Performance of Supporting Structures of a Single-Floor Three-Span Metro Station during Column-Drift Tunneling in Dry Sandy Ground

Publication: Journal of Performance of Constructed Facilities
Volume 32, Issue 3

Abstract

Although the column-drift method is commonly used for constructing a shallow underground metro station, there are few comprehensive field monitoring studies to investigate the mechanical behavior during complicated construction procedures. This study investigates the stress and deformation characteristics of a single-floor three-span metro structure built by the column-drift method in dry sandy ground based on the field case of the Great Wall Qiao Station in Shijiazhuang Metro Line 1. The excavation started at the two pilot tunnels to erect the two columns, which then served as support structures for the middle drift and then the two side drifts, which were excavated last. By comparing the results obtained from field monitoring and numerical analysis, it was found that the crown settlement and convergence of the primary and temporary supports mainly occurred during the excavation of the lower parts of the top caverns in both the pilot tunnels and side drifts. The crown settlement of the middle drift was small due to the support of the early columns and longitudinal beams in the pilot tunnel. After the primary and temporary supports were closed, the deformation of the structure did not develop, suggesting that the temporary structure should be closed as soon as possible. When the middle and side drifts were constructed, the temporary supports were dismantled, resulting in an obvious increase in the stress of the remaining primary supports. Thus, the demolition length of the temporary structure per cycle should be strictly controlled. The surrounding load was partially transferred to the secondary lining in the side drifts after its final placement, which resulted in a decrease in the stress of the remaining primary supports. Once the middle drift was excavated, the top of the monitored column moved toward the station center line. After the transversal temporary supports between the left and right longitudinal top beams were fixed with prepressure, the top of the columns turned back to the opposite direction and their movement increased after the crown supports of the middle drift finished. In the meantime, the stress difference between the two longitudinal beams became obvious. The tilting of the column roofs decreased after the two side drifts were simultaneously constructed. It was suggested that the temporary transverse supports and the symmetrical construction of the side drifts were effective measures in controlling the tilting of columns.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The financial support from National Natural Science Foundation of China (No. 51778637) is acknowledged and appreciated. The authors are also grateful to the funds provided by China Railway No. 4 Engineering Group Co., Ltd.

References

An, Y., and Peng, L. (2009). “Simulation of a new construction method in a shallow-buried weak tunnel.” Recent Advancement in Soil Behavior, In Situ Test Methods, Pile Foundations, and Tunneling: Selected Papers from the 2009 GeoHunan Int. Conf., ASCE, Reston, VA, 256–261.
Fang, Q., Zhang, D., and Wong, L. N. Y. (2011). “Environmental risk management for a cross interchange subway station construction in China.” Tunnelling Underground Space Technol., 26(6), 750–763.
Fang, Q., Zhang, D., and Wong, L. N. Y. (2012). “Shallow tunnelling method (STM) for subway station construction in soft ground.” Tunnelling Underground Space Technol., 29, 10–30.
Fu, Q. (2007). “Control measures for ground settlement during station construction with tunnel-column method.” Tunnel Constr., 27(S2), 465–470 (in Chinese).
Ghaboussi, J., and Ranken, R. E. (1977). “Interaction between two parallel tunnels.” Int. J. Numer. Anal. Methods Geomech., 1(1), 75–103.
Huang, F., Liang, B., Wang, G., Chen, L., and Wu, Z. (2014). “Study and application of “Interlaid Rock Wall” method in a subway station with shallow buried depth and large crossing section.” Tunneling and Underground Construction Geo-Shanghai, ASCE, Reston, VA, 882–889.
Kivi, A. V., Sadaghiani, M. H., and Ahmadi, M. M. (2012). “Numerical modeling of ground settlement control of large span underground metro station in Tehran Metro using central beam column (CBC) structure.” Tunnelling Underground Space Technol., 28, 1–9.
Liu, W., Luo, F., and Mei, J. (2000). “A new construction method for a metro station in Beijing.” Tunnelling Underground Space Technol., 15(4), 409–413.
Rodríguez-Roa, F. (2002). “Ground subsidence due to a shallow tunnel in dense sandy gravel.” J. Geotech. Geoenviron. Eng., 426–434.
Sadaghiani, M. H., and Dadizadeh, S. (2010). “Study on the effect of a new construction method for a large span metro underground station in Tabriz-Iran.” Tunnelling Underground Space Technol., 25(1), 63–69.
Trabada, M. M. J., and Ortiz, J. M. R. (1999). “Construction of a large cavern beneath existing buildings for the Madrid Subway.” Challenges for the 21st Century: Proc., World Tunnel Congress ‘99, Vol. 1, A.A. Balkema, Rotterdam, Netherlands, 267–272.
Wang, M., and Liu, Z. (1990). “Experimental study on subway station construction by means of shallow tunnelling method.” Tunnel Constr., 4, 1–10 (in Chinese).
Wang, Y., Kong, L., and Wang, Y. (2016). “Simple method for the safety evaluation of underground pipelines induced by urban shallow tunneling.” Geo-China 2016, ASCE, Reston, VA, 19–26.
Wang, Z., Zhang, C., Wang, J., Yu, F., and Su, J. (2013). “Selection of the construction method for newly-built subway station closely up-crossing existing metro tunnels.” China Railway Sci., 34(5), 63–69 (in Chinese).
Xia, C. C., Zhao, X., Zhang, G. Z., and Wang, C. B. (2014). “Stability analysis by strength reduction method in shallow buried tunnels.” Tunneling and Underground Construction, ASCE, Reston, VA, 321–331.
Yang, F., and Yang, J. S. (2010). “Stability of shallow tunnel using rigid blocks and finite-element upper bound solutions.” Int. J. Geomech., 242–247.
Zheng, J. (2011). “Study on environmental effects of large-span shallow-subsurface excavation station construction in soil-rock assorted area.” Ph.D. thesis, Ocean Univ. of China, Qingdao, China (in Chinese).

Information & Authors

Information

Published In

Go to Journal of Performance of Constructed Facilities
Journal of Performance of Constructed Facilities
Volume 32Issue 3June 2018

History

Received: Apr 24, 2017
Accepted: Nov 21, 2017
Published online: Mar 19, 2018
Published in print: Jun 1, 2018
Discussion open until: Aug 19, 2018

Permissions

Request permissions for this article.

Authors

Affiliations

Shuying Wang, M.ASCE [email protected]
Associate Professor, School of Civil Engineering, Central South Univ., Changsha, Hunan 410075, China. E-mail: [email protected]
Pengfei Liu [email protected]
Ph.D. Candidate, School of Civil Engineering, Central South Univ., Changsha, Hunan 410075, China (corresponding author). E-mail: [email protected]
Tongming Qu [email protected]
Graduate Student, School of Civil Engineering, Central South Univ., Changsha, Hunan 410075, China. E-mail: [email protected]
Lecturer, School of Civil Engineering, Central South Univ., Changsha, Hunan 410075, China. E-mail: [email protected]
Jinqiang Zhou [email protected]
Engineer, Kunming Survey, Design and Research Institute Co. Ltd, CREEC Group, Taihe St., Kunming, Yunnan 650200, China. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share