TECHNICAL PAPERS
Dec 1, 2005

Development and On-Site Evaluation of an Automated Materials Management and Control Model

Publication: Journal of Construction Engineering and Management
Volume 131, Issue 12

Abstract

Materials resources constitute a large portion of a project’s total cost and this makes them an important and attractive subject to control. Proper control and management of materials can meaningfully increase productivity by 6%, or more. A model based on automatic, or semiautomatic, data collection for materials management and control was developed. Based on project plans, the model initiates and manages the ordering of materials automatically and monitors both the actual flow of materials and the current stock at the construction site. The model permits real-time control, enabling corrective actions to be taken. In this manner, costs and unnecessary handling of materials are reduced. In addition, up-to-date information regarding materials flow is available and different statistical analyses are enabled: materials acquired from a specific supplier; materials used for a specific activity; and materials used during a specific month, etc. The information generated by the model enables the updating of a historical database to be used for planning of future projects.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgment

The writers would like to thank Dr. Cliff Schexnayder for his useful comments.

References

Akintoye, A. (1995). “Just-in-time application for building material management.” Constr. Manage. Econom., 13(2), 105–113.
Bell, L. C., and Stukhart, G. (1987). “Costs and benefits of materials management systems.” J. Constr. Eng. Manage., 113(2), 222–234.
Chai, S., and Yitzchakov, E. (1995). Business logistics: An integrated approach to materials acquisition and inventory, The Israel Institute of Productivity, School of Management, Tel Aviv, Israel (in Hebrew).
Chen, Z., Li, H., and Wong, C. T. C. (2002). “An application of bar-code system for reducing construction wastes.” Autom. Constr., 11(5), 521–533.
Cheng, M. Y., and Chen, J. C. (2002). “Integrating bar-code and GIS for monitoring construction progress.” Autom. Constr., 11(1), 23–33.
Choo, H. J., Tommelein, I. D., Ballard, G., and Zabelle, T. R. (1998). “WorkPlan: Constraint-based database for work package scheduling.” J. Constr. Eng. Manage., 125(3), 151–160.
Construction Industry Institute (CII). (1987). Project materials management handbook, Austin, Tex.
Echeverry, D., and Beltran, A. (1997). “Bar-code control of construction field personnel and construction materials.” Proc., 4th Congress on Computing in Civil Engineering, Philadelphia, 341–347.
Formoso, C. T., and Revelo, V. H. (1999). “Improving the materials supply system in small-sized building firms.” Autom. Constr., 8(6), 663–670.
Formoso, C. T., Soibelman, L., Cesare, C. D., and Isatto, E. L. (2002). “Material waste in building industry: Main causes and prevention.” J. Constr. Eng. Manage., 128(4), 316–325.
Hendrickson, C., and Au, T. (1989). Project management for construction, Prentice Hall, Englewood Cliffs, N.J.
Jaselskis, E. J., Anderson, M. R., Jahren, C. T., Rodriguez, Y., and Njos, S. (1995). “Radio-frequency identification applications in construction industry.” J. Constr. Eng. Manage., 121(2), 189–196.
Jaselskis, E. J., and El-Misalami, T. (2003). “Implementing radio frequency identification in the construction process.” J. Constr. Eng. Manage., 129(6), 680–688.
Li, H., Chen, Z., Yong, L., and Kong, S. C. W. (2005). “Application of integrated GPS and GIS technology for reducing construction waste and improving construction efficiency.” Autom. Constr., 14(3), 323–331.
Li, H., Kong, C. W., Pang, Y. C., Shi, W. Z., and Yu, L. (2003). “Internet-based geographical information systems system for E-commerce application in construction material procurement.” J. Constr. Eng. Manage., 129(6), 689–697.
Plemmons, J. K., and Bell, L. C. (1995). “Measuring effectiveness of materials management process.” J. Manage. Eng., 11(6), 26–32.
Poon, C. S., Yu, A. T. W., and Jaillon, L. (2004). “Reducing building waste at construction sites in Hong Kong.” Constr. Manage. Econom., 22(5), 461–470.
Saidi, K. S., Haas, C., and Balli, N. (2002). “The value of handheld computers in construction.” Proc., 19th International Symp. on Automation and Robotics in Construction (ISARC), Gaithersburg Md., 557–562.
Saidi, K. S., Lytle, A. M., and Stone, W. C. (2003). “Report of the NIST workshop on data exchange standards at the construction job site.” Proc., ISARC 2003 The Future Site, Eindhoven, The Netherlands, 617–622.
Thomas, H. R., and Sanvido, V. E. (2000). “Role of fabricator in labor productivity.” J. Constr. Eng. Manage., 126(5), 358–365.
Williams, T. P. (2003). “Applying handheld computers in the construction industry.” Pract. Period. Struct. Des. Constr., 8(4), 226–231.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 131Issue 12December 2005
Pages: 1328 - 1336

History

Received: Nov 22, 2004
Accepted: May 6, 2005
Published online: Dec 1, 2005
Published in print: Dec 2005

Permissions

Request permissions for this article.

Authors

Affiliations

R. Navon, M.ASCE [email protected]
Associate Professor, Head, Construction Engineering & Management; and Head, Construction Automation Laboratory, Faculty of Civil Engineering, Israel Institute of Technology, Technion City, 32000 Haifa, Israel (corresponding author). E-mail: [email protected]
O. Berkovich [email protected]
Development Engineer, Elbit Ltd.; formerly, MSc Candidate. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share