Contractor Performance Evaluation for the Best Value of Superpave Projects
Publication: Journal of Construction Engineering and Management
Volume 136, Issue 5
Abstract
The best-value (BV) procurement process uses other key factors as well as bid price in the evaluation and selection of the best-performing contractor for the job. Contract time, lane rental, warranty, and quality of delivered product are examples of the key factors that indicate the contractor-expected performance. Literature on best value shows a need for analyzing the past performance of the contractor in similar jobs as an indicator of his/her qualification trend. This paper addresses this issue and proposes a methodology to incorporate quality of delivered product in the BV procurement system of asphalt construction. The paper uses past quality control (QC) testing results and utilizes Monte Carlo simulation to estimate the probability that the contractor gets full payment as an indication of qualification trend. The QC data were obtained from the Nebraska Department of Roads for a number of Superpave pavement projects. The results show the possibility of assigning a quality score for the contractor based on the past performance. This paper contributes to the current practice of best value with a new approach of employing QC as part of the selection process.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The writers would like to recognize the NDOR for the provided data and also the contribution of Dr. Scott Schram for helping with the data collection.
References
Abdelrahman, M., Zayed, T., and Elyamany, A. (2008a). “Best-value model based on project specific characteristics.” J. Constr. Eng. Manage., 134(3), 179–188.
Abdelrahman, M., Zayed, T., Hietpas, J., and Elyamany, A. (2008b). “Rational best-value model based on expected performance.” Transp. Res. Rec., 2081, 46–55.
Anderson, S., and Russell, J. (2001). Guidelines for warranty, multi-parameter, and best-value contracting, National Cooperative Highway Research Program, Transportation Research Board, National Research Council, Washington, D.C.
Breakah, T. M., Williams, R. C., Kandil, A., and Shane, J. S. (2007). “Implementing percent within limits for hot mix asphalt.” Mid-Continent Transportation Research Symp., Iowa State University, Ames, Iowa.
Burati, J., Weed, R., Hughes, C., and Hill, H. (2003). “Optimal procedures for quality assurance specifications.” FHWA-RD-02-095, Federal Highway Administration, Washington, D.C.
Cominsky, R. J., Killingsworth, B. M., Anderson, R. M., Anderson, D. A., and Crockford, W. W. (1998). “Quality control and acceptance of Superpave-designed hot mix asphalt.” Rep. No. 409, National Cooperative Highway Research Program, Washington, D.C.
Dorsey, R. (1995). “New paradigms in construction.” Project Delivery Systems for Building Construction Conf., Associated General Constructors of America, Detroit.
Gransberg, D. D., and Ellicott, M. A. (1997). “Best-value contracting criteria.” Journal of Cost Engineering, 39(6), 31–34.
Gransberg, D. D., Koch, J. E., and Molenaar, K. R. (2006). Preparing for design-build projects: A primer for owners, engineers, and contractors, ASCE, Reston, Va.
Gransberg, D. D., and Senadheera, S. P. (1999). “Design-build contract award methods for transportation projects.” J. Transp. Eng., 125(6), 565–567.
Hubbard, D. (2007). How to measure anything: Finding the value of intangibles in business, Wiley, Hoboken, N.J., 46.
Naval Facilities Engineering Command (NAVFAC). (1996). “Instructions for developing request or proposals for source selection design/build projects.” Rep. No. 076, (RAM/SHP) Specification Instruction 00011, Southern Division, Pensacola, Fla.
Nebraska Department of Roads (NDOR). (2005). PaveCARE user’s guide 2.0: Pavement condition assessment and rehabilitation effectiveness, Nebraska Department of Roads, Lincoln, Neb.
Oracle. (2008). “Crystal Ball: Predictive modeling software.” Oracle Corporation, ⟨http://www.decisioneering.com⟩ (Oct. 20, 2008).
Roberts, F., Kandhal, P., Brown, E., Lee, D., and Kennedy, T. (1996). Hot mix asphalt materials, mixture design, and construction, 2nd Ed., NAPA Research and Education Foundation, Lanham, Md.
Schram, S., and Abdelrahman, M. (2008). “Evaluation of Superpave construction quality on low volume roads.” J. Assoc. Asph. Paving Technol., 77, 299–326.
Scott, S., Moenaar, K., Gransberg, D., and Smith, N. (2006). “Best-value procurement methods for highway construction projects.” Project No. 10-61, Transportation Research Board, National Research Council, Washington, D.C.
Transportation Research Board (TRB). (2005). “Glossary of highway quality assurance terms.” Transportation Research Circular No. EC074, Washington, D.C.
U.S. Army Contracting Agency. (2007). Army source selection manual, Office of the Assistant Secretary of the Army, Acquisition Logistics and Technology, Washington, D.C., ⟨http://www.aca-nrhq.army.mil⟩ (Oct. 27, 2008).
U.S. Postal Service. (2005). Handbook P-2: Design and construction purchasing practices, Purchasing and Materials, United States Postal Service, Washington, D.C., ⟨http://www.usps.com/cpim/ftp/hand/p2/tc.pdf⟩ (Oct. 27, 2008).
Zaniewski, J. P., and Adams, T. (2005). Evaluation of quality control parameters for Superpave hot mix asphalt, Asphalt Technology Program, West Virginia University, Morgantown, W.Va.
Information & Authors
Information
Published In
Copyright
© 2010 ASCE.
History
Received: Mar 3, 2009
Accepted: Sep 29, 2009
Published online: Apr 15, 2010
Published in print: May 2010
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.