TECHNICAL PAPERS
Jan 16, 2004

Probabilistic Forecasting of Project Performance Using Stochastic S Curves

Publication: Journal of Construction Engineering and Management
Volume 130, Issue 1

Abstract

This study presents a new methodology for evaluating at-completion project performance status. This new procedure uses the concept of stochastic S curves (SS curves) to determine forecasted project estimates as an alternative to using deterministic S curves and traditional forecasting methods. A simulation approach is used for generating the stochastic S curves, and it is based on the defined variability in duration and cost of the individual activities within the process. Stochastic S curves provide probability distributions for the budget and time values required to complete the project at every selected point of intermediate completion. Final project performance is determined by comparing the planned budget and project duration, with the expected forecasted final cost and elapsed time, respectively. The SS-curve methodology permits objective evaluation of project performance without the limitations inherent in a deterministic approach. The probabilistic characteristics of this approach enable users to more accurately determine at-completion cost and duration variations and evaluate the performance improvement of proposed corrective actions.

Get full access to this article

View all available purchase options and get full access to this article.

References

Ahuja, H. N., Dozzi, S. P., and AbouRizk, S. M. (1994). Project management, 2nd Ed., Wiley New York.
Antill, J. M., and Woodhead, R. W. (1990). Critical path methods in construction practice, 4th Ed., Wiley, New York.
Barraza, G. A. (1998). “Probabilistic project control using integrated stochastic S Curves.” PhD dissertation, Tecnólogico de Monterrey, Monterrey, NL, México.
Barraza, G. A., Back, W. E., and Mata, F.(2000). “Probabilistic monitoring of project performance using SS-curves.” J. Constr. Eng. Manage., 126(2), 142–148.
Crandall, K. C., and Woolery, J. C.(1982). “Schedule development under stochastic scheduling.” J. Constr. Div., Am. Soc. Civ. Eng., 108(2), 321–329.
Dawood, N., and Molson, A. (1997). “An integrated approach to cost forecasting and construction planning for the construction industry.” Proc., Computing in Civil Engineering, ASCE, Reston, Va., 535–542.
Fishman, G. S. (1978). Principles of discrete simulation, Wiley, New York.
Neil, J. (1987). “Project control for construction. Construction industry institute.” Publication 6-5, Univ. of Texas, Austin, Tex.
Oberlander, G. D. (1993). Project management for engineering and construction, McGraw-Hill, New York.
Rao, G., and Grobler, F. (1995). “Integrated analyses of cost risk and schedule risk.” Proc., 2nd Congress in Computers in Civil Engineering, ASCE, New York, 1404–1411.
Teicholz, P.(1993). “Forecasting final cost and budget of construction projects.” J. Comput. Civ. Eng., 7(4), 511–529.
Touran, A.(1993). “Probabilistic cost estimating with subjective correlations.” J. Constr. Eng. Manage., 119(1), 58–71.
U.S. Department of Energy (U.S. DOE). (1979). “Cost and schedule control systems criteria for contract performance measurement.” DOE/CR-0014, Washington, D.C.
Vergara, A., and Boyer, L.(1974). “Probabilistic approach to estimating and cost control.” J. Constr. Div., Am. Soc. Civ. Eng., 100(4), 543–552.
Ward, S. A., and Lithfield, T. (1980). Cost control in design and construction, McGraw-Hill, New York.
Wheelwright, C. (1995). Forecasting methods for management, 4th Ed., Wiley, New York.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 130Issue 1February 2004
Pages: 25 - 32

History

Received: Sep 21, 2000
Accepted: Jul 1, 2002
Published online: Jan 16, 2004
Published in print: Feb 2004

Permissions

Request permissions for this article.

Authors

Affiliations

Gabriel A. Barraza, M.ASCE
Professor, Graduate School of Business Administration, Tec de Monterrey, Monterrey NL 64849, Mexico.
W. Edward Back, A.M.ASCE
Assistant Professor, Dept. of Civil Engineering, Clemson Univ., Clemson, SC 29630.
Fernando Mata
Professor, Graduate School of Business Administration, Tec de Monterrey, Monterrey NL 64849, Mexico.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share