Investigating the Causes of Missing Field Detected Issues from BIM-Based Construction Coordination through Semistructured Interviews
Publication: Journal of Architectural Engineering
Volume 28, Issue 4
Abstract
Although the use of building information modeling (BIM) and automatic clash detection has improved the construction coordination process in construction projects, the industry still suffers from on-site fixes of issues, which can cause construction delays and cost over-runs. Several research studies have investigated the causes of constructability issues or rework but have not focused on how the issues are missed at the construction coordination stage, which is a mitigation strategy that can minimize field detected issues. This research, via expert interviews and utilizing the grounded theory approach, determined the underlying causes of not capturing field-detected issues during the BIM-based construction coordination process. Missing model elements, not considering operability or maintainability, and inaccurate as-built model updates were the most common causes. The research findings can benefit industry practitioners by providing the causes and preventive measures that can enhance the ability to capture issues before they occur in the field. Moreover, this research also provides future researchers with the critical causes that need to be tackled to improve BIM-based construction coordination.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
This research was supported by the Saudi Arabian Cultural Mission (SACM). SACM’s support is gratefully acknowledged. Any opinions, findings, conclusions, or recommendations expressed in this material are those of the authors and do not reflect the views of the SACM. The authors also thank the industry experts who participated in this study.
References
Akponeware, A. O., and Z. A. Adamu. 2017. “Clash detection or clash avoidance? An investigation into coordination problems in 3D BIM.” Buildings 7 (3): 75. https://doi.org/10.3390/buildings7030075.
Assaf, S. A., and S. Al-Hejji. 2006. “Causes of delay in large construction projects.” Int. J. Project Manage. 24 (4): 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010.
Barber, P., A. Graves, M. Hall, D. Sheath, and C. Tomkins. 2000. “Quality failure costs in civil engineering projects.” Int. J. Qual. Reliab. Manage. 17 (4/5): 479–492. https://doi.org/10.1108/02656710010298544.
Barton, P. K., B. G. Fryer, and D. Highfield. 1983. Building services integration. New York: E. & P.N. Spon.
Bernstein, H. M., S. Jones, and M. Russo. 2012. The business value of BIM in North America: Multi-year trend analysis and user ratings (2007–2012). SmartMarket Rep. No. 9. Bedford, MA: McGraw-Hill.
Charmaz, K. 2006. Constructing grounded theory: A practical guide through qualitative analysis. Thousand Oaks, CA: Sage.
Creswell, J. W., and J. D. Creswell. 2017. Research design: Qualitative, quantitative, and mixed methods approaches. Thousand Oaks, CA: Sage.
Dossick, C. S., and G. Neff. 2010. “Organizational divisions in BIM-enabled commercial construction.” J. Constr. Eng. Manage. 136 (4): 459–467. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000109.
Glaser, B. G., A. L. Strauss, and E. Strutzel. 1968. “The discovery of grounded theory; strategies for qualitative research.” Nurs. Res. 17 (4): 364. https://doi.org/10.1097/00006199-196807000-00014.
Glick, S., and A. Guggemos. 2009. “IPD and BIM: Benefits and opportunities for regulatory agencies.” In Vol. 2 of Proc., 45th ASC National Conf. Cheyenne, WY: Associated Schools of Construction.
Han, B., and F. Leite. 2021. “Measuring the impact of immersive virtual reality on construction design review applications: Head-mounted display versus desktop monitor.” J. Constr. Eng. Manage. 147 (6): 04021042. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002056.
Hardin, B., and D. McCool. 2015. BIM and construction management: Proven tools, methods, and workflows. Hoboken, NJ: Wiley.
Hartmann, T., J. Gao, and M. Fischer. 2008. “Areas of application for 3D and 4D models on construction projects.” J. Constr. Eng. Manage. 134 (10): 776–785. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(776).
Hu, Y., D. Castro-Lacouture, and C. M. Eastman. 2019. “Holistic clash detection improvement using a component dependent network in BIM projects.” Autom. Constr. 105: 102832. https://doi.org/10.1016/j.autcon.2019.102832.
