Cultural Considerations in International Construction Contracts
Publication: Journal of Construction Engineering and Management
Volume 129, Issue 4
Abstract
International construction projects involve multinational participants from different political, legal, economic, and cultural backgrounds. As one of the major issues affecting the management of international construction projects, culture deserves wide research. This paper aims to establish a valid groundwork for further research on the impact of cultural issues on contractual arrangements; conflict causation, and the selection of dispute resolution mechanisms for international construction projects. The paper reviews the characteristics of international construction activities and discusses the cultural context. It sets the research background for disseminating the findings of two surveys, carried out in Hong Kong and in London and Sydney. The study identifies the important features expected for the contract of international construction projects and ascertains their significance to further in-depth research.
Get full access to this article
View all available purchase options and get full access to this article.
Reference
Aniekwu, A. N., and Okpala, D. C.(1988). “The effect of systemic factors on contract services in Nigeria.” Constr. Manage. Econom., 6, 171–182.
Broster, J. (1976). The Thembu: Their beadwork, songs, and dances, Purnell, Cape Town, South Africa.
Chan, E. H.(1997). “Amicable dispute resolution in the PRC: Implication for foreign-related construction disputes.” Constr. Manage. Econom., 15(6), 539–548.
Chan, E. H., and Chan, T. S.(1999). “Imposing ISO 9000 quality assurance system on statutory agents in Hong Kong.” J. Constr. Eng. Manage., 125(4), 285–291.
Cheung, S. O.(1998). “Value of alternative dispute resolution in construction.” Constr. Law J., 14(2), 101–110.
Clark, H., and Ip, A. (1999). “The Peifan-Lucky Star—A car for China.” Design Manage. J., Fall, 21–28.
Cremades, B. M.(1998). “Overcoming the clash of legal cultures: The role of interactive arbitration.” Arbit. Int., 14(2), 157–172.
Diekmann, J. E., and Girard, M. J.(1995). “Are contract disputes predictable?” J. Constr. Eng. Manage., 121(4), 355–363.
Fellow, R. F., and Hancock, R. (1994). “Conflict resulting from cultural differentiation: An investigation of the new engineering contract.” Council of International Construction Research and Documentation Proc. on Construction Conflict: Management and Resolution, Rotterdam, The Netherlands, 259–267.
Fenn, P., O’Shea, M., and Davies, E. (1998). Dispute resolution and management in construction: An international review, E&FN Spon, London.
Hofstede, G. (1984). Culture’s consequences: International differences in work-related values, abridged Ed., Sage, Beverly Hills, Calif.
Hofstede, G. (1997). Cultures and organization: Software of the mind, Revised Ed., McGraw-Hill, New York.
Kumaraswamy, M., and Yogeswaran, K.(1998). “Significant sources of construction claims.” Int. Constr. Law Rev., 15(1), 145–159.
Latham, M. (1994). Constructing the Team, Her Majesty’s Stationery Office, London.
Loosemore, M.(1999). “International construction management research—Cultural sensitivity in methodological design.” Constr. Manage. Econom., 17(5), 553–561.
Low, S. P.(1996). “The influence of Chinese philosophies on mediation and conciliation in the Far East.” Arbitration: J. Chartered Inst. Arbitrators, 62(1), 11–20.
Ofori, G.(1984). “Improving the construction industry in deciding developing countries.” Constr. Manage. Econom., 2, 127–132.
Ofori, G.(1991). “Programmes for improving the predominance of contracting firms in developing countries: A review of approaches and appropriate options.” Constr. Manage. Econom., 9, 19–38.
Sheath, D. M., Jaggar D., and Hibberd, P. (1994). “Construction procurement criteria: A multi-national study of the major influencing factors.” Proc., CIB W92 Symp. East Meets West, Hong Kong Univ., Hong Kong, Rotterdam, The Netherlands, 361–370.
Shilston, A., and Hughes, A. (1997). “International aspects of construction law, the building of construction law.” 10th Annual Construction Conf., Centre of Construction Law and Management, King’s College London, Section 1-II, 1–15.
Simon, H. A. (1987). “Rationality in psychology and economics.” R. M. Hogarth and M. W. Reder, eds., Rational choice—The contrast between economics and psychology, Univ. of Chicago Press, Chicago, 25–40.
Singh, A.(1998). “International ADR involving an Indian party.” Int. Constr. Law Rev., 15(3), 430–452.
Stebblings, S. B. (1998). “Dispute resolution in major projects.” International Dispute Resolution Conf., Hong Kong International Arbitration Centre, Hong Kong SAR, 5.
Trompenaars, F., and Williams, P. (1999). “First-class accommodation, people management.” International personnel development, April 23, 30.
Tso, J. (1999). “Do you dig up dinosaur bones? Anthropology, business, and design,” Design Manage. J., Fall, 69.
Turin, D. (1972). Construction and development: A framework for research and action, Univ. College Environmental Research Group, London.
Uff, J. (1998). “Dispute resolution in large scale international construction projects.” International Dispute Resolution Conf., Hong Kong International Arbitration Centre, Hong Kong SAR, 11.
Vorster, M. C. (1993). Dispute prevention and resolution, Virginia Polytechnic Institute and State Univ., Blacksburg, Va.
Walker, A., and Rowlinson, S. (1990). The building of Hong Kong, Hong Kong University Press, Hong Kong.
Information & Authors
Information
Published In
Copyright
Copyright © 2003 American Society of Civil Engineers.
History
Received: Feb 6, 2001
Accepted: Jul 1, 2002
Published online: Jul 15, 2003
Published in print: Aug 2003
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.