TECHNICAL PAPERS
Apr 15, 2010

Benchmarking Framework to Measure Extent of ICT Adoption for Building Project Management

Publication: Journal of Construction Engineering and Management
Volume 136, Issue 5

Abstract

This paper discusses a component of the research study conducted to provide construction organizations with a generic benchmarking framework to assess their extent of information communication technology (ICT) adoption for building project management processes. It defines benchmarking and discusses objectives of the required benchmarking framework and development of the framework. The study focused on ICT adoption by small and medium enterprises (SMEs) in the construction industry and with respect to SMEs it is important to understand processes, their indicators, and measures in the local context. Structure of the suggested benchmarking framework has been derived after extensive literature survey and a questionnaire survey conducted in the Indian construction industry. The suggested benchmarking process is an iterative process divided into four stages. It can be implemented at organization and industry levels for rating the construction organizations for ICT adoption and performance measurement. The framework has a generic structure and can be generalized and applied for other countries with due considerations.

Get full access to this article

View all available purchase options and get full access to this article.

References

Ahuja, V., Yang, J., and Shankar, R. (2009). “Study of ICT adoption for building project management in the Indian construction industry.” Autom. Constr., 18(4), 415–423.
Ahuja, V., Yang, J., Skitmore, M., and Shankar, R. (2010). “An empirical test of causal relationships of factors affecting ICT adoption for building project management—An Indian SME case study.” Constr. Innov.: Inf., Process, Manage. 10(2), accepted for publication.
Back, W. E., and Bell, L. C. (1995). “Quantifying process benefits of electronic data management technologies.” J. Constr. Eng. Manage., 121(4), 415–421.
Back, W. E., and Moreau, K. A. (2000). “Cost and schedule impacts of information management on EPC Process.” J. Manage. Eng., 16(2), 59–70.
Bendell, T., Boulter, L., and Goodstadt, P. (1998). Benchmarking for competitive advantage, 2nd Ed., Pitman, London.
Betts, M. (1999). Strategic management of IT in construction, Blackwell Science, Malden, Mass.
Bogan, C., and English, M. J. (1994). Benchmarking for best practices: Winning through innovative adaptation, McGraw-Hill, New York.
Brewer, G., Gajendran, T., McCann, J., and Chen, S. E. (2003). “Creating a benchmarking service to measure ICT uptake for the Australian construction industry.” Construction Research Council for Construction Innovation Rep., CRC CI, Australia, ⟨www.construction-innovation.info/⟩ (Aug. 16, 2006).
Camp, R. C. (1989a). “Benchmarking: The search for best practices that lead to superior performance. Part III: Why benchmark?” Qual. Prog., 22(3), 76–82.
Camp, R. C. (1989b). Benchmarking: The Search for industry best practices that lead to superior performance, ASQC Quality, Milwaukee.
Clark, A. M., Atkin, B. L., Betts, M. P., and Smith, D. A. (1999). “Benchmarking the use of IT to support supplier management in construction.” Electron J. Inf. Technol. Constr., 4, 1–16.
Construct IT Center of Excellence. (1998). “Benchmarking best practice report: Cost and change management.” Construct IT Initiative Rep., Salford, U.K.
“Constructing excellence.” (2004). ⟨http://www.constructingexcellence.org.uk⟩ (Mar. 16, 2004).
Costa, D. B., Formoso, C. T., Kagioglou, M., Alarcon, L. F., and Caldas, C. H. (2006). “Benchmarking initiatives in the construction industry: Lessons learned and improvement opportunities.” J. Manage. Eng., 22(4), 158–167.
Dainty, A. R. J., Briscoe, G. H., and Millett, S. J. (2001). “New perspectives on construction supply chain integration.” Int. J. Inf. Sys. Supply Chain Manage., 6(4), 163–173.
Davis, G. B., and Olson, M. H. (1984). Management information systems: Conceptual foundations, structure, and development, 2nd Ed., McGraw-Hill, Singapore.
Fong, S. W., Cheng, E. W. L., and Ho, D. C. K. (1998). “Benchmarking: A general reading for management practitioners.” Manage. Decis., 36(6), 407–418.
Fowler, A., and Walsh, M. (1999). “Conflicting perceptions of success in an information systems project.” Int. J. Proj. Manage., 17(1), 1–10.