Hu, Y., D. Castro-Lacouture, C. M. Eastman, and S. B. Navathe. 2021. “Component change list prediction for BIM-based clash resolution from a graph perspective.” J. Constr. Eng. Manage. 147 (8): 04021085. https://doi.org/10.1061/(ASCE)CO.1943-7862.0002092.
Kakitahi, J. M., H. M. Alinaitwe, A. Landin, and M. J. Rodrigues. 2014. “A comparison of construction related rework in Uganda and Mozambique.” J. Constr. Project Manage. Innov. 4 (1): 770–781. https://doi.org/10.36615/jcpmi.v4i1.56.
Korman, T. M., M. A. Fischer, and C. B. Tatum. 2003. “Knowledge and reasoning for MEP coordination.” J. Constr. Eng. Manage. 129 (6): 627–634. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(627).
Lee, G., H. K. Park, and J. Won. 2012. “D3 city project—Economic impact of BIM-assisted design validation.” Autom. Constr. 22: 577–586. https://doi.org/10.1016/j.autcon.2011.12.003.
Leedy, P. D., and J. E. Ormrod. 2015. Practical research: Planning and design. London: Pearson.
Leite, F., A. Akcamete, B. Akinci, G. Atasoy, and S. Kiziltas. 2011. “Analysis of modeling effort and impact of different levels of detail in building information models.” Autom. Constr. 20 (5): 601–609. https://doi.org/10.1016/j.autcon.2010.11.027.
Leite, F. L. 2019. BIM for design coordination: A virtual design and construction guide for designers, general contractors, and MEP subcontractors. Hoboken, NJ: Wiley.
Love, P. E. D. 2002. “Influence of project type and procurement method on rework costs in building construction projects.” J. Constr. Eng. Manage. 128 (1): 18–29. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(18).
Love, P. E. D., D. J. Edwards, S. Han, and Y. M. Goh. 2011. “Design error reduction: Toward the effective utilization of building information modeling.” Res. Eng. Des. 22 (3): 173–187. https://doi.org/10.1007/s00163-011-0105-x.
Love, P. E. D., D. J. Edwards, and J. Smith. 2016. “Rework causation: Emergent theoretical insights and implications for research.” J. Constr. Eng. Manage. 142 (6): 04016010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001114.
Love, P. E. D., D. J. Edwards, H. Watson, and P. Davis. 2010. “Rework in civil infrastructure projects: Determination of cost predictors.” J. Constr. Eng. Manage. 136 (3): 275–282. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000136.
Love, P. E. D., Z. Irani, and D. J. Edwards. 2004. “A rework reduction model for construction projects.” IEEE Trans. Eng. Manage. 51 (4): 426–440. https://doi.org/10.1109/TEM.2004.835092.
Love, P. E. D., and H. Li. 2000. “Quantifying the causes and costs of rework in construction.” Constr. Manage. Econ. 18 (4): 479–490. https://doi.org/10.1080/01446190050024897.
Love, P. E. D., and J. Smith. 2003. “Benchmarking, benchaction, and benchlearning: Rework mitigation in projects.” J. Manage. Eng. 19 (4): 147–159. https://doi.org/10.1061/(ASCE)0742-597X(2003)19:4(147).
Mehrbod, S., S. Staub-French, and M. Tory. 2020. “BIM-based building design coordination: Processes, bottlenecks, and considerations.” Can. J. Civ. Eng. 47 (1): 25–36. https://doi.org/10.1139/cjce-2018-0287.
Morse, J. M. 2015. Data were saturated… Los Angeles: Sage.
Mostafa, K., & F. Leite. 2018. “Evolution of BIM adoption and implementation by the construction industry over the past decade: A replication study.” In Construction Research Congress 2018: Construction Information Technology, edited by C. Wang, C. Harper, Y. Lee, R. Harris, and C. Berryman, 180–189. Reston, VA: ASCE.
