Abstract

Past project data sources provide key information for construction cost estimators. Previous research studies show that relying only on one’s own experience during estimation results in estimators’ bias. Having and referring to historical databases, containing objective information on what happened in past projects, are essential for reducing estimators’ biases. The first step toward development of useful project history databases is to understand what information estimators require from past projects. The research described in this paper targets estimators’ information needs identified through interviews, brainstorming sessions, task analyses, and card games conducted with estimators with different experience levels and specialized in heavy/civil and commercial construction projects, and exploration of historical and standard databases available in companies to determine what is being currently represented. Findings show that estimators need contextual information, depicting the conditions under which specific production rates were achieved, so that they can identify which production rate would be more realistic to use during the production rate estimation of an activity in a new bid. Comparison of the contextual information needs identified in this research with information items available in historical data sources (such as company cost reports, RSMeans, previous studies) highlighted some gaps and important opportunities for improvements in those sources. The identified contextual information items are significant for practitioners in developing ways to augment their existing project history databases to make them more beneficial for estimators.

Get full access to this article

View all available purchase options and get full access to this article.

References

Akbas, R. (2003). “Geometry-based modeling and simulation of construction processes.” Ph.D. thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Calif.
Bennett, P. D. (1990). “A case study of the validity of the daily crew-based productivity measurements.” MS thesis, Dept. of Civil Engineering, Pennsylvania State Univ., Pa.
Burati, J. L., and Farrington, J. J. (1987). “Cost of quality deviations in design and construction.” Rep. No. 29, Construction Industry Inst. (CII), Univ. of Texas at Austin, Tex.
Burkhart, A., Touran, A., and Qabbani, Z. (1987). “Repeating formwork greatly reduces costs.” Conc. Constr., 32(10), 853–855.
Chao, L. C., and Skibniewski, M. J. (1994). “Estimating construction productivity: Neural network based approach.” J. Comput. Civ. Eng., 8(2), 234–251.
Chau, K. W., Cao, Y., Anson, M., and Zhang, J. (2003). “Integration of data warehouse into knowledge-based system on construction management decision making.” Hong Kong Inst. Engineers, 10(1), 8–13.
Choy, E., and Ruwanpura, J. Y. (2005). “Situation based modeling for construction productivity.” Proc., Construction Research Congress, San Diego, ASCE, Reston, Va., 662–666.
Ezeldin, A. S., and Sharara, L. M. (2006). “Neural networks for estimating the productivity of concreting activities.” J. Constr. Eng. Manage., 132(6), 650–656.
Fan, H., Kim, H., and Zaiane, O. R. (2006). “Data warehousing for construction equipment management.” Can. J. Civ. Eng., 33(12), 1480–1489.
Gurfinkel, M., Gurcan, G., Dmitry, V., and Foss, M. M. (2006). “Historical data provide low-cost estimating tool.” Oil Gas J., 104(43), 64–68.
Hanna, A. S., and Sanvido, V. (1990). “Interactive vertical formwork selection system.” Concr. Int., 12(4), 26–32.
Herbsman, Z., and Ellis, R. (1990). “Research of factors influencing construction productivity.” Constr. Manage. Econom., 8(1), 49–61.
Kannan, G. (1999). “A methodology for the development of a production experience database for earthmoving operations using automated data collection.” Ph.D. thesis, Virginia Polytechnic Institute and State Univ., Va.
Kartam, N. (1996). “Making effective use of construction lessons learned in project life cycle.” J. Constr. Eng. Manage., 122(1), 14–20.
Kidder, L. H., and Judd, C. M. (1986). Research methods in social relations, 5th Ed., Hold, Rinehart, and Winston Inc., Orlando, Fla., 53–55.
