Duties and Responsibilities of Construction Managers: Perceptions of Parties Involved in Construction

Publication: Journal of Construction Engineering and Management
Volume 135, Issue 12

Abstract

This paper reports the findings of a study conducted by researchers at Illinois Institute of Technology under the direction and supervision of the ASCE Committee on Management Practices in Construction to investigate the expectations of the parties involved in the construction process, including designers, owners, general contractors, subcontractors, construction managers, and educators, relative to construction managers’ duties. The findings suggest that while there is some consensus among parties to a construction project relative to CM duties particularly in the construction phase, there is also some disagreement, most of which appear to be between contractors and designers. Most disagreements are related to CM duties performed in the bidding and postconstruction phases of projects.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers are thankful for the guidance, patience, and encouragement provided by the Committee on Management Practices in Construction (MPIC) of the ASCE Construction Institute. At the time this research was conducted, the members of the Committee on MPIC included: Melbourne Garber (Chairman), Robert Silman and Associates, New York; John E. Schaufelberger (Vice Chairman), Univ. of Washington, Seattle; Raymond R. Crawford (Secretary), Parsons Brinckerhoff Construction Services, Herndon, Va.; David S. Adams, Gannett Fleming, Inc., Roseville, California; David Arditi, Illinois Institute of Technology, Chicago, Illinois; Brian A. Danley, Harris and Associates, Concord, Calif.; Cary M. Joiner, Malise Associates, Inc., Detroit, Michigan; Joseph J. Kracum, Kracum Resources LLC., Glenwood Springs, Colorado; Frank L. Lynch, Parsons Brinckerhoff Construction Services, Locust Grove, Va.; Matthew M. McDole, E-470 Public Highway Authority, Aurora, Colo.; Terry W. Micheau, S.P.U.R., San Francisco; Edward F. Reese, PDCOM Consultancy, Inc., Scottsdale, Arizona; David Tiberi, ATHALYE Consulting Engineering Services, Lake Forest, Calif.; and Peter Tillson, ARUP, New York. The writers also gratefully acknowledge the financial support of ASCE and CMAA, in particular, the help of Marvin Oey of ASCE and Bruce d’Agostino of CMAA.

References

American Institute of Architects (AIA). (1992). “Standard for of agreement between owner and construction manager.” Rep. No. B-801, AIA, Washington, D.C.
Associated General Contractors of America (AGC). (1997). “Standard form of agreement between owner and construction manager.” Rep. No. 8, AGC, Arlington, Va.
American Society of Civil Engineers (ASCE). (2008). Civil engineering body of knowledge for the 21st century preparing for civil engineer for the future, 2nd edition, prepared by the Body of Knowledge Committee of the Committee on Academic Prerequisites for Professional Practice of the American Society of Civil Engineers, Reston, Va.
Barrie, D. S. (1979). “The trade contractors’ view of construction management.” J. Constr. Div., 105, 381–387.
Barrie, D. S., and Paulson, B. C., Jr. (1992). Professional construction management, 3rd Ed., McGraw-Hill, New York.
Clough, R. H., Sears, G. A., and Sears, S. K. (2005). Construction contracting, 7th Ed., Wiley, New York.
Construction Management Association of America (CMAA). (1993). Standard CM services and practice, 2nd Ed., Construction Management Association of America, Reston, Va.
Construction Management Association of America (CMAA). (1999). “Standard form of agreement between owner and construction manager.” Rep. No. A-1, CMMA, McLean, Va.
Fisk, E. R., and Reynolds, W. D. (2006). Construction project administration, 8th Ed., Prentice-Hall, Upper Saddle River, N.J.
Gilbreath, R. D. (1992). Managing construction contracts, 2nd Ed., Wiley, New York.
Gould, F. E. (2002). Managing the construction process, 2nd Ed., Prentice-Hall, Upper Saddle River, N.J.
Halpin, D. W., and Woodhead, R. W. (1998). Construction management, 2nd Ed., Wiley, New York.
Haltenhoff, C. E. (1999). The CM contracting system, Prentice-Hall, Upper Saddle River, N.J.
Hinze, J. (2000). Construction contracts, 2nd Ed., McGraw-Hill, New York.
Liebing, R. W. (1998). Construction contract administration, Prentice-Hall, Upper Saddle River, N.J.
Russell, J. S. and Stouffer, W. B. (2005). “Survey of the national civil engineering curriculum.” J. Profl. Issues Eng. Educ. Pract., ASCE, 131(2), 118–128.
Tatum, C. B., Gans, G. M., and Harper, G. T. (1980). “Professional CM: The architect/engineer’s viewpoint.” J. Constr. Div., 106, 141–153.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 135Issue 12December 2009
Pages: 1370 - 1374

History

Received: Mar 8, 2008
Accepted: Jun 30, 2009
Published online: Nov 13, 2009
Published in print: Dec 2009

Permissions

Request permissions for this article.

Authors

Affiliations

David Arditi [email protected]
Professor, Dept. of Civil and Architectural Engineering, Illinois Institute of Technology, Chicago, IL 60616 (corresponding author). E-mail: [email protected]
Dumrong Ongkasuwan [email protected]
Project Control Specialist, Management Concepts Systems and Services, 281 Hwy 79, Suite 207, Morganville, NJ 07751. E-mail: [email protected]
The Committee on Management Practices in Construction (MPIC) of the ASCE Construction Institute

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share