NIBS (National Institute of Building Sciences). 2015. National BIM standard—United States® version 3. Washington, DC: NIBS.
Porwal, A., and K. N. Hewage. 2013. “Building information modeling (BIM) partnering framework for public construction projects.” Autom. Constr. 31: 204–214. https://doi.org/10.1016/j.autcon.2012.12.004.
Robinson-Fayek, A., M. Dissanayake, and O. Campero. 2004. “Developing a standard methodology for measuring and classifying construction field rework.” Can. J. Civ. Eng. 31 (6): 1077–1089. https://doi.org/10.1139/l04-068.
Sacks, R., C. Eastman, G. Lee, & P. Teicholz. 2018. BIM handbook: A guide to building information modeling for owner, managers, designers, engineers and contractors 3rd ed. Hoboken, NJ: Wiley.
Safapour, E., S. Kermanshachi, P. Taneja, and A. Pamidimukkala. 2022. “Exploratory analysis of human-, organizational-, and project-based reworks: Challenges and strategies.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 14 (1): 04521045. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000524.
Saunders, B., J. Sim, T. Kingstone, S. Baker, J. Waterfield, B. Bartlam, H. Burroughs, and C. Jinks. 2018. “Saturation in qualitative research: Exploring its conceptualization and operationalization.” Qual. Quantity 52 (4): 1893–1907. https://doi.org/10.1007/s11135-017-0574-8.
Staub-French, S., and A. Khanzode. 2007. “3D and 4D modeling for design and construction coordination: Issues and lessons learned.” J. Infor. Technol. Constr. (ITcon) 12 (26): 381–407. https://www.itcon.org/2007/26.
Tabesh, A. R., and S. Staub-French. 2005. “Case study of constructability reasoning in MEP coordination.” In Construction Research Congress 2005: Broadening Perspectives, edited by I. D. Tommelein, 1–10. Reston, VA: ASCE.
Taggart, M., L. Koskela, and J. Rooke. 2014. “The role of the supply chain in the elimination and reduction of construction rework and defects: An action research approach.” Constr. Manage. Econ. 32 (7–8): 829–842. https://doi.org/10.1080/01446193.2014.904965.
Tommelein, I. D., and S. Gholami. 2012. “Root causes of clashes in building information models.” In Vol. 1 of Proc., 20th Annual Conf. Int. Group for Lean Construction. San Diego, CA: Montezume Publishing.
Urquhart, C. 2012. Grounded theory for qualitative research: A practical guide. Thousand Oaks, CA: Sage.
Wang, L., and F. Leite. 2016. “Process knowledge capture in BIM-based mechanical, electrical, and plumbing design coordination meetings.” J. Comput. Civ. Eng. 30 (2): 04015017. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000484.
Yap, J. B. H., P. L. Low, and C. Wang. 2017. “Rework in Malaysian building construction: Impacts, causes and potential solutions.” J. Eng. Des. Technol. 15 (5): 591–618. https://doi.org/10.1108/JEDT-01-2017-0002.
Ye, G., Z. Jin, B. Xia, and M. Skitmore. 2015. “Analyzing causes for reworks in construction projects in China.” J. Manage. Eng. 31 (6): 04014097. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000347.
Information & Authors
Information
Published In
Copyright
© 2022 American Society of Civil Engineers.
History
Received: Nov 12, 2021
Accepted: Jun 6, 2022
Published online: Aug 16, 2022
Published in print: Dec 1, 2022
Discussion open until: Jan 16, 2023
ASCE Technical Topics:
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.
Cited by
- Simge Girgin, Renate Fruchter, Martin Fischer, A Comparative Case Study to Assess the Costs and Benefits of VR Use during Preconstruction MEP Coordination, Construction Research Congress 2024, 10.1061/9780784485262.088, (866-875), (2024).
- Simge Girgin, Renate Fruchter, Martin Fischer, Construction Cost Savings through VR-Based Early Identification of Operability Issues: A Comparative Case Study, Computing in Civil Engineering 2023, 10.1061/9780784485231.018, (146-153), (2024).