Kiziltas, S., and Akinci, B. (2008). “An automated approach for generating integrated model-based representations of construction project histories.” Proc., 12th International Conference on Computing in Civil and Building Engineering (ICCCBE-XII), Beijing, ASCE, Reston, Va., 1–8.
Kiziltas, S., Akinci, B., and Gonzalez, C.(2008). “Understanding differences in information needs of expert and novice estimators from project histories.” Proc., Construction Research Congress 2007, Grand Bahama Island, Bahamas, ASCE, Reston, Va.
Kiziltas, S., Pradhan, A., and Akinci, B. (2006). “Developing integrated project histories by leveraging multi-sensor data fusion.” Proc., Int. Conf. on Computing in Civil and Building Engineering, Montreal, ASCE, Reston, Va., 3354–3363.
Koehn, E., and Brown, G. (1985). “Climatic effect on construction.” J. Constr. Eng. Manage., 111(2), 129–137.
Liberda, M., Ruwanpura, J. Y., and Jergeas, G. (2003). “Construction productivity improvement: A study of human, managerial and external factors.” Proc., ASCE Construction Research Congress, Honolulu, ASCE, Reston, Va.
Makulsawatudom, A., and Emsley, M. (2003). “Factors affecting the productivity of the construction industry in Thailand: The foremen’s perception.” Proc., ASCE Construction Research Congress, Honolulu, ASCE, Reston, Va.
Ovararin, N., and Popescu, C. (2001). “Field factors affecting masonry productivity.” AACE Int. Trans., 2001, ES91-97.
Paek, J. H. (1993). “Common mistakes in construction cost estimation and their lessons.” Cost Eng., 35(6), 29–33.
Peurifoy, R. L. (1979). Construction planning, equipment and methods, 3rd Ed., McGraw-Hill, New York.
Picken, D. H., and Mak, S. (2001). “Risk analysis in cost planning and its effect on efficiency in capital cost budgeting.” Logist. Inf. Manag., 14(5/6), 318–329.
Portas, J., and AbouRizk, S. (1997). “Neural network model for estimating construction productivity.” J. Constr. Eng. Manage., 123(4), 399–410.
Qabbani, Z. S. (1987). “Formwork economy and productivity analysis.” Rep. Prepared for the Univ. of Colorado at Boulder, Boulder, Colo.
Rau, N. A. (1988). “Management of productivity in construction.” J. Inst. Eng. (India), 69, 113–116.
RSMeans. (2005). Building construction cost data, 63rd Ed., RSMeans, Mass.
Russell, A. (1993). “Computerized daily site reporting.” J. Constr. Eng. Manage., 119(2), 385–402.
Shi, J. (1999). “A neural network based system for analyzing earth-moving operations.” Constr. Manage. Econom., 17(4), 463–474.
Smith, G. R., and Hanna, A. S. (1993). “Factors influencing formwork productivity.” Can. J. Civ. Eng., 20(1), 144–153.
Smith, S. D. (1999). “Earthmoving productivity estimation using linear regression techniques.” J. Constr. Eng. Manage., 125(3), 133–141.
Soibelman, L., Liu, L. Y., Kirby, J. G., East, E. W., Caldas, C. H., and Lin, K. (2003). “Design review checking system with corporate LL.” J. Constr. Eng. Manage., 129(5), 475–484.
Staub-French, S., Fisher, M., Kunz, J., and Paulson, B. (2003). “A generic feature-driven activity-based cost estimation process.” Adv. Eng. Inf., 17(1), 23–39.
Thomas, R., and Zavrski, I. (1999). “Construction baseline productivity: Theory and practice.” J. Constr. Eng. Manage., 125(5), 295–303.
Touran, A. (1988). “Concrete formwork: Constructability and difficulties.” Civ. Eng. Pract., 3(2), 81–88.
Yin, R. (2003). Case study research: design and methods, 3rd Ed., Sage Publications, Calif.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 135Issue 9September 2009
Pages: 841 - 852

History

Received: Apr 18, 2008
Accepted: Feb 1, 2009
Published online: Apr 30, 2009
Published in print: Sep 2009

Permissions

Request permissions for this article.

Authors

Affiliations

Semiha Kiziltas, Ph.D. [email protected]
Researcher, Dept. of Civil Engineering, Middle East Technical Univ., 06531 Ankara, Turkey. E-mail: [email protected]
Burcu Akinci [email protected]
Associate Professor, Dept. of Civil and Environmental Engineering, Carnegie Mellon Univ., Pittsburgh, PA 15213 (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share