Abstract

Investigating styles of handling interpersonal conflict across multiple situations, this study explores the orientations of Hofstede’s cultural dimensions (power distance, individualism versus collectivism, femininity versus masculinity, uncertainty avoidance, and long-term versus short-term orientation) influencing the choice of dispute resolving strategies in construction industry. Combinations of the five conflict approaches (collaborating, dominating, compromising, avoiding, and accommodating) of the two concerns model are adopted to present the styles of handling conflict (or conflict management styles). Chinese residing in Taiwan are chosen as the focus group. 62 engineering students in universities and 64 engineers in industry practices, totaling 126, were interviewed, and their conflict management styles toward supervisors and equally ranked peers were assessed using Thomas-Kilmann Conflict Mode Instrument. The cultural orientations are detected and articulated by the degree of people’s style adjustment that switches from one’s preferable style to another style to handle conflicts with his/her supervisors and peers differently. The results of the investigation data show that the adjustment of styles facing different situations clearly demonstrates the influences of cultural orientations. Our findings on Chinese cultural orientations (high power distance, femininity, and high uncertainty avoidance) may partially explain why Taiwanese-Chinese engineers prefer handling disputes through cumbersome administration routes and why most filed disputes will eventually escalate up to the central governmental authority for final settlements.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

We appreciate the students and the engineers who provided valuable data in our surveys. We thank the financial support from the R.O.C. National Science Council project (Grant No. UNSPECIFIEDNSC 96–2211-E-006–226). We must also acknowledge our indebtedness to Professor Janet Martinez and Professor Raymond Levitt at Stanford University for their kind sharing and insightful inspiration in this research.

