Cost and Schedule Monitoring of Industrial Building Projects: Case Study
Publication: Journal of Construction Engineering and Management
Volume 135, Issue 9
Abstract
Performance measurement is a helpful tool for taking corrective actions and controlling a project as far as this enables accurate time and cost forecasts during the first stages of the construction effort when the management team still has opportunities to make adjustments. This paper overcomes the dilemma of practicability and predictability of traditional estimates at completion based on early progress measurement by presenting the empirical results from the construction project of an industrial facility. The case may be a reference practice for assessing time and cost performance measurement of any building, whose layout can be reasonably partitioned into repeatable portions. In such circumstances, an effectively-managed traditional earned value method and appropriate metrics for computing performance provide project managers with accurate forecasts as useful tools for successful project management and control.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This study is part of a review of construction best practices in Italy by the Engineering Systems Research Group of Politecnico di Torino. For this case, the writers acknowledge the owner, Fiat Partecipazioni S.p.A., for permission of publication and the construction manager IdEst S.r.l. for support.
References
Christensen, D. S. (1996). “Project advocacy and the estimate at completion problem.” J. Cost Analysis Management, Spring, 61–72.
Christensen, D. S. (1999). “Using the earned value cost management report to evaluate the contractor’s estimate at completion.” Acquisition Rev. J., Acquisition University DAU Publications, 283–295.
Christensen, D. S., Antolini, R. C., and McKinney, J. W. (1995). “A review of estimate at completion research.” J. Cost Analysis Management, Spring, 41–62.
Construction Industry Institute (CII). (2004). Project control for construction, CII, Austin, Tex.
Eldin, N. N. (1989). “Measurement of work progress: Quantitative technique.” J. Constr. Eng. Manage., 115(3), 462–474.
Fleming, Q. W. (1991). “Earned schedule in action.” Cost/schedule control systems criteria: The management guide to C/SCSC, K. Henderson, ed., Probus, Chicago.
Henderson, K. (2005). “Earned schedule in action.” ⟨http://sydney.pmichapters-australia.org.au/programs/customer/v_filedown.asp?P=31&FID=789354132&ERF=n&⟩ (June 24, 2008).
Hendrickson, C. (1998). “9. Construction planning.” ⟨http://pmbook.ce.cmu.edu/09_Construction_Planning.html⟩ (Aug. 29, 2008).
Jung, Y., and Woo, S. (2004). “Flexible work breakdown structure for integrated cost and schedule control.” J. Constr. Eng. Manage., 130(5), 616–625.
Lipke, W. (2005). “Connecting earned value to the schedule.” Crosstalk: J. Defense Software Engineering, November 2006, 26–30.
Nepal, M. P., Park, M., and Son, B. (2006). “Effects of schedule pressure on construction performance.” J. Constr. Eng. Manage., 132(2), 182–188.
Oberlender, G. D. (1993). Project management for engineering and construction, McGraw-Hill, New York.
Project Management Institute. (2005). Practice standard for earned value management, McGraw-Hill, Newtown Square, Pa.
Riggs, L. S. (2004). “Cost and schedule control in industrial construction.” CII, Austin, Tex.
Ritz, G. J. (1994). Total construction project management, McGraw-Hill, New York.
Sterman, J. D. (1992). “System dynamic modeling for project management.” ⟨http://web.mit.edu/jsterman/www/SDG/project.html⟩ (Mar. 10, 2008).
U.S. Dept. of Energy (DoE). (1980). “Cost and schedule control systems criteria for contract performance measurement. Implementation guide.” DoE, MA-0087, May.
Weisstein, E. W. (1999). “Logistic equation.” ⟨http://mathworld.wolfram.com/LogisticEquation.html⟩ (Sept. 1, 2008).
Winch, G. M. (2002). Managing construction projects, Blackwell, Oxford, U.K.
Woodward, J. F. (1997). Construction project management getting it right first time, Thomas Telford, London.
Yang, Y. C., Park, C. J., Kim, J. H., and Kim, J. J. (2007). “Management of daily progress in a construction project of multiple apartment buildings.” J. Constr. Eng. Manage., 133(3), 242–253.
Information & Authors
Information
Published In
Copyright
© 2009 ASCE.
History
Received: Jul 1, 2008
Accepted: Feb 17, 2009
Published online: Apr 30, 2009
Published in print: Sep 2009
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.