TECHNICAL PAPERS
May 15, 2003

Estimating Future Highway Construction Costs

Publication: Journal of Construction Engineering and Management
Volume 129, Issue 3

Abstract

The objective of this research was to develop a model that estimates future highway construction costs in Louisiana. The model describes overall highway construction cost in terms of a highway construction cost index. The index is a composite measure of the cost of construction labor, materials, and equipment; the characteristics of contracts; and the environment in which contracts are let. Future construction costs are described in terms of predicted index values based on forecasts of the price of construction labor, materials, and equipment and the expected contract characteristics and contract environments. The contract characteristics and contract environments that are under the control of highway agency officials, can be manipulated to reflect future cost-cutting policies. Application of the model in forecasting to highway construction costs in Louisiana shows that the model closely replicates past construction costs for the period 1984–1997. When applied to forecasting future highway construction costs, the model predicts that highway construction costs in Louisiana will double between 1998 and 2015. Applying cost-cutting policies and assuming input costs are 20% less than anticipated, the model estimates highway construction costs will increase by 75% between 1998 and 2015.

Get full access to this article

View all available purchase options and get full access to this article.

References

Elhag, T. M. S., and Boussebaine, A. H. (1998). “Factors affecting cost and duration of construction projects.” EPSRC Research Rep. Phase (1), School of Architecture and Building Engineering, Univ. of Liverpool, Liverpool, U.K.
Fayek, A.(1998). “Competitive bidding strategy model and software system for bid preparation.” J. Constr. Eng. Manage., 124(1), 1–10.
Hartgen, D. T., Bowman, V. B., and Horner, M. W. (1997). “Baseline market forecasts for state highway construction engineering, maintenance and administration programs 1997–2001.” Transportation Publication Number 151, Center for Interdisciplinary Transportation Studies, Univ. of North Carolina, Charlotte, N.C.
Hartgen, D. T., and Talvitie, A. P. (1995). “Comparative performance of transportation systems: Pitfalls and prospects.” Proc., World Conf. on Transit Research, Sydney, Australia.
Hegazy, T., and Ayed, A.(1998). “Neural network model for parametric cost estimation of highway projects.” J. Constr. Eng. Manage., 124(3), 210–218.
Herbsman, Z. (1986). “Model for forecasting highway construction cost.” Transportation Research Record 1056, Transportation Research Board, Washington, D.C., 47–54.
Koehn, E., Fallon, B., Seling, F., and Young, R.(1978). “Cost of delays in construction.” J. Constr. Div., Am. Soc. Civ. Eng., 104(3), 323–331.
Koppula, S. D.(1981). “Forecasting engineering costs: two case studies.” J. Constr. Div., Am. Soc. Civ. Eng., 107(4), 733–743.
Olson, R. M., and Epps, J. A. (1981). “Construction cost trend.” Research Rep. 214–29, Texas A&M Univ., College Station, Tex.
Pindyck, R. S., and Rubinfeld, D. L. (1981). Econometric models and economic forecasts, 2nd Ed., McGraw-Hill, New York.
Stevens, J. D. (1995). “Cost estimating and forecasting for highway work in Kentucky.” Research Rep. KTC 95-12, Kentucky Transportation Center, University of Kentucky, Lexington, Ky.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 129Issue 3June 2003
Pages: 272 - 279

History

Received: Jan 25, 2001
Accepted: May 21, 2002
Published online: May 15, 2003
Published in print: Jun 2003

Permissions

Request permissions for this article.

Authors

Affiliations

C. G. Wilmot, M.ASCE
Associate Professor, Louisiana Transportation Research Center and Dept. of Civil and Environmental Engineering, Louisiana State Univ., Baton Rouge, LA 70803-6405.
G. Cheng, P.E.
Civil Engineer, GEC, Inc., 9357 Interline Ave., Baton Rouge, LA 70809.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share