Assessment of AWT Systems in Tampa Bay Area
Publication: Journal of Environmental Engineering
Volume 122, Issue 7
Abstract
A study was conducted to evaluate the performance of eight full-scale advanced wastewater treatment (AWT) facilities using biological nutrient removal (BNR) processes as the primary mechanism for removing carbon, nitrogen, and phosphorus from domestic wastewater. One year of operating data from each facility was obtained from monthly operating reports (MORs) provided by plant operators. BNR processes evaluated were: 5-Stage Bardenpho, A 2 /O, and Carrousel systems and/or oxidation ditches preceded by anaerobic/anoxic selectors. Plant inspections and interviews with chief operators were undertaken to understand how each facility was operated, and the type and quantity of chemicals used. Influent and effluent five-day carbonaceous biochemical oxygen demand (CBOD 5 ), total suspended solids (TSS), and total phosphorus (TP) were evaluated in addition to influent total Kjeldahl nitrogen (TKN) and effluent total nitrogen (TN). In all cases, annual average effluent requirements of 5 mg/L, 5 mg/L, and 3 mg/L for CBOD 5, TSS, and TN were achieved. Facilities with a 1 mg/L annual average effluent TP limit met permit requirements. Percent removals, monthly average effluent concentrations, detention times, secondary clarifier design information, and chemical dosages are presented.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Albertson, O. E. (1991). “Bulking sludge control progress, practice and problems.”Water Sci. Technol., 23(4–6), 835–846.
2.
Albertson, O. E. (1992). Processes for wastewater treatment ( proprietary and non-proprietary ). Enviro Enterprises, Inc., Salt Lake City, Utah, 1–33.
3.
Bowker, R. P. G., and Stensel, H. D. (1987). Design manual for phosphorus removal, EPA-625/1-87/001 . U.S. Envir. Protection Agency, Washington, D.C., 15–54.
4.
Design of municipal wastewater treatment plants. (1992). Manual of Practice No. 8, Water Envir. Federation, Alexandria, Va., 895–1012.
5.
Elick, J. E. (1993). “Monthly operating reports, October 92–September 93.”Rep., City of Largo AWT, Florida Dept. of Envir. Protection, Clearwater, Fla.
6.
Florida Administrative Code. (1990). Chapter 17-610, Reuse of Water and Land Application, 1–69.
7.
Gardner, G., and Caranza, M. (1993). “Monthly operating reports, September 92–October 93.”Rep., Falkenburg AWT, Florida Dept. of Envir. Protection, Tampa. Fla.
8.
Magdziasz, J. K. (1993). “Monthly operating reports, August 92–July 93.”Rep., City of Dunedin AWT, Florida Dept. of Envir. Protection, Dunedin, Fla.
9.
“Manual nitrogen control.” (1993). U.S. Environmental Protection Agency, EPA/625/5-93/010, Washington, D.C., 249–311.
10.
Morales, L. M., Daigger, G. T., and Borberg, J. R.(1991). “Capability assessment of biological nutrient removal facilities.”Res. J. WPCF, 63, 900–909.
11.
Principles and practice of nutrient removal for municipal wastewater. (1988). The Soap and Detergent Assoc., New York, N.Y., 155–185.
12.
Randall, C. W., Stensel, H. P., and Barnard, J. L. (1992). “Design of activated sludge biological removal plants.”Design and retrofit of wastewater treatment plants for biological nutrient removal, C. W. Randall, J. L. Bernard, and H. D. Stensel, eds., Technomic Publishing Co., Inc., Lancaster, Pa., 97–183.
13.
Reardon, R. D., Healy, J. C., Dietz, J. D., Snyder, B. R., and Grantham, B. R.(1993). “Determining nitrification and denitrification kinetics at a full-scale nutrient removal POTW.”Proc., 66th Annu. Conf. Water Envir. Federation, Anaheim, Calif., 3, 315–324.
14.
Reckenwald, J. (1993). “Monthly operating reports, August 92–July 93.”Rep., Clearwater East AWT, Florida Dept. of Envir. Protection, Clearwater, Fla.
15.
Sen, D., Randall, C. W., and Bassett, B. D.(1993). “Mathematical criteria governing design of aeration systems in oxidation ditches for biological nitrogen and excess phosphorus removal.”Proc., 66th Annu. Conf. Water Envir. Federation, Anaheim, Calif., 3, 65–75.
16.
Stanczykowski, K. F. (1993). “Monthly operating reports, June 92–May 93.”Rep., Valrico AWT, Florida Dept. of Envir. Protection, Dover, Fla.
17.
Tchobanoglous, G., and Burton, F. L. (1991). Wastewater engineering: treatment, disposal and reuse, 3rd Ed., McGraw-Hill Book Co., Inc., New York, N.Y., 663–763.
18.
Thabaraj, G. J. (1993). “AWT processes in Florida.” Florida Depratment of Environmental Regulation, Tampa, Fla., 1–19.
19.
Yawn, C. (1993). “Monthly operating reports, September 92–October 93.”Rep., Dale Mabry AWT, Florida Dept. of Envir. Protection, Tampa, Fla.
Information & Authors
Information
Published In
Copyright
Copyright © 1996 American Society of Civil Engineers.
History
Published online: Jul 1, 1996
Published in print: Jul 1996
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.