Cost and Schedule Monitoring of Industrial Building Projects: Case Study

Publication: Journal of Construction Engineering and Management
Volume 135, Issue 9

Abstract

Performance measurement is a helpful tool for taking corrective actions and controlling a project as far as this enables accurate time and cost forecasts during the first stages of the construction effort when the management team still has opportunities to make adjustments. This paper overcomes the dilemma of practicability and predictability of traditional estimates at completion based on early progress measurement by presenting the empirical results from the construction project of an industrial facility. The case may be a reference practice for assessing time and cost performance measurement of any building, whose layout can be reasonably partitioned into repeatable portions. In such circumstances, an effectively-managed traditional earned value method and appropriate metrics for computing performance provide project managers with accurate forecasts as useful tools for successful project management and control.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This study is part of a review of construction best practices in Italy by the Engineering Systems Research Group of Politecnico di Torino. For this case, the writers acknowledge the owner, Fiat Partecipazioni S.p.A., for permission of publication and the construction manager IdEst S.r.l. for support.

References

Christensen, D. S. (1996). “Project advocacy and the estimate at completion problem.” J. Cost Analysis Management, Spring, 61–72.
Christensen, D. S. (1999). “Using the earned value cost management report to evaluate the contractor’s estimate at completion.” Acquisition Rev. J., Acquisition University DAU Publications, 283–295.
Christensen, D. S., Antolini, R. C., and McKinney, J. W. (1995). “A review of estimate at completion research.” J. Cost Analysis Management, Spring, 41–62.
Construction Industry Institute (CII). (2004). Project control for construction, CII, Austin, Tex.
Eldin, N. N. (1989). “Measurement of work progress: Quantitative technique.” J. Constr. Eng. Manage., 115(3), 462–474.
Fleming, Q. W. (1991). “Earned schedule in action.” Cost/schedule control systems criteria: The management guide to C/SCSC, K. Henderson, ed., Probus, Chicago.
Henderson, K. (2005). “Earned schedule in action.” ⟨http://sydney.pmichapters-australia.org.au/programs/customer/v_filedown.asp?P=31&FID=789354132&ERF=n&⟩ (June 24, 2008).
Hendrickson, C. (1998). “9. Construction planning.” ⟨http://pmbook.ce.cmu.edu/09_Construction_Planning.html⟩ (Aug. 29, 2008).
Jung, Y., and Woo, S. (2004). “Flexible work breakdown structure for integrated cost and schedule control.” J. Constr. Eng. Manage., 130(5), 616–625.
Lipke, W. (2005). “Connecting earned value to the schedule.” Crosstalk: J. Defense Software Engineering, November 2006, 26–30.
Nepal, M. P., Park, M., and Son, B. (2006). “Effects of schedule pressure on construction performance.” J. Constr. Eng. Manage., 132(2), 182–188.
Oberlender, G. D. (1993). Project management for engineering and construction, McGraw-Hill, New York.
Project Management Institute. (2005). Practice standard for earned value management, McGraw-Hill, Newtown Square, Pa.
Riggs, L. S. (2004). “Cost and schedule control in industrial construction.” CII, Austin, Tex.
Ritz, G. J. (1994). Total construction project management, McGraw-Hill, New York.
Sterman, J. D. (1992). “System dynamic modeling for project management.” ⟨http://web.mit.edu/jsterman/www/SDG/project.html⟩ (Mar. 10, 2008).
U.S. Dept. of Energy (DoE). (1980). “Cost and schedule control systems criteria for contract performance measurement. Implementation guide.” DoE, MA-0087, May.
Weisstein, E. W. (1999). “Logistic equation.” ⟨http://mathworld.wolfram.com/LogisticEquation.html⟩ (Sept. 1, 2008).
Winch, G. M. (2002). Managing construction projects, Blackwell, Oxford, U.K.
Woodward, J. F. (1997). Construction project management getting it right first time, Thomas Telford, London.
Yang, Y. C., Park, C. J., Kim, J. H., and Kim, J. J. (2007). “Management of daily progress in a construction project of multiple apartment buildings.” J. Constr. Eng. Manage., 133(3), 242–253.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 135Issue 9September 2009
Pages: 853 - 862

History

Received: Jul 1, 2008
Accepted: Feb 17, 2009
Published online: Apr 30, 2009
Published in print: Sep 2009

Permissions

Request permissions for this article.

Authors

Affiliations

Alberto De Marco, Ph.D. [email protected]
Assistant Professor, Dept. of Production System and Business Economics, Politecnico di Torino, corso Duca degli Abruzzi 24, 10129 Torino, Italy (corresponding author). E-mail: [email protected]
Diego Briccarello
Project Controller, IdEst S.r.l., corso San Maurizio 81, 10124 Torino, Italy.
Carlo Rafele
Associate Professor, Dept. of Production System and Business Economics, Politecnico di Torino, corso Duca degli Abruzzi 24, 10129 Torino, Italy.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share