Performance Evaluation of Lake Shelbyville by Stochastic Dynamic Programming
Publication: Journal of Water Resources Planning and Management
Volume 118, Issue 2
Abstract
The operation policy of Lake Shelbyville, Illinois has been modified several times in the past 20 years due to unusual weather conditions and changes in basin‐wide water resources development. A modified stochastic dynamic programming (SDP) model, which accounts for the unrepeatable agricultural and property damages and improves the accuracy of these damage estimates, is used to evaluate the performance of Lake Shelbyville. The optimal pool levels in the summer months are found to be 2–5 ft lower than the current target level of 599.7 ft. The expected damages in the model increase by 9% when a penalty function is used to force the summer pool to the current target. Moreover, it would take more than one month for Lake Shelbyville to resume the summer pool from the winter drawdown. A transition period of at least two months for lake levels between winter and summer appears warranted.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Askew, A. J. (1974a). “Optimum reservoir operating policies and the imposition of a reliability constraint.” Water Resour. Res., 1(10), 51–56.
2.
Askew, A. J. (1974b). “Chance‐constrained dynamic programming and the optimization of water resource systems.” Water Resour. Res., 6(10), 1099–1106.
3.
Background and position paper, Kaskaskia River Basin. (1983). U.S. Army Corps of Engineers, St. Louis District, St. Louis, Mo.
4.
Cochran, A. L. (1960). Flood hydrograph‐damage integration method of estimating flood damage in agricultural areas. Dept. of Army, Office of the Chief of Engineers, Washington, D.C.
5.
Lee, H.‐L., Brill, E. D., Jr., Liebman, J. C. (1987). “Reliability of reservoir operation under hydrologic uncertainty.” Research Report 207, Water Resour. Ctr., Univ. of Illinois at Urbana‐Champaign, Urbana, Ill.
6.
Loucks, D. P., Stedinger, J. R., and Haith, D. A. (1981). Water resource systems planning and analysis. Prentice‐Hall, Inc., Englewood Cliffs, N.J.
7.
“Shelbyville and Carlyle reservoirs design memorandum: Low flow regulation (Joint Operation).” (1964). U.S. Army Corps of Engineers, St. Louis District, St. Louis, Mo.
8.
Shelbyville reservoir, design memorandum no. 1: Hydrology and hydraulic analysis. (1962). U.S. Army Corps of Engineers, St. Louis District, St. Louis, Mo.
9.
Singh, K. P. (1977). “Water supply from Shelbyville and Carlyle Lakes and their optimal joint operation.” Report of Investigation No. 84, Illinois State Water Survey, Champaign, Ill.
10.
Singh, K. P., Stall, J. B., Lonnquist, C., and Smith, R. H. (1975). “Analysis of the operation of Lake Shelbyville and Carlyle Lake to maximize agricultural and recreation benefits.” Contract Report, Illinois State Water Survey, Champaign, Ill.
11.
Wang, D., and Adams, B. J. (1986). “Optimization of real‐time reservoir operations with Markov decision processes.” Water Resour. Res., 3(22), 345–352.
12.
“Water and Related Land Resources: Establishment of Principles and Standards for Planning.” (1973). Federal Register, (38)174.
Information & Authors
Information
Published In
Copyright
Copyright © 1992 ASCE.
History
Published online: Mar 1, 1992
Published in print: Mar 1992
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.