “Internet-based preliminary highway construction cost estimating database.” J. Autom. Constr., 17(1), 65–74.
Colorado Dept. of Transportation (CDOT). (2000). “Long range cost estimation research project.” CDOT-DTD-R-2000-7, Denver.
Cottrell, W. D. (1999). “Simplified program evaluation and review technique (PERT).” J. Constr. Eng. Manage., 125(1), 16–22.
Eisner, H. (1962). “A generalized network approach to the planning and scheduling of a research project.” Oper. Res., 10(1), 115–125.
Georgia Dept. of Transportation (GDOT). (2007). “Planning level cost estimation study.” 〈http://www.dot.ga.gov/informationcenter/programs/studies/Pages/CostEstimationStudy.aspx〉 (Sep. 13, 2010).
Molenaar, K. R. (2005). “Programmatic cost risk analysis for highway megaprojects.” J. Constr. Eng. Manage., 131(3), 343–353.
Patterson, J. H. (1984). “A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem.” Manage. Sci., 30(7), 854–867.
Peurifoy, R. L. (1975). Construction planning, equipments, and methods, McGraw Hill, New York.
Right-of-Way and Utility Relocation Cost Estimate Tool (RUCEST) [Computer software]. Georgia Department of Transportation. Atlanta, GA.
Roman, D. D. (1962). “The PERT system: An appraisal of program evaluation review technique.” J. Academy Manage., 5(1), 57–65.
Van Slyke, R. M. (1963). “Monte Carlo methods and the PERT problem.” Oper. Res., 11(5), 839–860.
Walton, J. R., and Stevens, J. D. (1997). “Improving conceptual estimating methods using historical cost data.” Transportation Research Record 1575, Transportation Research Board, Washington, DC, 127–131.
Wiest, J. D. (1967). “A heuristic model for scheduling large projects with limited resources.” Manage. Sci., 13(6), B359–B377.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 137Issue 11November 2011
Pages: 942 - 949

History

Received: Nov 20, 2009
Accepted: Jan 14, 2011
Published online: Jan 18, 2011
Published in print: Nov 1, 2011

Permissions

Request permissions for this article.

Authors

Affiliations

Mounir El Asmar, S.M.ASCE [email protected]
Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin, Madison, 2256 Engineering Hall, 1415 Engineering Dr., Madison, WI 53706 (corresponding author). E-mail: [email protected]
Awad S. Hanna, F.ASCE [email protected]
Professor and Chair, Construction Engineering and Management Program, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin, Madison, 2320 Engineering Hall, 1415 Engineering Dr., Madison, WI 53706. E-mail: [email protected]
Gary C. Whited, M.ASCE [email protected]
Program Manager, Construction and Materials Support Center, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin, Madison, 2314 Engineering Hall, 1415 Engineering Dr., Madison, WI 53706. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share