Improved Baseline Productivity Analysis Technique

This article has been corrected.
VIEW CORRECTION
Publication: Journal of Construction Engineering and Management
Volume 136, Issue 3

Abstract

Previous studies have aimed to develop effective methods to derive baseline productivity (BP) for labor-intensive activities in construction sites. However, there are two different definitions of BPs: one is defined as a performance benchmark of best practice and the other as a standard reflecting a contractor’s normal operating performance. It is necessary to clarify the difference between the two definitions and their corresponding BPs. This research introduces data envelopment analysis (DEA) as a new method for deriving BP and compares DEA with the other four BP deriving methods. DEA is concluded as the best method in terms of objectivity, effectiveness, and consistency to find BP that represents the best performance a contractor can possibly achieve. With the capability of deriving productivities of multi-input and multi-output activities, the proposed DEA has raised the scale of labor productivity from the level of single factor productivity to total factor productivity which will help construction researchers and managers to evaluate performances of interests in a much more effective way.

Get full access to this article

View all available purchase options and get full access to this article.

References

Banker, R. D., Charnes, A., and Cooper, W. W. (1984). “Some models for estimating technical and scale inefficiencies in data envelopment analysis.” Manage. Sci., 30(9), 1078–1092.
Cariaga, I., El-Diraby, T., and Osman, H. (2007). “Integrating Value analysis and quality function deployment for evaluating design alternatives.” J. Constr. Eng. Manage., 133(10), 761–770.
Charnes, A., Cooper, W. W., and Rhodes, E. (1978). “Measuring the efficiency of decision making units.” Eur. J. Oper. Res., 2(6), 429–444.
Charnes, A., Cooper, W. W., and Rhodes, E. (1981). “Evaluating program and managerial efficiency: An application of data development analysis to program follow through.” Manage. Sci., 27, 668–697.
Choi, J., and Minshin, R. E. (2006). “Workflow management and productivity control for asphalt pavement operations.” Can. J. Civ. Eng., 33(8), 1039–1049.
Cooper, W. W., Seiford, L. M., and Tone, K. (2000). Data envelopment analysis: a comprehensive text with models, applications, references, and DEA-Solver software, Kluwer Academic, Boston.
Construction Task Force (1998). “Rethinking construction.” Dept. of Trade and Industry, U.K.
El-Mashaleh, M., Minchin, R. E., and O’Brien, W. J. (2007). “Management of construction firm performance using benchmarking.” J. Manage. Eng., 23(1), 10–17.
El-Mashaleh, M., O’Brien, W. J., and Minchin, R. E. (2006). “Firm performance and information technology utilization in the construction industry.” J. Constr. Eng. Manage., 132(5), 499–507.
Farrell, M. J. (1957). “The measurement of productive efficiency.” J. R. Stat. Soc. Ser. A. Gen., 120(3), 253–290.
Gulezian, R., and Samelian, F. (2003). “Baseline determination in construction labor productivity-loss claims.” J. Manage. Eng., 19(4), 160–165.
Huang, H. M. (2008). “Improved analyses of construction baseline productivity.” Ph.D. thesis, National Kaohsiung First Univ. of Science and Technology. Kaohsiung, Taiwan, ⟨http://ethesys.nkfust.edu.tw/ETD-db/⟩ (Jan. 16, 2010).
Ibbs, W., and Liu, M. (2005). “Improved measured mile analysis technique.” J. Constr. Eng. Manage., 131(12), 1249–1256.
McCabe, B., Tran, V., and Ramani, J. (2005). “Construction prequalification using data envelopment analysis.” Can. J. Civ. Eng., 32, 183–193.
Neave, H. R., and Wheeler, D. J. (1996). “Shewhart’s charts and the probability approach.” Proc., 9th Annual Conf. of the British Deming Association, SPC, Knoxville, Tenn., www.spcpress.com/pdf/Wheeler_Neave.pdf (Accessed Jan. 16, 2010).
Sanvido, V. E. (1988). “Conceptual construction process model.” J. Constr. Eng. Manage., 114(2), 294–312.
Shewhart, W. A. (1931). Economic control of quality of manufactured product, Van Nostrand Reinhold, New York (republished in 1980 by the American Society for Quality, Milwaukee).
Sonmez, R., and Rowings, J. E. (1998). “Construction labor productivity modeling with neural networks.” J. Constr. Eng. Manage., 124(6), 498–504.
Taha, H. A. (2002). Operations research: An introduction, 7th Ed., Prentice Hall, Upper Saddle River, N.J.
Thomas, H. R., and Kramer, D. F. (1988). “The manual of construction productivity measurement and performance evaluation.” Source document no. 35, Construction Industry Institute, Austin, Tex.
Thomas, H. R., Maloney, W. F., Smith, G. R., Sanders, S. R., Horner, R. M. W., and Handa, V. K. (1990). “ Modeling construction labor productivity.” J. Constr. Eng. Manage., 116(4), 705–726.
Thomas, H. R., and Napolitan, C. L. (1995). “Quantitative effects of construction changes on labor productivity.” J. Constr. Eng. Manage., 121(3), 290–296.
Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). “Loss of labor productivity due to delivery method and weather.” J. Constr. Eng. Manage., 125(1), 39–46.
Thomas, H. R., and Sakarcan, A. S. (1994). “Forecasting labor productivity using factor model.” J. Constr. Eng. Manage., 120(1), 228–239.
Thomas, H. R., and Sanvido, V. E. (2000). “Role of the fabricator in labor productivity.” J. Constr. Eng. Manage., 126(5), 358–365.
Thomas, H. R., and Yiakoumis, I. (1987). “Factor model of construction productivity.” J. Constr. Eng. Manage., 113(4), 623–639.
Thomas, H. R., and Zavrski, I. (1999). “Construction baseline productivity: Theory and practice.” J. Constr. Eng. Manage., 125(5), 295–303.
Xue, X., Shen, Q., Wang, Y., and Lu, J. (2008). “Measuring the productivity of the construction industry in China by using DEA-based malmquist productivity indices.” J. Constr. Eng. Manage., 134(1), 64–71.
Zink, D. A. (1986). “The measured mile: Proving construction inefficiency costs.” Coast. Eng., 28(4), 19–21.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 136Issue 3March 2010
Pages: 367 - 376

History

Received: Nov 3, 2008
Accepted: Jul 16, 2009
Published online: Aug 10, 2009
Published in print: Mar 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Chien-Liang Lin, Ph.D. [email protected]
Assistant Professor, Dept. of Construction Engineering, National Kaohsiung First Univ. of Science and Technology, 2 Jhuo-yue Rd. Nan-zih, Kaohsiung 811, Taiwan (corresponding author). E-mail: [email protected]
Hong-Ming Huang, Ph.D.
Senior Project Manager, United Steel Engineering and Construction Corp., 1 Zhong-gang Rd., Shiao-gang, Kaohsiung 812, Taiwan.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share