Garvin, D. A. (1993). “Building a learning organization.” Harvard Bus. Rev., 71(4), 78–91.
Hamilton, M. R., and Gibson, G. E., Jr. (1996). “Benchmarking preproject planning effort.” J. Manage. Eng., 12(2), 25–33.
Hegazy, T., and Ersahin, T. (2001). “Simplified spreadsheet solutions I—Subcontractor information system.” J. Constr. Eng. Manage., 127(6), 461–468.
Hinton, M., Francis, G., and Holloway, J. (2000). “Best practice benchmarking in the UK.” Benchmark, 7(1), 52–61.
Huang, C., Fisher, N., and Broyd, T. (2002). “Development of a triangular TPC model to support adoption of construction integrated system.” Proc., ARCOM 18th Annual Conf., Vol. 2, Univ. of Northumbria, U.K., 427–438.
Lee, S. H., Thomas, S. R., and Tucker, R. L. (2005). “Web-based benchmarking system for the construction industry.” J. Constr. Eng. Manage., 131(7), 790–798.
Leuven, A. R., and Voordijk, H. (2001). “Enterprise resource planning in construction: An evaluation of recent implementations.” Proc., ARCOM 17th Annual Conf., Vol. 1, Univ. of Salford, U.K., 159–168.
Lewis, J. C., and Naim, M. M. (1995). “Benchmarking of aftermarket supply chains.” Prod. Plan. Control, 6(3), 258–269.
Love, P. E. D., Irani, Z., and Edwards, D. J. (2004). “Industry-centric benchmarking of information technology benefits, costs and risks for small-to-medium sized enterprises in construction.” Autom. Constr., 13(4), 507–524.
Love, P. E. D., and Smith, J. (2003). “Benchmarking, benchaction, and benchlearning: Rework mitigation in projects.” J. Manage. Eng., 19(4), 147–159.
Marakas, G. M. (2003). Decision support systems in the 21st century, 2nd Ed., Pearson Education, Singapore.
Milis, K., and Mercken, R. (2004). “The use of the balanced scorecard for the evaluation of information and communication technology projects.” Int. J. Proj. Manage., 22(2), 87–97.
Mittelstaedt, R. E., Jr. (1992). “Benchmarking: How to learn from best-in-class practices.” Natl. Prod. Rev., 11(3), 301–315.
Nitithamyong, P., and Skibniewski, M. J. (2006). “Success/failure factors and performance measures of web-based construction project management systems: Professionals’ viewpoint.” J. Constr. Eng. Manage., 132(1), 80–87.
Ramírez, R. R., Alarcon, L. F. C., and Knights, P. (2004). “Benchmarking system for evaluating management practices in the construction industry.” J. Manage. Eng., 20(3), 110–117.
Ribeiro, F. L., and Lopes, J. (2002). “An approach to E-Business in construction.” Proc., ARCOM 18th Annual Conf., Vol. 2, Univ. of Northumbria, U.K., 475–484.
Shank, J. K., and Govindarajan, X. (1992). “Strategic cost analysis of technological investments.” Sloan Manage. Rev., 34(1), 39–51.
Skibniewski, M. J., and Zhang, L. (2005). “Economic feasibility of web-based project management solutions.” Int. J. Const. Mgmt., 5(1), 103–121.
Stewart, R. A., and Mohamed, S. (2001). “Utilizing the balanced scorecard for IT/IS performance evaluation in construction.” Constr. Innovation, 1, 147–163.
Stewart, R. A., and Mohamed, S. (2004). “Evaluating web-based project information management in construction: Capturing the long-term value creation process.” Autom. Constr., 13, 469–479.
Sturges, J., and Bates, M. (2001). “Data integration and construction contracting: Barriers to implementation.” Proc., ARCOM 17th Annual Conf., Vol. 1, Univ. of Salford, U.K., 179–187.
Sushil. (2000). “SAP-LAP models of inquiry.” Manage. Decis., 38(5), 347–353.
Vaziri, H. K. (1992). “Using competitive benchmarking to set goals.” Qual. Prog., 25(10), 81–85.
Yu, J. H., Lee, H. S., and Kim, W. (2006). “Evaluation model for information systems benefits in construction management processes.” J. Constr. Eng. Manage., 132(10), 1114–1121.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 136Issue 5May 2010
Pages: 538 - 545

History

Received: Apr 20, 2008
Accepted: Sep 24, 2009
Published online: Apr 15, 2010
Published in print: May 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Vanita Ahuja [email protected]
Project Management Consultant, 204 Sector A, Pocket C, Vasant Kunj, New Delhi, India 110070 (corresponding author). E-mail: [email protected]
Professor, Faculty of Built Environment and Engineering, Queensland Univ. of Technology, Brisbane Q4001, Australia. E-mail: [email protected]
Ravi Shankar [email protected]
Professor, Dept. of Management Studies, Indian Institute of Technology Delhi, New Delhi, India 110016. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share