References

Allred, K. G. (2000). “Distinguishing best and strategic practices: A framework for managing the dilemma between creating and claiming value.” Negotiation J., 16(4), 387–397.
Antonioni, D. (1998). “Relationship between the big five personality factors and conflict management styles.” Int. J. Confl. Manage., 9(4), 336–355.
Blake, R. R., and Mouton, J. S. (1964). The managerial grid, Gulf, Houston.
Cheung, S. O., Yiu, T. W., and Yeung, S. F. (2006). “A study of styles and outcomes in construction dispute negotiation.” J. Constr. Eng. Manage., 132(8), 805–814.
Chi, C. S. F. (2005). “Effective management of construction disputes.” MBA thesis, National Cheng Kung Univ., Tainan, Taiwan, R.O.C.
Christie, R., and Geis, F. L., (1970). Studies in Machiavellianism, Academic, San Diego.
Colorado Bar Association. (1995). Manual on alternative dispute resolution, The Alternative Dispute Resolution Committee of the Colorado Bar Association, Denver.
Fiske, S. T., and Taylor, S. E. (1991). Social cognition, 2nd Ed., Addison-Wesley, Reading, Mass.
Follett, M. P. (1940). The collected papers of Mary Parker Follet, H. C. Metcalf and K. Urwick, eds. Harper and Brothers, New York.
Gilkey, R. W., and Greenhalgh, L. (1986). “The role of personality in successful negotiating.” Negotiation J., 2(3), 245–256.
Gluck, G. A. (1983). Psychometric properties of the FIRO-B: A guide to research, Consulting Psychologists Press, Inc., Palo Alto, Calif.
Groton, J. P. (1997). “Alternative dispute resolution in the construction industry.” Dispute Resolut. J., 52(3), 49–57.
He, Z., Zhu, J. H., and Peng, S. (2001). “Cultural values and conflict resolution in enterprises in diverse cultural settings in China.” Chinese Conflict Management and Resolution, G. M. Chen and R. Ma, eds., Ablex, Westport, Conn., 129–148.
He, Z., Zhu, J. H., Peng, S., and Chen, X. (2002). “Patterns of cultural orientations and conflict resolution in three cultural groups.” Proc., Annual Conf. of the Association for Education in Journalism and Mass Communication, the Association for Education in Journalism and Mass Communication, Miami Beach, Fla.
Ho, S. P., and Liu, L. Y. (2004). “Analytical model for analyzing construction claims and opportunistic bidding.” J. Constr. Eng. Manage., 130(1), 94–104.
Hofstede, G. (1983). “National cultures in four dimensions.” Int. Stud. Manage. Organ., 13(1–2), 46–74.
Hofstede, G. (2006). Dimensionalizing cultures: The Hofstede model in context, W. J. Lonner, D. L. Dinnel, S. A. Hayes, and D. N. Sattler, eds., Center for Cross Cultural Research, Tilburg University Re-pository, The Netherlands, ⟨http://dbiref.uvt.nl/iPort?request=full_record&db=wo&language=eng&query=196101⟩ (Apr. 5, 2008).
Hofstede, G., and Bond, M. H. (1988). “The Confucius connection: from cultural roots to economic growth.” Organ. Dyn., 16(4), 4–21.
Hofstede, G., and Hofstede, G. J. (2005). Cultures and organizations: Software of the mind, 2nd Ed., McGraw-Hill, New York.
Javidan, M., and House, R. J. (2001). “Cultural acumen for the global manager: Lessons from project GLOBE.” Organisational Dyn., 29(4), 289–305.
Kahn, R. L., Wolfe, D. M., Quinn, P. R., Snoek, J. D., and Rosenthal, R. A. (1964). Organizational stress: Studies in role conflict and ambiguity, Wiley, New York.
Kilmann, R. H., and Thomas, K. W. (1977). “Developing a forced-choice measure of conflict-handling behavior: The ‘Mode’ instrument.” Educ. Psychol. Meas., 37, 309–325.
Knapp, L., Putnam, L. L., and Davis, L. J. (1988). “Measuring interpersonal conflict in organizations: Where do we go from here?” Manage. Commun. Quart., 1(3), 414–429.
Kuhn, S. (2003). “Prisoner’s dilemma.” Stanford Encyclopedia of Philosophy, E. N. Zalta, ed., ⟨http://plato.stanford.edu/archives/fall2003/entries/prisoner-dilemma/⟩ (Apr. 5, 2008).
Latham, M. (1933). “Trust and money.” Interim Rep. Prepared for the Joint Govt./Industry Rev. of Procurement and Contractual Arrangements in the United Kingdom Constr. Industry, Her Majesty’s Stationery Office, London.
Leung, K. (1987). “Some determinants of reaction to procedural models for conflict resolution: A cross-national study.” J. Pers. Soc. Psychol., 53, 898–908.
Leung, K. (1997). “Negotiation and reward allocations across cultures.” New perspectives on international industrial and organizational psychology, P. C. Earley and M. Erez, eds., Jossey-Bass, San Francisco, 640–675.
Leung, K., and Bond, M. H. (1984). “The impact of cultural collectivism on reward allocation.” J. Pers. Soc. Psychol., 47, 793–804.
Levin, P. (1998). Construction contract claims, changes and dispute resolution, 2nd Ed., ASCE, Reston, Va.
Lewicki, R. L., Weiss, S. F., and Lewin, D. (1992). “Models of conflict, negotiation, and third party intervention: A review and synthesis.” J. Pers. Soc. Psychol., 19, 35–49.
