Abstract

The problem of cost overrun, especially in the construction industry, is a worldwide phenomenon, and its ripples are normally a source of friction between clients and contractors on the issue of price variation. If this friction is not properly handled, this could stall the progress of work and may subsequently lead to project abandonment. Although the causes of project cost overrun are well known, the methodology used in handling its evaluation, especially on those aspects relating to price variation, is very inadequate. This research is aimed at developing a suitable model for the evaluation of cost overrun during project execution, focusing primarily on cost effect with respect to the extent of work done, payment schedule, and government fiscal/monetary policies. Based mainly on discounted cash flow of the expected income compared with the actual payment at various time periods with inflationary rate as the discounting factor, this model has been used successfully in evaluating price variations of two state-owned projects—the grain silo at Okigwe and the soybean milk factory at Ubakala in Umuahia, both in Nigeria. The model has also proved useful at conflict resolution (between the contractors and clients) arising from price variation claims by many Nigerian contracting firms and has the potential of adaptability in other parts of the world.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Akpan, E. O. P. ( 1987). “Stochastic network scheduling system for optimum resource utilization.” PhD thesis, University of Bradford, Bradford, England.
2.
Akpan, E. O. P., and Ukairo, A. ( 1998). “An interface matrix for efficient project performance.” Quantity Surveyor—J. Nigerian Inst. of Quantity Surveyors, Lagos, Nigeria, 28(3), 23–26.
3.
Carelli, G. ( 1989). “The Manaus Opera House.” Icaro, Varig Inflight Mag., Sao Paulo, Brazil, 59, 17.
4.
Chizea, F. E. ( 1991). “Application of network analysis technique to construction tendering for the control of construction failures in Nigeria.” PhD thesis, Federal University of Technology, Owerri, Nigeria.
5.
Coulthrust, N., and McAuley, L. ( 1990). Cost and management accounting, Longman's, London, 23–265.
6.
Dornbusch, R., and Fischer, S. ( 1993). “Moderate inflation.” World Bank Economic Rev., 7(1), 1.
7.
Kayode, M. O. ( 1979). “The art of project evaluation.” University Press, Ibadan, Nigeria, 40.
8.
Kallo, G. G. (1996). “Estimating loss of productivity claims.”J. Mgmt. in Engrg., ASCE, 12(6), 13–15.
9.
Lucey, T. ( 1994). Quantitative techniques, 4th Ed., English Language Book Society/DP Publication, London.
10.
Olhnger, J., and Wikner, J. ( 2000). “Production planning and control.” J. Production Plng. and Control, London, 11(3), 210–222.
11.
Orji, H. O. ( 1988). “Construction financing in Nigeria: A banking perspective.” Financial Rev., Lagos, Nigeria, 1(4), 12–13.
12.
Pohl, G., and Mihaljek, D. ( 1992). “Project evaluation and uncertainty in practice: A statistical analysis of rate of return divergencies of 1015 World Bank projects.” World Bank Economic Rev., 6(2), 260– 275.
13.
Tung, A., and Hendrickson, C. (1986). “Profit measures for construction projects.”J. Constr. Engrg. and Mgmt., ASCE, 112(2), 273–286.
14.
Woodward, J. F. ( 1975). Quantitative methods in construction management and design, Arrowsmith Ltd., Bristol, England, 26–138.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 127Issue 5October 2001
Pages: 367 - 373

History

Received: Aug 3, 1999
Published online: Oct 1, 2001
Published in print: Oct 2001

Permissions

Request permissions for this article.

Authors

Affiliations

Assoc. Prof., Dept. of Proj. Mgmt. Technol., Fed. Univ. of Technol., P.M.B. 1526, Owerri—Imo State, Nigeria.
Managing Dir., Alpha Star Projects Ltd., Ste. 32, Wuse Neighbourhood Ctr., Zone 3, Wuse, Abuja, Nigeria.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share