FEM-Based Shape-Finding and Force-Assessment of Suspension Bridges via Completed Loop Adjustment
Publication: Journal of Bridge Engineering
Volume 27, Issue 1
Abstract
Finding the main cable shape is an essential step in the design and construction of suspension bridges. In this paper, shape-finding and force-assessment of suspension bridges based on loop adjustment are proposed and realized via the finite-element method. Here, loop adjustment refers to the process where the appropriate adjustment coefficient is chosen based on the results of the last modeling and deviations from the design goals to approach the target main cable shape gradually and to satisfy the design requirements. This method adopts a full-bridge model, which provides the comprehensive account of interactions between different components of the suspension bridge, including towers and stiffening girders, as well as the effect of tower compression and splay saddle rotation. Based on the full-bridge model in the completed bridge state, the inverted removal method is used for the calculation of key construction parameters in the free cable state, such as prebias of tower saddles, predeflected angle of splay saddles, and installation position of cable clamps. The proposed method’s feasibility and effectiveness are verified by its application to two particular suspension bridges, namely, the Great Belt Bridge (Denmark) with a main span of 1,624 m and the Jindong Bridge over the Jinsha River (China), with a main span of 730 m. Results of shape-finding and force-assessment both have good accuracy, which are generally consistent with those obtained by other methods.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The research described in this paper was financially supported by the National Natural Science Foundation of China (Grant Nos. 52078134 and 51678148), the Natural Science Foundation of Jiangsu Province (Grant No. BK20181277), and the National Key R&D Program of China (Grant No. 2017YFC0806009), which are gratefully acknowledged.
References
Adanur, S., M. Günaydin, A. C. Altunişik, and B. Sevim. 2012. “Construction stage analysis of Humber Suspension Bridge.” Appl. Math. Model. 36 (11): 5492–5505. https://doi.org/10.1016/j.apm.2012.01.011.
Cao, H. Y., X. D. Qian, Z. J. Chen, and H. P. Zhu. 2017a. “Layout and size optimization of suspension bridges based on coupled modelling approach and enhanced particle swarm optimization.” Eng. Struct. 146 170–183. https://doi.org/10.1016/j.engstruct.2017.05.048.
Cao, H. Y., Y.-L. Zhou, Z. J. Chen, and M.-A. Wahab. 2017b. “Form-finding analysis of suspension bridges using an explicit iterative approach.” Struct. Eng. Mech. 62 (1): 85–95. https://doi.org/10.12989/sem.2017.62.1.085.
Chen, Y. R., W. Wei, and J. Dai. 2017. “The key quality control technology of main cable erection in long-span suspension bridge construction.” IOP Conf. Ser.: Earth Environ. Sci. 61: 012124. https://doi.org/10.1088/1755-1315/61/1/012124.
Chen, Z. J., H. Y. Cao, K. Ye, H. P. Zhu, and S. F. Li. 2015. “Improved particle swarm optimization-based form-finding method for suspension bridge installation analysis.” J. Comput. Civ. Eng. 29 (3): 04014047. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000354.
Jung, M.-R., D.-J. Min, and M.-Y. Kim. 2013. “Nonlinear analysis methods based on the unstrained element length for determining initial shaping of suspension bridges under dead loads.” Comput. Struct. 128 (5): 272–285. https://doi.org/10.1016/j.compstruc.2013.06.014.
Jung, M.-R., D.-J. Min, and M.-Y. Kim. 2015. “Simplified analytical method for optimized initial shape analysis of self-anchored suspension bridges and its verification.” Math. Prob. Eng. 2015: 923508.
Karoumi, R. 1999. “Some modeling aspects in the nonlinear finite element analysis of cable-supported bridges.” Comp. Struct. 71 (4): 397–412. https://doi.org/10.1016/S0045-7949(98)00244-2.
Kim, H.-K., and M.-Y. Kim. 2012. “Efficient combination of a TCUD method and an initial force method for determining initial shapes of cable-supported bridges.” Int. J. Steel Struct. 12 (2): 157–174. https://doi.org/10.1007/s13296-012-2002-1.
Kim, H.-K., M.-J. Lee, and S.-P. Chang. 2002. “Nonlinear shape-finding analysis of a self-anchored suspension bridge.” Eng. Struct. 24 (12): 1547–1559. https://doi.org/10.1016/S0141-0296(02)00097-4.
Kim, H.-K., M.-J. Lee, and S.-P. Chang. 2006. “Determination of hanger installation procedure for a self-anchored suspension bridge.” Eng. Struct. 28 (7): 959–976. https://doi.org/10.1016/j.engstruct.2005.10.019.
Kim, K.-S., and H. S. Lee. 2001. “Analysis of target configurations under dead loads for cable-supported bridges.” Comp. Struct. 79 (29–30): 2681–2692. https://doi.org/10.1016/S0045-7949(01)00120-1.
Lonetti, P., and A. Pascuzzo. 2014. “Design analysis of the optimum configuration of self-anchored cable-stayed suspension bridges.” Struct. Eng. Mech. 51 (5): 847–866. https://doi.org/10.12989/sem.2014.51.5.847.
Sun, Y., H. P. Zhu, and D. Xu. 2015. “New method for shape finding of self-anchored suspension bridges with three-dimensionally curved cables.” J. Bridge Eng. 20 (2): 04014063. https://doi.org/10.1061/(ASCE)BE.1943-5592.0000642.
