Managing Constructibility Reviews to Reduce Highway Project Durations
Publication: Journal of Construction Engineering and Management
Volume 130, Issue 1
Abstract
Highway project durations that are longer than necessary delay the delivery of benefits to road users. Budget constraints often preclude the use of additional funds to shorten total project duration. Therefore, state highway agencies seek ways to decrease construction project durations without increasing costs. Research has recommended formal constructibility reviews as an effective approach to meeting this goal. Formalized constructibility reviews have been effective in isolated cases but only about one-quarter of state highway agencies currently have a formal constructibility review program. An inadequate understanding of implementation issues, including the effective use of resources, is a potential cause. The effects of constructibility reviews on the design phase, construction phase, and project durations are modeled and analyzed. Results illustrate and explain how intermediate-sized constructibility reviews reduce project durations more than very large or small reviews and the potential impacts of a design-build approach on constructibility review effectiveness.
Get full access to this article
View all available purchase options and get full access to this article.
References
Abdel-Hamid, T.(1988). “Understanding the ‘90% Syndrome’ in Software Project Management: A Simulation-Based Case Study.” J. Syst. Softw., 8, 319–330.
American Association of State and Highway Transportation Officials (AASHTO). (2000). Constructibility review best practices guide, Final draft, July 31, 2000.
Anderson, S. D., and Fisher, D. J. (1997a). “Constructibility review process for transportation facilities.” National Cooperative Highway Research Program, Rep. No. 390, National Academy Press, Washington, D.C.
Anderson, S. D., and Fisher, D. J. (1997b). “Constructibility review process for transportation facilities—Workbook. National Cooperative Highway Research Program, Rep. 391, National Academy Press, Washington, D.C.
Anderson, S., Fisher, D., and Rahman, S.(1999). “Constructibility issues for highway projects.” J. Manage. Eng., 15(3), 60–68.
Construction Industry Institute (CII). (1989). “Concepts and methods of schedule compression.” Construction Industry Institute Publication No. 6-7, The University of Texas at Austin, Austin, Tex.
Construction Industry Institute (CII). (1993). “Constructibility implementation guide.” Construction Industry Institute Publication No. 34-1, The University of Texas at Austin, Austin, Tex.
Construction Industry Institute (CII). (1995). “Schedule reduction.” Construction Industry Institute Publication No. 41-1, The University of Texas at Austin, Austin, Tex.
Cooper, K. G.(1980). “Naval ship production: A claim settled and a framework built.” Interfaces, 10(6), 20–36.
Cooper, K. G.(1993). “The change cycle: Benchmarks for the project manager.” Proj. Manage J., 24(1), 17–22.
DeWitt, S. D. (1999). “Subcommittee constructibility survey.” Presentation to the AASHTO Subcommittee on Construction, August 1–5.
Eldin, N. (1996). “An investigation of schedule reduction techniques for the engineering and construction industry.” Construction Industry Institute Research Rep. No. 41-11, The University of Texas at Austin, Austin, Tex.
Ellis, R. D., Kumar, A., and Ahmed, Q. A. (1992). “Life cycle reconstructibility.” Rep. No. FL/DOT/RMC/99700-7557-119, Florida Department of Transportation, Tallahassee, Fla.
Federal Highway Administration. (1995). “Special experimental project No. 14.” U.S. Department of Transportation, 〈http://www.fhwa.dot.gov/////programadmin/contracts/050495.htm〉
Federal Highway Administration. (2002). “Federal Highway Administration.” U.S. Department of Transportation, 〈http://www.fhwa.dot.gov/〉
Fisher, D. J., and Rajan, N.(1996). “Automated Constructibility Analysis of Work-Zone Traffic-Control Planning.” J. Constr. Eng. Manage., 122(1), 36–43.
Ford, David N. (1995). “The dynamics of project management: An investigation of the impacts of project process and coordination on performance.” Doctoral thesis, Massachusetts Institute of Technology, Cambridge, Mass.
Ford, 36–43, David, N., and Sterman, J. D.(1998). “Dynamic modeling of product development processes.” Syst. Dyn. Rev., 14(1), 31–68.
Ford, David N., and Sterman, J. D.(2003). “The liar’s club: Concealing rework in concurrent development.” Concurrent Eng. Res. Appl., 111(3), 211–219.
Forrester, Jay W. (1961). Industrial dynamics, Productivity Press, Cambridge, Mass.
Forrester, Jay, and Senge, Peter (1980). “Tests for building confidence in system dynamics models.” TIMS Studies in the Management Sciences, Monograph No.14, 209–228.
Hugo, F., O’Connor, J. T., and Ward, W. V. (1990). “Highway construct* ability guide. Investigation of highway project constructability improvement.” Research Project No. 3-6-88-1149, The Center for Transportation Research, The University of Texas at Austin.
Limam, M. (1995). “Constructability review process framework for transportation facilities.” MS thesis, Texas A&M University, College Station, Tex.
Lyneis, J. M., Cooper, K., and Els, S. A.(2001). “Strategic management of complex projects: a case study using system dynamics.” Syst. Dyn. Rev., 17(3), 237–260.
Mendelsohn, R.(1997). “The constructibility review process: A constructor’s perspective.” J. Manage. Eng., 13(3), 17–19.
O’Connor, J. T., Hugo, F., and Stamm, E. M.(1991). “Improving highway specifications for constructibility.” J. Constr. Eng. Manage., 117(2), 242–258.
Rodrigues, A., and Williams, T. M.(1997). “System dynamics in project management: assessing the impacts of client behavior on project performance.” J. Oper. Res., 49, 2–15.
Russell, J. S., and Anderson, S. D. (2000). “Construction engineering and management research program.” Rep. No. 10-58, National Cooperative Highway Research Program.
Russell, J. S., and Swiggum, K. E. (1994). “Investigation of constructibility concepts and tools for highway construction.” Rep. No. WI/SPR-05-94, Wisconsin Department of Transportation.
Scott, S. (1997). “Contract management techniques for improving construction quality.” Publication No. FHWA-RD-97-067, Federal Highway Administration, Washington, DC.
Sterman, J. S. (2000). Business dynamics, systems thinking and modeling for a complex world, McGraw-Hill, New York.
Ward, A., Liker, J., Cristiano, J., and Sobek, D.(1995). “The second Toyota paradox: how delaying decisions can make better cars faster.” Sloan Manage. Rev., 36(3), 43–61.
Information & Authors
Information
Published In
Copyright
Copyright © 2004 American Society of Civil Engineers.
History
Received: May 30, 2002
Accepted: Nov 6, 2002
Published online: Jan 16, 2004
Published in print: Feb 2004
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.