Probabilistic Monitoring of Project Performance Using SS-Curves
Publication: Journal of Construction Engineering and Management
Volume 126, Issue 2
Abstract
The purpose of this study was to develop a new concept of project control. This new concept uses stochastic S-curves (SS-Curves) as an alternative to using the deterministic S-curve technique commonly employed in professional practice. SS-curves are developed by determining the activity level variability in cost and duration. Simulation is the recommended approach for obtaining SS-curves, similar to the way that stochastic schedules are currently developed. SS-curves provide probability distributions for expected cost and duration for a given percentage of work completed. Monitoring project performance is performed by comparing the most likely budget and duration values, obtained from respective probability distributions for actual progress, with the project's actual data and cumulative cost. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs and duration, rather than utilizing only one possible deterministic outcome. Given the probabilistic characteristics of SS-curves, additional benefits are presented that enable a more comprehensive project control methodology.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Bent, J., and Humphreys, K. (1996). Effective project management through applied cost and schedule control. Marcel Dekker, New York.
2.
Crandall, K. C. (1976). “Probabilistic time scheduling.”J. Constr. Div., ASCE, 102(3), 415–423.
3.
Crandall, K. C. (1977). “Analysis of schedule simulations.”J. Constr. Div., ASCE, 103(3), 387–394.
4.
Crandall, K. C., and Woolery, J. C. (1982). “Schedule development under stochastic scheduling.”J. Constr. Div., ASCE, 108(2), 321–329.
5.
Diekmann, J. E. (1983). “Probabilistic estimating: mathematics and applications.”J. Constr. Engrg. and Mgmt., ASCE, 109(3), 297–308.
6.
Monte Carlo;ot Version 2.0. (1993). Primavera Systems, Inc., Bala Cynwyd, Pa.
7.
Neil, J. N. (1986). “Project control for engineering.” Publication No. 6-1, Construction Industry Institute, Austin, Tex.
8.
Neil, J. N. (1987). “Project control for construction.” Publication No. 6-5, Construction Industry Institute, Austin, Tex.
9.
Oberlander, G. D. (1993). Project management for engineering and construction. McGraw-Hill, New York.
10.
Pritsker, A. A. B., and Sigal, C. E. (1983). Management decision making: a network simulation approach. Prentice-Hall, Englewood Cliffs, N.J.
11.
Pultar, M. (1990). “Progress-based construction scheduling.”J. Constr. Engrg. and Mgmt., ASCE, 116(4), 670–688.
12.
Rao, G. N., and Grobler, F. (1995). “Integrated analysis of cost risk and schedule risk.” Proc., Comp. in Civ. Engrg., ASCE, New York, 1404–1411.
13.
@RISK for Project;ot. (1993). Palisade, Inc., Newfield, N.Y.
14.
Senior, B. A. (1995). “Simulation and critical path method software connectivity.” Proc., Comp. in Civ. Engrg., ASCE, New York, 1412–1419.
15.
Sha′ath, K. K., and Singh, G. (1994). “A PC-based stochastic project scheduling and costing module.” Proc., Comp. in Civ. Engrg., ASCE, New York, 9–16.
16.
Singh, A. (1991). “Developing and implementing C-SCSC.”J. Profl. Issues in Engrg. Educ. and Pract., ASCE, 117(3), 295–308.
17.
Stevens, W. M. (1983). “Cost control: integrated cost/schedule performance.” Proc., Improving Productivity, ASCE, New York, 16–27.
18.
Touran, A. (1993). “Probabilistic cost estimation with subjective correlations.”J. Constr. Engrg. and Mgmt., ASCE, 119(1), 58–71.
19.
Touran, A. (1994). “Probabilistic modeling of scheduling uncertainty: methods and tools.” Proc., Comp. in Civ. Engrg., ASCE, New York, 380–383.
20.
Ward, S. A., and Lithfield, T. (1980). Cost control in design and construction. McGraw-Hill, New York.
Information & Authors
Information
Published In
History
Received: Dec 4, 1998
Published online: Mar 1, 2000
Published in print: Mar 2000
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.