Many repetitive construction field operations exhibit a phenomenon known as the learning or experience effect. A learning curve is generated when the time or cost required to complete one cycle of an activity is plotted as a function of the cycle number. For practicing construction engineers and managers, the greatest potential value of learning curves lies in their ability to predict future performance, instead of fitting historical data. This paper presents a new method for using learning curves to predict the time or cost to complete the remaining cycles of an activity in progress, to assess the accuracy of this method, and to compare the accuracy of this method with the standard forecasting technique used in construction cost reporting. Using the proposed method, the accuracy of predicting the time or cost required to complete an ongoing activity improves dramatically for about the first 25–30% of the activity and then levels off to within 15–20% of the actual value. Compared to the standard method using the cumulative average, the new learning curve method is shown to be more accurate. The analysis quantifies the trade-off between accuracy of predicting future performance and the timeliness and potential value of such a prediction.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
An improved rationale and mathematical explanation of the progress curve in airframe production. (1949). Stanford Res. Inst., Stanford, Calif.
2.
Carlson, J. G. H.(1973). “Cubic learning curves: precision tool for labor estimating.”Manufacturing Engrg. and Mgmt., 67(11), 22–25.
3.
“Effect of repetition on building operations and processes on site.” (1965). Rep. ST/ECE/HOU/14, United Nations Committee on Housing, Build., and Plng., United Nations, New York, N.Y.
4.
Everett, J. G., and Farghal, S. H.(1994). “Learning curve predictors for construction field operations.”J. Constr. Engrg. and Mgmt., ASCE, 120(3), 603–616.
5.
Everett, J. G., and Farghal, S. H. (1995). “Data representation for predicting performance with learning curves.”Tech. Rep. 95-11, Ctr. for Constr. Engrg. and Mgmt., Dept. of Civ. and Envir. Engrg., Univ. of Michigan, Ann Arbor, Mich.
6.
Everett, J. G., and Slocum, A. H.(1992). “CRANIUM: device for improving crane safety and productivity.”J. Constr. Engrg. and Mgmt., ASCE, 119(1), 23–39.
7.
Farghal, S. H., and Everett, J. G. (1994). “Learning curves as time and cost predictors for construction field operations.”Tech. Rep. 94-21, Ctr. for Constr. Engrg. and Mgmt., Dept. of Civ. and Envir. Engrg., Univ. of Michigan, Ann Arbor, Mich.
8.
McClain, J. O., and Thomas, L. J. (1980). Operations management: production of goods and services. Prentice-Hall, Inc., Englewood Cliffs, N.J.
9.
McClure, R. M., Thomas, H. R., and Hehler, J. E. (1980a). “Construction of experimental segmental bridge.”Rep. Prepared for the Commonwealth of Pennsylvania Dept. of Transp., Pennsylvania Transp. Inst., Philadelphia, Pa.
10.
McClure, R. M., Willenbrock, J. H., and Henderson, J. D. (1980b). “Fabrication of segments for an experimental segmental bridge.”Rep. Prepared for the Commonwealth of Pennsylvania Dept. of Transp., Pennsylvania Transp. Inst., Philadelphia, Pa.
11.
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction. McGraw-Hill Book Co., Inc., New York, N.Y.
12.
Thomas, H. R., Mathews, C. T., and Ward, J. G.(1986). “Learning curve models of construction productivity.”J. Constr. Engrg. and Mgmt., ASCE, 112(2), 245–258.
13.
Wright, T. P. (1936). “Factors affecting the cost of airplanes.”J. Aeronautical Sci., (Feb.), 124–125.
Information & Authors
Information
Published In
Copyright
Copyright © 1997 American Society of Civil Engineers.
History
Published online: Mar 1, 1997
Published in print: Mar 1997
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.