Project Performance Control in Reconstruction Projects
Publication: Journal of Construction Engineering and Management
Volume 126, Issue 2
Abstract
Cost, schedule, and quality are the main indicators of performance in construction projects. These indicators are highly interrelated and require some balance and trade-off among them to achieve efficient overall control over project performance. Focusing on these performance indicators, the primary objective of this study is to investigate the use of conventional control techniques in projects involving reconstruction of occupied buildings. To facilitate this analysis, performance data have been collected, using a questionnaire survey, from 25 reconstruction and 15 new construction projects. The survey was followed by structured interviews with construction practitioners and project participants to elicit success-related factors and to identify some of the unique problems affecting the control of reconstruction projects. Using the collected data, performance comparison was conducted between new and reconstruction projects along with a detailed analysis of the suitability of existing techniques for the control of the cost, schedule, and quality in reconstruction projects.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Ahuja, H. N., Dozzi, S. P., and Abourizk, S. M. (1994). Project management techniques in planning and controlling construction projects. Wiley, New York.
2.
Attalla, M. ( 1996). “Reconstruction of occupied buildings, project control techniques,” MS thesis, University of Waterloo, Waterloo, ON, Canada.
3.
CII. (1988). “Work packaging for project control.” Publ. 6-6, Construction Industry Institute, Austin, Tex.
4.
CII. (1991). “Organizing for project success.” Publ. 12-2, Construction Industry Institute, Austin, Tex.
5.
Cole, L. J. R. (1991). “Construction scheduling: Principles, practices, and six case studies.”J. Constr. Engrg. and Mgmt., ASCE, 117(4), 579–588.
6.
Gibson, G. E., and Hamilton, M. R. (1994). “Analysis of pre-project planning effort and success variables for capital facility projects.” Rep. Source Document 102, Construction Industry Institute, Austin, Tex.
7.
A guide to the project management body of knowledge. (1996). Project Management Institute, Drexel Hill, Pa.
8.
Krizek, R. J., Lo, W., and Hadavi, A. (1996). “Lessons learned from multiphase reconstruction project.”J. Constr. Engrg. and Mgmt., ASCE, 122(1), 44–54.
9.
Ledbetter, W. B. (1994). “Quality performance on successful projects.”J. Constr. Engrg. and Mgmt., ASCE, 120(1), 34–42.
10.
Lee, J. H. ( 1996). “Statistical deterioration models for condition assessment of older buildings,” PhD thesis, Wayne State University, Wayne, Nebr.
11.
McKim, R., and Attalla, M. (1998). “Reconstruction of occupied buildings, project control techniques—A Canadian study.” Proc., 1st Int. Conf. on Civ. Engrg., Helwan University Press, Egypt, 439–453.
12.
McMullan, L. E. (1996). “Cost forecasting—Beyond the crystal ball.” Proc., AACE Int. 40th Annu. Conf., AACE International, Morgantown, W.Va.
13.
Parker, D. E. (1994). “Project budgeting for buildings.” Cost Engrg., 36(12), 13–18.
14.
Popescu, C. M., and Charoenngam, C. ( 1995). Project planning, scheduling and control in construction. Wiley, New York.
15.
Project controls: Needs and solutions. (1987). ASCE, New York.
16.
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., and Coyle, M. (1992). “Critical success factors for construction projects.”J. Constr. Engrg. and Mgmt., ASCE, 118(1), 94–111.
17.
Sanvido, V., and Riggs, L. S. (1993). “Managing successful retrofit projects.” Cost Engrg., 35(12), 25–31.
18.
Statistics Canada. (1998). “Gross domestic product.” Internet Site. 〈www.census.gov/const/www/cci/ccidef.html#cv〉
19.
U.S. Census Bureau. (1998). “Construction business.” Internet Site. 〈www.statcan.ca/english/econoind/gdpm.htm〉
20.
Weston, D. C., and Gibson, G. E., Jr. (1993). “Partnering-project performance in the U.S. Army Corps of Engineers.”J. Mgmt. in Engrg., ASCE, 9(4), 410–425.
Information & Authors
Information
Published In
History
Received: Feb 11, 1998
Published online: Mar 1, 2000
Published in print: Mar 2000
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.