Location Optimization for a Group of Tower Cranes
Publication: Journal of Construction Engineering and Management
Volume 125, Issue 2
Abstract
A computerized model to optimize location of a group of tower cranes is presented. Location criteria are balanced workload, minimum likelihood of conflicts with each other, and high efficiency of operations. Three submodels are also presented. First, the initial location model classifies tasks into groups and identifies feasible location for each crane according to geometric “closeness.” Second, the former task groups are adjusted to yield smooth workloads and minimal conflicts. Finally, a single-tower-crane optimization model is applied crane by crane to search for optimal location in terms of minimal hook transportation time. Experimental results and the steps necessary for implementation of the model are discussed.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Choi, C. W., and Harris, F. C. ( 1991). “A model for determining optimum crane position.” Proc., Instn. Civ. Engrs., Institution of Civil Engineers, London, Part 1, 90, 627–634.
2.
Emsley, M. W. ( 1992). “Discussion on a model for the selection of the optimum crane for construction sites.” Proc., Instn. Civ. Engrs., Struct. and Buildings, 94, 503–504.
3.
Farrell, C. W., and Hover, K. C. ( 1989). “Computerised crane selection and placement for the construction site.” Proc., 4th Int. Conf. on Civ. and Struct. Engrg. Computing, CIVIL-COMP Press, Edinburgh, U.K., 1.
4.
Furusaka, S., and Gray, C. ( 1984). “A model for the selection of the optimum crane for construction sites.” Constr. Mgmt. and Economics, 2, 157–176.
5.
Gray, C., and Little, J. ( 1985). “A systematic approach to the selection of an appropriate crane for a construction site.” Constr. Mgmt. and Economics, 3, 121–144.
6.
Kogan, J. ( 1976). Crane design—Theory and calculation of reliability. Wiley, New York.
7.
Warszawski, A. (1973). “Analysis of transportation methods in construction.”J. Constr. Div., ASCE, 99(1), 191–202.
8.
Warszawski, A. ( 1990). “Expert system for crane selection.” Constr. Mgmt. and Economics, 8, 179–190.
9.
Wijesundera, D. A., and Harris, F. C. ( 1986). “Computer simulation for materials handling in high rise construction.” Proc., Int. AMSE Conf. on Modelling and Simulation, Sorrento, Italy, 4.4, 81–95.
Information & Authors
Information
Published In
History
Received: Feb 12, 1996
Published online: Mar 1, 1999
Published in print: Mar 1999
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.