TECHNICAL PAPERS
Apr 1, 2002

Concessionaire Selection for Build-Operate-Transfer Tunnel Projects in Hong Kong

Publication: Journal of Construction Engineering and Management
Volume 128, Issue 2

Abstract

A significant realignment of risks between project participants is a fundamental facet of the new procurement paradigm of BOT (build-operate-transfer). A BOT concessionaire assumes far more and deeper risks than a contractor. One critical contributor to the success of a BOT project is the selection of an appropriate concessionaire who has the necessary capacity to provide the best overall deal throughout the build-operate-transfer process. However, various BOT-type procurement protocols are not yet proven and are still being tried and tested. Many countries are at the lower ends of their learning curves. Therefore, there is a need to benchmark the best practices that have been emerging. The Hong Kong government has developed a well-structured concessionaire selection framework supported by the Kepner-Tregoe decision analysis technique. This paper analyzes and draws experiences and lessons from this concessionaire selection practice. Current concessionaire selection practices worldwide are also discussed with a view to improve the procurement process of regions lacking in such experiences or expertise.

Get full access to this article

View all available purchase options and get full access to this article.

References

Hatush, Z., and Skitmore, M.(1997). “Criteria for contractor selection.” Constr. Manage. Econom., 15(1), 15–38.
Hong Kong Government. (1992). Western harbor crossing project brief, Hong Kong.
Kepner, C. H., and Tregoe, B. B. (1981). The new rational manager, Princeton Research Press, Princeton, N.J.
Kumaraswamy, M. M., and Zhang, X. Q.(2001). “Government role in BOT-led infrastructure development.” Int. J. Proj. Manage., 19, 195–205.
Lumby, S. (1991). Investment appraisal and financing decisions: a first course in financial management, Chapman & Hall, London.
Merna, A., and Smith, N. J. (1996). Guide to the preparation and evaluation of build-own-operate-transfer (BOOT) project tenders, Asia Law & Practice, Hong Kong.
Moody, P. E. (1983). Decision making: proven methods for better decisions, McGraw-Hill, New York.
Smith, N. J. (1995). Engineering project management, Blackwell, Oxford, U.K.
Tiong, R. L. K., and Alum, J.(1997). “Evaluation of proposals for BOT projects.” Int. J. Proj. Manage., 15(2), 67–72.
Woodward, D. G.(1995). “Use of sensitivity analysis in build-own-operate-transfer project evaluation.” Int. J. Proj. Manage., 13(4), 239–246.
Zhang, X. Q., and Kumaraswamy, M. M.(2001). “Hong Kong experience in managing BOT projects.” J. Constr. Eng. Manage., 127(2), 154–162.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 128Issue 2April 2002
Pages: 155 - 163

History

Received: Sep 7, 2000
Accepted: May 14, 2001
Published online: Apr 1, 2002
Published in print: Apr 2002

Permissions

Request permissions for this article.

Authors

Affiliations

X. Q. Zhang
Research Assistant, Dept. of Civil Engineering, The Univ. of Hong Kong, Pokfulam Rd., Hong Kong, China.
M. M. Kumaraswamy, M.ASCE
Associate Professor, Dept. of Civil Engineering, The Univ. of Hong Kong, Pokfulam Rd., Hong Kong, China.
W. Zheng
Research Assistant, Dept. of Civil Engineering, The Univ. of Hong Kong, Pokfulam Rd., Hong Kong, China.
E. Palaneeswaran
Research Assistant, Dept. of Civil Engineering, The Univ. of Hong Kong, Pokfulam Rd., Hong Kong, China.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share