Thai, H.-T., and D.-H. Choi. 2013. “Advanced analysis of multi-span suspension bridges.” J. Constr. Steel Res. 90 (41): 29–41. https://doi.org/10.1016/j.jcsr.2013.07.015.
Zhang, W.-M., T. Li, L.-Y. Shi, Z. Liu, and K.-R. Qian. 2019a. “An iterative calculation method for hanger tensions and the cable shape of a suspension bridge based on the catenary theory and finite element method.” Adv. Struct. Eng. 22 (7): 1566–1578. https://doi.org/10.1177/1369433218820243.
Zhang, W.-M., G.-M. Tian, and Z. Liu. 2019b. “Analytical study of uniform thermal effects on cable configuration of a suspension bridge during construction.” J. Bridge Eng. 24 (11): 04019104. https://doi.org/10.1061/(ASCE)BE.1943-5592.0001493.
Zhang, W. M., G. M. Tian, C. Y. Yang, and Z. Liu. 2019c. “Analytical methods for determining the cable configuration and construction parameters of a suspension bridge.” Struct. Eng. Mech. 71 (6): 603–625.
Zhou, G. P., A. Q. Li, J. H. Li, M. J. Duan, Z. Y. Xia, and L. Zhu. 2019. “Determination and implementation of reasonable completion state for the self-anchored suspension bridge with extra-wide concrete girder.” Appl. Sci. 9 (12): 2576. https://doi.org/10.3390/app9122576.
Zhou, X. H., and X. G. Zhang. 2019. “Thoughts on the development of bridge technology in China.” Engineering 5 (6): 1120–1130. https://doi.org/10.1016/j.eng.2019.10.001.
Zhou, Y. F., and S. R. Chen. 2019. “Iterative nonlinear cable shape and force finding technique of suspension bridges using elastic catenary configuration.” J. Eng. Mech. 145 (5): 04019031. https://doi.org/10.1061/(ASCE)EM.1943-7889.0001598.
Information & Authors
Information
Published In
Copyright
© 2021 American Society of Civil Engineers.
History
Received: Jul 6, 2020
Accepted: Sep 8, 2021
Published online: Nov 10, 2021
Published in print: Jan 1, 2022
Discussion open until: Apr 10, 2022
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
- Wen-ming Zhang, Zhe-hong Zhang, Gen-min Tian, Jia-qi Chang, Determining the Reasonable Completed Bridge State of a Self-Anchored Suspension Bridge with a Spatial Cable System Based on Minimum Bending Strain Energy: An Analytical Algorithm, Journal of Bridge Engineering, 10.1061/JBENF2.BEENG-5857, 28, 5, (2023).
- Xianhao Li, Yuejin Tang, Ying Xu, Li Ren, Analytical analysis of hollow CORC cable under thermo-mechanical loads, Superconductivity, 10.1016/j.supcon.2023.100037, 5, (100037), (2023).
- Xiaoming Wang, Jianling Zhao, Yuan Sun, Fan Wang, Zhaohui Li, Multifrequency-based tension intelligent identification for cables with unknown end-restraints using a metaheuristic algorithm, Structures, 10.1016/j.istruc.2023.02.049, 50, (775-790), (2023).
- Rucheng Xiao, Chaolin Song, Bin Sun, Wei Dai, Jialing Liu, Reliability-assisted determination of partial factors for the design of main cables considering secondary stress effect, Structures, 10.1016/j.istruc.2023.01.060, 48, (1479-1490), (2023).
- Wenming Zhang, Jijiu Liu, Zihang Liu, Analytical Methods to Adjust the Distribution of Dead Loads of a Suspension Bridge with Three Cable Planes to Three Cables in The Transverse Direction, IABSE Congress, Nanjing 2022: Bridges and Structures: Connection, Integration and Harmonisation, 10.2749/nanjing.2022.0356, (356-363), (2022).
- Wen-ming Zhang, Ji-jiu Liu, Gen-min Tian, Dead Load Allocation in Triple-Cable Suspension Bridges by Adjusting the Unstrained Lengths of Hangers: A Novel Analytical Approach, Journal of Bridge Engineering, 10.1061/(ASCE)BE.1943-5592.0001964, 27, 11, (2022).
- Wen-ming Zhang, Jie Chen, Gen-min Tian, Jia-qi Chang, Static Response Assessment of the Entire Suspension Bridge under Horizontal Transverse Live Load: An Analytical Calculation Method, Journal of Bridge Engineering, 10.1061/(ASCE)BE.1943-5592.0001891, 27, 7, (2022).
- Yuan Sun, Yaren Xu, Jiping Guo, Hongyou Cao, Constructional Safety-Based Cost Optimization for the Buckling–Anchorage System of Cantilever Casting Concrete Arch Bridges, Journal of Bridge Engineering, 10.1061/(ASCE)BE.1943-5592.0001859, 27, 5, (2022).
- Yuan Sun, Xiao-xiao Tai, Kai Liu, Ai-zhu Zhu, Hong-ping Zhu, Determining launching construction parameters of superlong superwide bridges: A multiobjective optimization method using machine learning techniques, Structures, 10.1016/j.istruc.2022.04.093, 41, (15-28), (2022).
- Wen-ming Zhang, Shi-han Wang, Xiao-fan Lu, An analytical algorithm for deriving the lateral bending’s natural frequencies and modal shapes of a three-tower double-cable suspension bridge, Structures, 10.1016/j.istruc.2022.04.080, 40, (1078-1090), (2022).