Sequence Planning for Electrical Construction

Publication: Journal of Construction Engineering and Management
Volume 132, Issue 4

Abstract

The sequences in which work is completed bear significantly on the performance of electrical contractors in building construction projects. When project work sequences are poorly planned or poorly executed, electrician constructors often must contend with compressed schedules, trade stacking, and out-of-sequence work to ensure timely completion of a project. This paper analytically evaluates the importance of sequence planning to efficient electrical work. It describes changes that were made to crew-level planning procedures for an electrical contractor and the impact these had on crew performance. The analysis shows that sequence planning at both the project level and the crew level are important to the performance of electrical crews. Most notably, a strong correlation (0.73) was detected between crew planning performance one week and crew productivity performance in the following week. Results of the study are provided. Principles of sound sequences and guidelines for sequence planning are also captured from the analysis. These sequence guidelines are designed to avoid, where possible, the often adverse project conditions in which electrical contractors find themselves and to handle those conditions most effectively when they cannot be avoided.

Get full access to this article

View all available purchase options and get full access to this article.

References

Ballard, G., and Howell, G. (1998). “Shielding production: Essential step in production control.” J. Constr. Eng. Manage., 124(1), 11–17.
Echeverry, D., Ibbs, C. W., and Kim, S. (1991). “Sequencing knowledge for construction scheduling.” J. Constr. Eng. Manage., 117(1), 118–130.
Horman, M. J., and Salyards, D. (2002). “Foreman-level sequence planning.” Proc., 10th Annual PACE Research Seminar, Penn State University, State College, Pa.
Korman, T. M., Fischer, M. A., and Tatum, C. B. (2003). “Knowledge and reasoning for MEP coordination.” J. Constr. Eng. Manage., 129(6), 627–634.
Matilla, K. G., and Park, A. (2003). “Comparison of linear scheduling model and repetitive scheduling method.” J. Constr. Eng. Manage., 129(1), 56–64.
Riley, D. R., and Sanvido, V. E. (1995). “Patterns of construction-space use in multistory buildings.” J. Constr. Eng. Manage., 121(4), 464–473.
Riley, D. R., Sanvido, V., and Mace, B. (2002). Sequence guidelines for mechanical/electrical contractors, Electrical Contractors Foundation, Bethesda, Md.
Thomas, H. R. (2000a). “Principles of construction labor productivity measurement and processing.” Rep. No. 2K14, Pennsylvania Transportation Institute, University Park, Pa.
Thomas, H. R. (2000b). “Schedule acceleration, work flow, and labor productivity.” J. Constr. Eng. Manage., 126(4), 261–267.
Thomas, H. R., and Horman, M. J. (2006). “Fundamental principles of workforce management.” J. Constr. Eng. Manage., 132(1), 97–104.
Thomas, H. R., and Sanvido, V. E. (2000). “Role of the fabricator in labor productivity.” J. Constr. Eng. Manage., 126(5), 358–365.
Thomas, H. R., Horman, M. J., and de Souza, U. E. L. (2005). “Symbiotic crew relationships and labor flow.” J. Constr. Eng. Manage., 130(6), 908–917.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 132Issue 4April 2006
Pages: 363 - 372

History

Received: Nov 29, 2004
Accepted: Aug 16, 2005
Published online: Apr 1, 2006
Published in print: Apr 2006

Permissions

Request permissions for this article.

Authors

Affiliations

Michael J. Horman
Assistant Professor of Architectural Engineering, Penn State Univ., 211 Engineering Unit A, University Park, PA 16802.
Matthew P. Orosz
Project Manager, Truland Systems Corporation.
David R. Riley
Associate Professor of Architectural Engineering, Penn State Univ., 220 Engineering Unit A, University Park, PA 16802.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share