The failure of Shanghai Metro Line 4 in 2003 was one of the most striking accidents in the history of subway construction in China. It involved the first breach failure of a cross passage being mined by an artificial ground-freezing method, followed by a massive ingress of water and soil, dramatic ground subsidence, rapid sinking of existing structures, failure of the adjacent dike and floodwall along the Huang-Pu River, flooding of the site, and collapse of buildings and metro tunnels. The accident directly resulted from failure of the cross passage being excavated within a confined aquifer. In the beginning, artesian water broke the frozen mass; then, water and soil gushed into the cross passage and metro tunnels. As a result of massive ground loss, the ground level underwent significant subsidence up to 4 m and those preexisting structures were damaged. Inherently, this event was a typical project management failure, associated with a number of procedural and ethical blunders. To rebuild the destructive failure case, this paper outlines the design and construction for the cross passage along with the geological conditions, describes those preceding events incurring the failure, depicts the catastrophic scene, and introduces the postfailure emergency responses and disaster-relief measures. Finally, technical, procedural, and ethical factors leading to the failure are summarized.
Get full access to this article
View all available purchase options and get full access to this article.
Data Availability Statement
All data, models, and code generated or used during the study appear in the published article.
Acknowledgments
Financial support from the National Natural Science Foundation of China (Grant No. 41877286) is gratefully acknowledged. The comprehensive, insightful, and valuable comments and suggestions from the three anonymous reviewers are sincerely appreciated and enhanced the presentation of this paper remarkably.
References
Chen, R., Z. Li, Y. Chen, C. Ou, Q. Hu, and M. Rao. 2015. “Failure investigation at a collapsed deep excavation in very sensitive organic soft clay.” J. Perform. Constr. Facil. 29 (3): 04014078. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000557.
Harder, L. F., and J. P. Stewart. 1996. “Failure of Tapo Canyon tailings dam.” J. Perform. Constr. Facil. 10 (3): 109–114. https://doi.org/10.1061/(ASCE)0887-3828(1996)10:3(109).
Hu, X. D., W. Guo, L. Y. Zhang, and J. T. Wang. 2014. “Application of liquid nitrogen freezing to recovery of a collapsed shield tunnel.” J. Perform. Constr. Facil. 28 (4): 04014002. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000477.
Long, Y. Y., and Y. Tan. 2020. “Soil arching due to leaking of tunnel buried in water-rich sand.” Tunnelling Underground Space Technol. 95 (Jan): 103158. https://doi.org/10.1016/j.tust.2019.103158.
Luth, G. P. 2000. “Chronology and context of the Hyatt Regency collapse.” J. Perform. Constr. Facil. 14 (2): 51–61. https://doi.org/10.1061/(ASCE)0887-3828(2000)14:2(51).
Moncarz, P., and R. K. Taylor. 2000. “Engineering process failure—Hyatt walkway collapse.” J. Perform. Constr. Facil. 14 (2): 46–50. https://doi.org/10.1061/(ASCE)0887-3828(2000)14:2(46).
Mueller, D. M., J. A. Sopko, R. B. Storry, and R. Chamberland. 2015. “Ground freezing for tunnel cross passages: First application in North America.” In Proc., Rapid Excavation and Tunneling Conf. Englewood, CO: Society for Mining, Metallurgy and Exploration Inc.
Patel, A., P. A. Bosela, and N. J. Delatte. 2013. “1976 Montreal Olympics: Case study of project management failure.” J. Perform. Constr. Facil. 27 (3): 362–369. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000332.
Pearson, C., and N. Delatte. 2006. “Collapse of the Quebec Bridge, 1907.” J. Perform. Constr. Facil. 20 (1): 84–91. https://doi.org/10.1061/(ASCE)0887-3828(2006)20:1(84).
Pfatteicher, S. K. A. 2000. “The Hyatt horror: Failure and responsibility in American engineering.” J. Perform. Constr. Facil. 14 (2): 62–66. https://doi.org/10.1061/(ASCE)0887-3828(2000)14:2(62).
Shen, S. L., L. Ma, Y. S. Xu, and Z. Y. Yin. 2013. “Interpretation of increased deformation rate in aquifer IV due to groundwater pumping in Shanghai.” Can. Geotech. J. 50 (11): 1129–1142. https://doi.org/10.1139/cgj-2013-0042.
Tan, Y., R. Huang, Z. Kang, and B. Wei. 2016. “Covered semi-top-down excavation of subway station surrounded by closely spaced buildings in downtown Shanghai: Building response.” J. Perform. Constr. Facil. 30 (6): 04016040. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000892.
Tan, Y., W. Jiang, W. Luo, Y. Lu, and C. Xu. 2018. “Longitudinal sliding event during excavation of Feng-Qi Station of Hangzhou metro line 1: Postfailure investigation.” J. Perform. Constr. Facil. 32 (4): 04018039. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001181.
Tan, Y., W. Z. Jiang, H. S. Rui, Y. Lu, and D. L. Wang. 2020. “Forensic geotechnical analyses on the 2009 building-overturning accident in Shanghai, China: Beyond common recognitions.” J. Geotech. Geoenviron. Eng. 146 (7): 05020005. https://doi.org/10.1061/(ASCE)GT.1943-5606.0002264.
Tan, Y., and M. Li. 2011. “Measured performance of a 26 m deep top-down excavation in downtown Shanghai.” Can. Geotech. J. 48 (5): 704–719. https://doi.org/10.1139/t10-100.
Tan, Y., and Y. Lu. 2017a. “Forensic diagnosis of a leaking accident during excavation.” J. Perform. Constr. Facil. 31 (5): 04017061. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001058.
Tan, Y. and Y. Lu. 2017b. “Why excavation of a small air shaft caused excessively large displacements: Forensic investigation.” J. Perform. Constr. Facil. 31 (2): 04016083. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000947.
Tan, Y., and B. Wei. 2012. “Observed behavior of a long and deep excavation constructed by cut-and-cover technique in Shanghai soft clay.” J. Geotech. Geoenviron. Eng. 138 (1): 69–88. https://doi.org/10.1061/(ASCE)GT.1943-5606.0000553.
Tsuchida, H. 1970. “Prediction and countermeasure against liquefaction in sand deposits.” In Vol. 3 of Proc., Seminar of the Port and Harbour Research Institute, 1–3, Yokosuka, Japan: Ministry of Transport.
Xu, Y. S., S. L. Shen, D. J. Ren, and H. N. Wu. 2016. “Analysis of factor in land subsidence in Shanghai: A view based on strategic environmental assessment.” Sustainability 8 (6): 573. https://doi.org/10.3390/su8060573.
Information & Authors
Information
Published In
Copyright
© 2020 American Society of Civil Engineers.
History
Received: Feb 6, 2020
Accepted: Jul 27, 2020
Published online: Oct 23, 2020
Published in print: Feb 1, 2021
Discussion open until: Mar 23, 2021
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.