Mahalingam, A. A., Levitt, R. E., and Scott, W. R. (2005). “Cultural clashes in international infrastructure development projects: Which cultures matter?” Proc., CIB W92 Int. Symp. Construction Procurement, K. Sullivan and D. T. Kashiwagi, eds., CIB, Las Vegas, 29–38.
Markus, H. R., and Kitayama, S. (1991). “Culture and the self: Implications for cognition, emotion, and motivation.” Psychol. Rev., 98, 224–253.
Merna, A., and Bower, D. (1997). Dispute resolution in construction and infrastructure projects, Asia Law and Practice Publishing Limited, Hong Kong.
Moberg, P. J. (1998). “Predicting conflict strategy with personality traits: Incremental validity and the five factor model.” Int. J. Confl. Manage., 9(3), 258–285.
Moore, C. W. (1996). The mediation process: Practical strategies for resolving conflict, Jossey-Bass, San Francisco, 167–182.
Ock, J. H., and Han, S. H. (2003). “Lessons learned from rigid conflict resolution in an organization: Construction conflict case study.” J. Manage. Eng., 19(2), 83–89.
Prein, H. C. M. (1976). “Stijlen van conflicthantering [Styles of handling conflict].” Ned Tijdschr Psychol., 31, 321–346.
Rahim, M. A. (1983). “A measure of styles of handling interpersonal conflict.” Acad. Manage. J., 26, 368–376.
Rahim, M. A., Antonioni, D., and Psenicka, C. (2001). “A structural equations model of leader power, subordinates’ styles of handling conflict, and job performance.” Int. J. Confl. Manage., 12(3), 191–211.
Rahim, M. A., and Bonoma, T. V. (1979). “Managing organizational conflict: A model for diagnosis and intervention.” Psychol. Rep., 44, 1323–1344.
Rubin, J., Pruitt, D., and Kim, S. H. (1994). Social conflict: Escalation, stalemate and settlement, 2nd Ed., McGraw-Hill, New York.
Schutz, W. C. (1958). FIRO: A three-dimensional theory of interpersonal behavior, Holt, Rinehart, and Winston, New York.
Scott, S. (1997). “Delay claims in U.K. contractors.” J. Constr. Eng. Manage., 123(3), 238–244.
Scott, S., and Harris, R. A. (2004). “United Kingdom construction claims: Views of professionals.” J. Constr. Eng. Manage., 130(5), 734–741.
Shank, R. C., and Abelson, R. P. (1977). Scripts, plans, goals and understanding: An inquiry into human knowledge structures, Lawrence Erlbaum Associates, N.J.
Shell, R. G. (2001). “Bargaining styles and negotiation: The Thomas-Kilmann conflict mode instrument in negotiation training.” Negotiation J., 16(4), 155–174.
Singh, A., and Johnson, H. M. (1998). “Conflict management diagnosis at project management organizations.” J. Manage. Eng., 14(5), 48–63.
Sternberg, R. L., and Dobson, D. M. (1987). “Revolving interpersonal conflicts: An analysis of stylistic consistency.” J. Pers. Soc. Psychol., 52, 794–812.
Stinchcombe, A. L. (1959). “Bureaucratic and craft administration of production: A comparative study.” Adm. Sci. Q., 4, 168–187.
Thomas, K. W. (1976). “Conflict and conflict management.” Handbook of industrial and organizational psychology, M. D. Dunnette, ed., Rand McNally, Chicago, 71–86.
Thompson, R. M., Vorster, M. C., and Groton, J. P. (2000). “Innovations to manage disputes: DRB and NEC.” J. Manage. Eng., 16(5), 51–59.
Ting-Toomey, S. (1985). “Toward a theory of conflict and culture.” Communication culture, and organizational processes, W. B. Gudykunst and S. Ting-Toomey, eds., Sage Publications, Newbury Park, Calif., 71–86.
Tinsley, C. H. (2001). “How negotiators get to yes: Predicting the constellation of conflict management strategies used across cultures.” J. Appl. Psychol., 86(4), 583–593.
Triandis, H. C. (1972). The analysts of subjective culture, Wiley, New York
Triandis, H. C. (1995). Individualism and collectivism, Westview Press, Boulder, Colo.
Trompenaar, A. (2004). Managing people across cultures, Capstone Press, Minn.
Walton, R. E., and McKersie, R. B. (1965). A behavioral theory of labor negotiations: An analysis of a social interaction system, McGraw-Hill, New York.
Womack, D. F. (1988). “A review of conflict instruments in organizational settings.” Manage. Commun. Quart., 1(3), 437–445.
Womack, D. F. (1988a). “Assessing the Thomas-Kilmann conflict mode survey.” Manage. Commun. Quart., 1(3), 321–349.
Zack, J. G., Jr. (1993). “Claimsmanship: Current perspective.” J. Constr. Eng. Manage., 119(3), 480–497.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 135Issue 10October 2009
Pages: 955 - 964

History

Received: Apr 9, 2007
Accepted: May 21, 2009
Published online: Sep 15, 2009
Published in print: Oct 2009

Permissions

Request permissions for this article.

Authors

Affiliations

Jiin-Song Tsai [email protected]
Professor, Dept. of Civil Engineering, National Cheng Kung Univ., Tainan 70701, Taiwan, Republic of China (corresponding author). E-mail: [email protected]
Cheryl S. F. Chi [email protected]
Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Stanford Univ., Palo Alto, CA 94305. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share