Constructability Analysis of the Bridge Superstructure Rotation Construction Method in China
Publication: Journal of Construction Engineering and Management
Volume 132, Issue 4
Abstract
Constructability analysis can provide valuable input to optimizing urban bridge construction in terms of reducing impacts on traffic, safety, and overall project budget and duration. This paper presents a constructability analysis of the superstructure rotation method for bridge construction. The method includes building the bridge parallel to the obstacle being overpassed (a river or a highway) and then rotating the superstructure into place. The method has been used successfully in over one-hundred bridges (mostly in China). The paper documents two case studies of bridges that used this method and provides an analysis of the constructability of the method. This includes identification of the factors influencing the constructability of the methods and lists of design and construction objectives/strategies that support the constructability of bridges using this method.
Get full access to this article
View all available purchase options and get full access to this article.
References
Chen, B., Sun, C., and Chen, Y. (2001). “The application and development of rotating construction bridge in China.” J. Highw. Transp. Res. Devel., 18(2), 24–28.
Construction Industry Institute (CII). (1993). Constructability implementation guide, Austin, Tex.
Guan, Z. (1996). Bridge design specifications: Achievements of Sunan Canal Rehabilitation Project, JR Press, Jiangsu, China.
He, F. (2002). “The practice of rotating technique in highway bridge construction.” Proc., 1st Summit of Highway Technology in China, Beijing, 387–392.
He, Y., and Yi, X. (2000). “The optimization of construction method in Yajiasha Bridge.” J. Municipal Eng. Technol., 109, 38–41.
Hu, Y. (2001). “The rotating construction of Guangzhou Yajisha Bridge.” J. Highw., 2001(6), 16–24.
MOC (Ministry of Communication of the People’s Republic of China). (2003). “The 5th Ring Highway open today.” News pressroom of August 2003, ⟨http://www.moc.gov.cn/news/2003-08/t20031231_7063.htm⟩ (Oct., 5, 2004).
“Shipping on Zhujiang River being replanned.” (2003). Yangcheng Evening, Nov. 21, 3.
Yin, H. (2000). “The design consideration of Yajisha Bridge.” J. Fuzhou Univ. (Nat. Sci.), 28(4), 60–65.
Information & Authors
Information
Published In
Copyright
© 2006 ASCE.
History
Received: Feb 24, 2005
Accepted: Oct 19, 2005
Published online: Apr 1, 2006
Published in print: Apr 2006
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.